Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.

Slides:



Advertisements
Similar presentations
Deliverable #8: Detailed Design - Overview due: Wednesday, 7 March All Deliverable materials are to be posted into Team Concert. Your to.
Advertisements

Software Quality Assurance Plan
IT Requirements Capture Process. Motivation for this seminar Discovering system requirements is hard. Formally testing use case conformance is hard. We.
1 The Business Modeling Discipline. 2 Purpose of Business Modeling  To understand the structure and dynamics of the organization in which a system is.
Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.
OOAD Using the UML - Use-Case Analysis, v 4.2 Copyright  Rational Software, all rights reserved 1/18 Use Case Analysis – continued Control Classes.
Conversation Form l One path through a use case that emphasizes interactions between an actor and the system l Can show optional and repeated actions l.
Requirements Specification
Fundamentals of Information Systems, Second Edition
171 Use Case Descriptions Chapter 4 – Facade Iteration Initial Requirements (Inception Phase)
Use Case Analysis – continued
CSCI 639 Topics in Software Engineering Assignment #4 Fall 2006.
Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.
Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.
Enterprise Architecture
1/ 12 A Use Case-Driven Approach to Requirements Gathering Materials gathered from Chapter 3 (above) – Kulak and Guiney and Use Case Driven Object Modeling.
Project Overview for CEN 4010 The team projects will consist of a series of iterations which are composed of a number of ‘activities’ which we will call.
What is Business Analysis Planning & Monitoring?
RUP Requirements RUP Artifacts and Deliverables
® IBM Software Group © 2006 IBM Corporation Writing Good Use Cases Module 4: Detailing a Use Case.
Rational Unified Process Fundamentals Module 4: Disciplines II.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Project Overview for CEN 4010 The team projects will consist of a series of iterations which are composed of a number of ‘activities’ which we will call.
Project Deliverables CEN Engineering of Software 2.
17 1 Use Case Descriptions Chapter 4 – Facade Iteration Requirements Inception Phase.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Requirements Specification for Lab3 COP4331 and EEL4884 OO Processes for Software Development © Dr. David A. Workman School of Computer Science University.
Software Requirements (Advanced Topics) “Walking on water and developing software from a specification are easy if both are frozen.” --Edward V Berard.
171 Use Case Descriptions Chapter 4 – Facade Iteration Initial Requirements (Inception Phase)
Software Engineering II - CEN 6017 Project Deliverables for Spring
Requirements as Usecases Capturing the REQUIREMENT ANALYSIS DESIGN IMPLEMENTATION TEST.
Requirements Capture. Four Steps of requirements capture List candidate requirements Understand system context Capture functional requirements Capture.
Project Deliverables Version 1: 08/30/2005 Note: This document contains the deliverables for a two semester course. These items WILL change as the courses.
1 Software Requirements l Specifying system functionality and constraints l Chapters 5 and 6 ++
Rational Unified Process (RUP) Process Meta-model Inception Phase These notes adopted and slightly modified from “RUP Made Easy”, provided by the IBM Academic.
Project Deliverables CIS 4328 – Senior Project 2 And CEN Engineering of Software 2.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Project Deliverables CEN Engineering of Software 2.
Project Deliverables Version 4: 10/30/2006 Deliverable 4 Added.
Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.
Project Deliverables Version 3: 02/14/2007 Deliverable 3 Posted Version Numbers will reflect added Deliverable numbers.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Software Engineering II - CEN 6017 Project Deliverables for Spring
Project Deliverables Deliverable 2 Posted Version Numbers will reflect added Deliverable numbers.
Project Deliverables Version 3: 10/25/2005 Note: This document contains the deliverables for a two semester course. This document includes Deliverables.
Homework #8 - Deliverable 5 due: 2 December 1. Exec Summary 2. Revisit Use Cases 3. The Analysis Model Class Diagrams Interaction Diagrams 4. Non-Functional.
Project Deliverables CIS 4328 – Senior Project 2 And CEN Engineering of Software 2.
Project Deliverables Deliverable 1 Posted Version Numbers will reflect added Deliverable numbers.
Project Deliverables Deliverable 4 Posted (revised 10/30/2007) Version Numbers will reflect added Deliverable numbers.
Project Deliverables Version 8: 11/23/04 Final Final Version for First Semester.
Project Deliverables Version 3: 10/04/2006 Deliverable 3 Added.
Project Deliverables Version 9: 04/03/06 Note: This document contains the deliverables for a two semester course. It is a living document and changes every.
Use Cases Discuss the what and how of use cases: Basics Examples Benefits Parts Stages Guidelines.
Version Numbers will reflect added Deliverable numbers.
Project Deliverables Version 1: 7/13/2006.
Use Cases Discuss the what and how of use cases: Basics Benefits
Project Deliverables Deliverable 5 Posted (revised 11/12/2007)
Version Numbers will reflect added Deliverable numbers.
Project Deliverables Deliverable 5 Posted (revised 11/12/2007)
Version Numbers will reflect added Deliverable numbers.
Project Management Process Groups
Version 5: 11/15/2006 Deliverable 5 Added
Project Deliverables Deliverable 4 Posted (revised 10/30/2007)
Business Modeling - Domain Analysis
Version Numbers will reflect added Deliverable numbers.
CIS 4328 – Senior Project 2 And CEN Engineering of Software 2
Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately.
Version Numbers will reflect added Deliverable numbers.
Version Numbers will reflect added Deliverable numbers.
Use Case Analysis – continued
Presentation transcript:

