CERN 1st October 2009www.cern.ch/aceole/meetings ACEOLE: WP6 From Annex I: “Work package 6 covers research contributions, transfer of knowledge and planning of conferences, workshops and training courses by visiting scientists”. Status and results of milestones and deliverables foreseen in Annex I 1.Organisation of meetings, training courses, conferences and workshops 2.Visiting Scientists 3.Dissemination of results by Researchers.
ConferenceDuration /Freq.Focus Relevant WP EPs* CERN school of Computing 10 day / AnnualTraining young scientists/engineers in information technology 5- Topical Workshop on Electronics for Particle Physics 5 day / AnnualMicroelectronics and optoelectronics in physics 1,2,3,45 IEEE NPSS Real Time Conference 6 day / BiennialReal time computing applications in physics, accelerators, medicine and biology 5- IEEE NPSS Nuclear Science Symposium and Medical Imaging Conference 8 day / AnnualInstrumentation for physics, imaging and space 1,2,3,41.7 Computing in High Energy and Nuclear Physics Conference 5 day / every 18 months Informatics in particle and nuclear physics Medipix1 day / TriannualPixel detectors in Medical applications 1- LHC Expts + wrap-upVariableHardware & software in LHC expts.1,2,3,4,53.3 Total13.3 Deliverables in Annex I: Conferences and workshops 3 annual conferences × 1.7 external participant-months = 5 Each conference is 1.7 EPs = 50 days 2 conferences × 1.7 external participant-months = 3.3 Each conference is 1.7 EPs = 50 days 1 conferences, Valencia, 2011
IEEE NSS/MIC IEEE NSS/MIC CHEP Timeline: Conferences and workshops Wrap up LHC exps TWEPP ??? Done! Planning
CERN 1st October 2009www.cern.ch/aceole/meetings Organisation of meetings, training courses, conferences and workshops At the 17th International Conference on Computing in High Energy and Nuclear Physics (CHEP), ACEOLE sponsored the Online Track (80 xITN) and funded 13 bursaries for promising young researchers. Number of Researchers from outside the network = 80 (MS 50) Number of Researcher days from outside the network 40*1 +13*5 = 105 (MS 50) At the Topical Conference on Electronics in Particle Physics (TWEPP 2009). 230 (xITN) scientists attended the workshop. During the Plenary three speakers, invited by ACEOLE, gave talks for 45 minutes. ACEOLE also supported a 3 hour tutorial attended by 37 people and funded 5 bursaries for promising young researchers outside the network. Number of Researchers from outside the network = 230 (MS 50) Number of Researcher days from outside the network = ((230*3*3/4)+(3*37)+(5*40))/8 = 104 (MS 50) Results: Conferences and workshops
CERN 1st October 2009www.cern.ch/aceole/meetings CHEP 2009 Online Track
CERN 1st October 2009www.cern.ch/aceole/meetings Associated Partner Visiting Scientist Visit length (months) W.P. for research & TOK Training topic No. training hours AGHSenior Physicist13 Architectures, performance requirements and limitations to implementing front-end electronics for silicon tracking detectors at the SLHC and/or other relevant topics 10 INESCSenior Engineer24.2 Optical sources (laser diodes, EOM, EAM); Device characterization & fibre optic measurement techniques. Extraction of laser diode parameters. S-parameters/ network analyzer measurements. 6 INESCSenior Engineer12 Redundancy & DFT & BIST techniques of RF, analogue & mixed-signal ASICs; Dynamic characterization of A/D converters. 6 LNL Legnaro Senior Applied Physicist 35 Control and monitoring of large and widely distributed systems. 