Project Deliverables This is an iteration-based project. All artifacts of each Iteration are to be posted in Rational Team Concert (RTC), which is separately documented with accompanying tutorials on my web page. See Course Lecture Notes. Each Iteration consists of a number of ‘deliverables’ in the context of RTC are referred to as Work Items Initially – for Iteration 0, you may include Work Items in the RTC/Change and Configuration Management (CCM) portion of RTC. The deliverables in Iteration 0 are items of work. Later, when specific products are developed, they will be entered as ‘artifacts’ in Requirements Management. Work items are activities usually resulting in producing an artifact constituting part of each deliverable.

Executive Summary Every iteration will include an Executive Summary. This is to be a single page document and should summarize the contents of the iteration: What work items were undertaken (list) What work items may have been changed Note: revising artifacts is the norm in an iterative approach to software development. Identify Risks as a Work Item (elaborated upon ahead). Executive Summary is likely developed by team lead and backup.

Rational Team Concert Rational Team Concert (RTC) will be the tool of choice for CEN 6016 and CEN All work items and artifacts for each iteration will be posted to appropriate places in your team’s project area. A set of tutorials on RTC has been developed for your use and will guide you.

Rational Team Concert Tutorials include basic information on ALM/CLM, creating and managing a Jazz account, creating a new project, managing requirements with Rational Requirements Composer (RRC), creating iterations, work items, establishing the Eclipse client for your use, source control (your programming), change sets, and linking work items and change sets. (More will be coming later.) The team is responsible for familiarizing themselves with this very popular new development environment.

Work Items Each iteration consists of work items undertaken. Each Work Item will be posted to your project area in RTC, along with the name(s) of the individual(s) primarily responsible for accommodating each work item. Some of these items may be Word documents, others graphical models, tables, answers to questions, and assessments. (A few initial work items will be placed in Configuration and Change Management (SSM) part of RTC.) Some work items will be done by individuals; others by more than one team member. Work Items will include all of your basic work item artifacts / activities including all business modeling, requirements, analysis and design, testing, management, deployment, and implementation modeling items.

Grammar, Wording, and Professionalism Under NO circumstances will poor grammar or ill-conceived sentences be considered acceptable work. Remember: you only get one chance to make a first impression. Poorly done work will really hurt your grade and perception of what otherwise might be high-quality work. This is a graduate level course and mature, professionalism is expected. EACH work item of EACH iteration must be reviewed While the Quality Assurance Manager (ahead) may be the one primarily responsible for grammar and wording, please recognize that this is a TEAM responsibility!! I cannot stress too strongly emphasis placed on professionalism in organization, content, presenting and reporting.

Iteration #0 due 5 Sep 2012 – Start of Class Team Formation, Project Identification, Roles, Methodology, Special Topics

Important Be certain you add me as a project participant along with other team members. Give me all permissions, please. Also, when you load documents to Work Items, please convert them so I don’t have do and I have easy access to them. Lastly, Iteration 0 will be graded. As grades / comments are entered by me into RTC, please share with all team members. Even if the ‘comments’ I offer only go to the work item owner.

Work Item: Executive Summary Project Title Standard contents (see previous generic description) Project lead (interim or permanent) will develop the Executive Summary Describe in summary form the work items undertaken for this iteration. (Details will follow and should not be included in this summary) Include any issues encountered.

Work Item: Risk List Risks will be identified, quantifed, and prioritized. See Risk List in the Word Templates links provided. Undertake an initial risk assessment as best you are able at this time. It will change. In the Iteration Assessment, risk mitigation must be addressed.

Work Item: Team Formation List the team members by name and the role(s) each will undertake. Use the descriptors on the next slide. Please realize this may change and be modified as individuals take on new roles as the project evolves, but you should make every effort to nail down roles. (See Target Organization Assessment in Templates.)

Team Roles and Responsibilities (sample roles) Team lead and backup: Team Quality Assurance Manager : (responsible for ensuring all work items are properly reported, formatted, included on time and more; responsible for work item reports to RTC) Business Analysts (Requirement Specifications) Application Designers (Modelers; architects) Application Programmers (API / IDE specialists) Database specialists (database designers; interfacing…) Testing and Reporting ( business analysts; others)

Work Item: Approved Project Description Topic must be pre-approved well before it becomes a part of this iteration. Include full write up. Title Description – several paragraphs Need – Significance? Usefulness? Clients? Availability of Resources to Specify Sources of knowledge Overall Software Development Plan (See Software Development Plan in Templates) It is conceivable that you may not have this item thought out yet. But give it a shot. Will change later.

Work Item: Iteration Assessment Frank assessment of iteration 0. (5-10 minutes) One or more team members will report on Iteration 0 in classroom setting. (good, bad, and ugly) What can be done to improve this process? Iteration 0 will be graded. Grades: not team grades. Individual Peer Reviews must be submitted no later than class time on the date on which the Iteration Reports are due/presented. Likely accomplished by Team Leader See Iteration Assessment in Templates

Work Item Quality Manager’s Certification I certify that to the best of my ability all work items have been completed and are included in the iteration report. _____ Quality Manager’s (QMgr) Initials _____ Team Leader’s (TL) Initials Comments optional. (completed by QMgr and TL)

Iteration #1 Business Modeling (Domain Analysis)

Iteration #1 Business Modeling Business Domain Analysis Due: Wednesday, October 3 rd Purpose: To understand the structure and dynamics of the organization within which the application will operate; To ensure customers, end-users, and developers understand the organization; To derive requirements on systems to support the organization;

Iteration 1 – Business Modeling and Domain Analysis Work Items Team Member’s Statement of Work (See link on web page) Business Vision Document – See templates. Business Use Case Model – See templates Use an approved graphical tool. (Tentatively assigned.) Business Glossary – See templates Business Rules – See templates Business Risk List – See templates; Revise Iteration 0 This is a hefty assignment. Start early!!

Work Item: Executive Summary See slide 2. Overview of the iteration from top to bottom. No more than one page.

Work Item: Statement of Work You are to include each individual team member’s statement of work (SOW) Develop a document of sequential SOWs and include as a work item.

Work Item: Business Vision Document (1 of 2) Use the appropriate forms on my web page: Link to Useful Templates You Will Need. This is a Word document. This captures the purpose of the application domain. What services are they providing? What are they all about? Who are the customers? What are the goals of this business? Primary stakeholders?? Points of contact: s and telephone and any notes such as availability / non-availability; where they work, office symbols, tech support, BAs, etc. This is NOT a product vision document (the product you will develop). This is about the business, enterprise, environment.)

Business Vision Document (2 of 2) Use the Business Vision Template (see web page) but you must MODIFY it so that it does NOT address a project; rather, it will capture the vision of the enterprise itself. Normally, in “Stakeholders,” we address those interests NOT from a project perspective but from an organization’s perspective: customers, users, etc. In our case, address the interests of the stakeholders for the projects you are undertaking. There is no Product Overview But your business vision document should address what the business is all about. Add major sections that you deem appropriate.