15 PANalyticalSenior Engineer11 Principles and techniques of x-ray materials analysis using diffraction and fluorescence. 10 SCK.CENSenior Engineer Reliability and radiation-tolerance qualification of optoelectronics components for extremely high dose applications 8 UCLSenior Engineer Network architecture, traffic, switching; Optical networks & topologies, Optical network standards, WDM networks & technologies. Communications circuits and ASIC design. 10 UCLSenior Engineer14.1 Core & access optical networks, Multiplexing technologies, transmission technologies, switching technologies, Devices & implementation, Network performance & measurements, optical networks for radio applications. 10 VTTSenior Engineer24.4Photonic packaging and integration.8 VTT Senior Research Engineer 11 High-density array interconnect technology, Heterogeneous integration by direct silicon wafer bonding 3 Deliverables in Annex I : Visiting Scientists Total “Training hours” = 86Total 15 “Visit Months”
CERN 1st October 2009www.cern.ch/aceole/meetings Two training courses were held by Visiting Scientists. In addition to the Researchers, each course bought in over 50 people outside the network. ACEOLE Training event: The Where, Why and How of Optical Access by Dr. John Mitchell (University College London). (2 hours) ACEOLE Training event: High speed design in a chassis environment, by Joel Goergen (2 hours) So we have 4 out of 86 “Training Hours”... But the EC paid for and expects 15 “Visit Months” and so far we have 0! New rules (which may help): Visiting Scientists may come from anywhere but must cover the topics in Annex I. We have to get more “Visit Months” !! Results: Visiting Scientists
CERN 1st October 2009www.cern.ch/aceole/meetings During the reporting period 46 reports have been written by the researchers. ATelesca_AdvancedStornextFileSystem_10-11Mar2009.pdfATelesca_AdvancedStornextFileSystem_10-11Mar2009.pdf 03/04/ :12 Adriana Telesca ATelesca_CSC2009.pdf 04/09/ :58 Adriana Telesca ATelesca_IEEE_RT09NPSS_Conference_10-15May2009.pdf 09/06/ :41 Adriana Telesca ATelesca_QlogicFCSpecialist_17- 19Feb2009.pdf 03/04/ :12 Adriana Telesca ATelesca_StornextFileSystem_13-15Jan2009.pdf 03/04/ :12 Adriana Telesca Bochenek_Feb2009_ISSCC2009.pdf 16/09/ :46 Michal Bochenek Bochenek_Jun2009_LP-LVAnalogICDesign.pdf 16/09/ :46 Michal Bochenek Bochenek_Mar2009_ACES2009.pdf 18/09/ :40 Michal Bochenek Bochenek_May2009_ESI2009.pdf 16/09/ :46 Michal Bochenek Bochenek_Nov2008_OpAmps_TheoryAndDesign.pdf 17/09/ :15 Michal Bochenek CardosoJP Report EPFL 28Jun-01Jul pdf 07/08/ :11 Robert McLaren GarnierJ_ _FTOSCourse.pdf 03/04/ :12 Jean-Christophe Garnier GarnierJ_ _CHEP09.pdf 28/06/ :35 Jean-Christophe Garnier GarnierJ_ _IEEERT09.pdf 28/06/ :34 Jean- Christophe Garnier HVersmissen_12Aug09_Meeting-Report-VTT-Oulu.pdf 25/08/ :38 Hans Versmissen McLarenR_ _Trip_report_from_CHEP_2009.pdf 03/04/ :12 Robert McLaren NeufeldGarnier_ _PH-ESE-F10- Seminar.pdf 26/05/ :21 Jean-Christophe Garnier Plackett Travel_Report_Organisation.docx 25/09/ :07 Richard Plackett Plackett travel_report_Secondment.doc 25/09/ :07 Richard Plackett Plackett VERTEX09 Visit.docx 25/09/ :44 Richard Plackett Plackett TWEPP09 Visit.docx 25/09/ :30 Richard Plackett SavuD_ _Course-CA-Spectrum.pdf 03/04/ :12 Dan Octavian Savu SavuD_ _Course-Force10-FTOS.pdf 03/04/ :12 Dan Octavian Savu SavuD_ _Visit-MasterAndMIVImagingVentureLaboratory.pdf 07/05/ :25 Dan Octavian Savu SavuD_ _Conference-CHEP.pdf 27/07/ :01 Dan Octavian Savu Sseifeln_RADECs_2009_Travel_Report.docx 22/09/ :30 Sarah Seif El Nasr ssilva_brief_tech_report_ pdf 07/07/ :48 Sergio Dos Santos Barbosa Oliveira Da Silva SSilva_End_of_Fellowship_ pdf 31/08/ :08 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_icton2009_ c.pdf 27/07/ :18 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_Laser_RIN_ pdf 03/09/ :21 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_ofc2009_report_ pdf 07/07/ :48 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_Report_D421_ pdf 04/09/ :34 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_Report_D422_ pdf 03/09/ :22 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_secondment_report_ pdf 07/07/ :47 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_secondment_report_ pdf 07/07/ :47 Sergio Dos Santos Barbosa Oliveira Da Silva ssilva_twepp09_paper_ssilva_ _draft.docx 04/09/ :33 Sergio Dos Santos Barbosa Oliveira Da Silva Timo Tick Preliminary feasibility study.pdf 05/08/ :13 Timo Tick Timo Tick LTCC technology introduction.pdf 05/08/ :13 Timo Tick Timo Tick BGA interconnection test plan.pdf 05/08/ :13 Timo Tick Timo Tick - Trip report ETCT2009 San Diego.docx 12/06/ :43 Timo Tick Timo Tick_Sami Vahanen Optimized TSV process flow.pdf 05/08/ :15 Timo Tick Timo Tick_Sami Vahanen_Michael Cambpell Through Silicon Via (TSV) - work plan.pdf 05/08/ :15 Timo Tick YLHwong_CHEP2009_23- 27mar2009.pdf 03/04/ :12 Yi Ling Hwong YLHwong_IEEERT2009_10-15May2009.pdf 26/07/ :17 Yi Ling Hwong YLHwong_Trip Report TUE Eindhoven_3-7Aug2009.pdf 25/08/ :46 Yi Ling Hwong.ATelesca_CSC2009.pdfATelesca_IEEE_RT09NPSS_Conference_10-15May2009.pdfATelesca_QlogicFCSpecialist_17- 19Feb2009.pdfATelesca_StornextFileSystem_13-15Jan2009.pdf Bochenek_Feb2009_ISSCC2009.pdfBochenek_Jun2009_LP-LVAnalogICDesign.pdfBochenek_Mar2009_ACES2009.pdfBochenek_May2009_ESI2009.pdfBochenek_Nov2008_OpAmps_TheoryAndDesign.pdfCardosoJP Report EPFL 28Jun-01Jul pdfGarnierJ_ _FTOSCourse.pdf GarnierJ_ _CHEP09.pdfGarnierJ_ _IEEERT09.pdfHVersmissen_12Aug09_Meeting-Report-VTT-Oulu.pdf McLarenR_ _Trip_report_from_CHEP_2009.pdfNeufeldGarnier_ _PH-ESE-F10- Seminar.pdfPlackett Travel_Report_Organisation.docx Plackett travel_report_Secondment.docPlackett VERTEX09 Visit.docxPlackett TWEPP09 Visit.docxSavuD_ _Course-CA-Spectrum.pdfSavuD_ _Course-Force10-FTOS.pdf SavuD_ _Visit-MasterAndMIVImagingVentureLaboratory.pdfSavuD_ _Conference-CHEP.pdfSseifeln_RADECs_2009_Travel_Report.docxssilva_brief_tech_report_ pdf SSilva_End_of_Fellowship_ pdfssilva_icton2009_ c.pdfssilva_Laser_RIN_ pdfssilva_ofc2009_report_ pdf ssilva_Report_D421_ pdfssilva_Report_D422_ pdfssilva_secondment_report_ pdfssilva_secondment_report_ pdf ssilva_twepp09_paper_ssilva_ _draft.docxTimo Tick Preliminary feasibility study.pdfTimo Tick LTCC technology introduction.pdf Timo Tick BGA interconnection test plan.pdfTimo Tick - Trip report ETCT2009 San Diego.docxTimo Tick_Sami Vahanen Optimized TSV process flow.pdfTimo Tick_Sami Vahanen_Michael Cambpell Through Silicon Via (TSV) - work plan.pdfYLHwong_CHEP2009_23- 27mar2009.pdfYLHwong_IEEERT2009_10-15May2009.pdfYLHwong_Trip Report TUE Eindhoven_3-7Aug2009.pdf Dissemination of results by Researchers (No milestones for this point).
CERN 1st October 2009www.cern.ch/aceole/meetings Extra on-the-job project management training 6 month meeting (convenors) 12 month meeting (convenor) Poster session (Organiser) International TDAQ school (Instructors)