Work Item: Business Use Case Model Use the Business Use-Case template. Simple in structure. See pp in the RUP textbook. You only need show the Model (with actor and business use case icon) (top part of figure 8.5) (Single page) You do NOT have to display the Business Use Case spec. Each use case is identified and actors who interact with this and each business use case. A Business Use Case Diagram (the top part of Figure 8-5) is developed in verb…object format. All major use cases and actors should be captured in this business model. See link to sample on my web page. Note: Develop this artifact in the Use Case View, Business Use Case Model using a pre-approved tool set.

Work Item: The Business Glossary (1 of 2) Use the Business Glossary template. Definitions of important terms used in the business. (alphabetical) Key words: (sometimes these are called ‘core abstractions.’ ) These are often the ‘things’ the business deals with. Business Entities. Nouns. A Student Registration system might have key words like Course, Schedule, Payment, Registration, Student, Professor, …. What is needed here are acronyms, important definitions, basically the jargon of the organization. These will be heavily referred to when we do use cases!

Business Glossary (2 of 2) Another key component of domain analysis is the domain model (next deliverable). Here, we supplement the glossary by adding in a graphical mode – business entities, their relationships and associations: (What’s important in business entities are the ‘attributes.’ So, for example, if you were defining a Student business entity, you might include things like: ssan, classification, gender, major, gpa, projected graduation date, ACT/SAT scores, etc. We do NOT worry about (and do NOT include) methods This, however, is for the next deliverable.) This, however, is for the next deliverable.)

Work Item: The Business Rules Use the Business Rules template. See examples on my web page. These are merely samples. Be careful: The samples on my web page are Rules for an Application. In principle, the formal approach is to develop business rules for the entire organization and not for the specific application domain. For our projects this year, you are to develop business rules for the specific application domain for which we will be developing the application. Business Rules are policy declarations or conditions or guidelines that must be satisfied in running the business.

Work Item: The Business Risks Use Business Risks template. What are some of the risks that the organization and developers must be constantly assessing: Clients: market share, technology awareness, new statutes from Washington D.C., the state of Florida; trends in the industry; demographics; Developers: Revisit your Risks from Deliverable 0 to update: include environmental considerations; personnel risks; technology risks; economic risks; time constraints; give this some thought….

Iteration #2 due: Wednesday, Oct 17th Executive Summary Iterate Previous Work Team Statement of Work Domain Model The Product Vision Document (Problem Statement) Features List Quality Manager Assessment

Work Item: Domain Model This is a major effort that takes into consideration attributes, multiplicities, associations, etc. Be careful. the Domain Model may look like a Database Schema. It isn’t. It is similar – to a degree – to a Fully Attributed List in the Logical Model – but there are differences. Notice also – a good domain model does not have methods (responsibilities) – only attributes and connections (associations/ dependencies) There is a decent link to a student example on my web page.

Domain Model - continued The Domain Model is an extension of Deliverable 1. It deals with the enterprise / organization and is essential to understanding the environment (in terms of the business entities) within which the application to be developed will function. It is an essential artifact.  See Lecture slides on the Domain Model and the textbook.

Work Item: Product Vision Statement See lecture slides and templates provided on my web page. I am after a short description (paragraph at most) for the Product Vision. This results in scoping the project (together with Needs and Features ahead. The Product Features Section (section 5) is essential and is to include identification of stakeholder needs and their mapping to features via the traceability matrix shown in referenced articles. The QA individual must develop a Traceability Matrix that maps Features back to Needs (here). So the SQA will have two matrices prepared. (See sample article for guidance)

More on Needs and Features When we are dealing with ‘needs’ and ‘features’ we are dealing with reasonably high levels of abstraction. But it is critical to capture the features in the Vision Document for a new application, because it is these features that must be accommodated in the delivered system. Needs are higher level and often include very high level statements of desired needs not all of which are features which can be implemented in a system. The Features drive the development of the use cases – our functional requirements, and the development of our supplementary specifications – our non-functional requirements.

More on Sample Features Features are not behavioral (like the Use Cases - coming). These are typically text descriptions. See text books. Example of features: (We will discuss) ClassicsCD.com Web Shop Need a Secure payment method. There must be easy browsing for available titles. Users need the ability to check the status of an order. Application must provide Customer notification. The catalog shall be highly scaleable to include many titles and effective searching through those titles. The Customer shall be able to customize the Web site. The Customer shall be able to register as a user for future purchases without needing to re-enter personal information.

Iteration #3 due: ~Wednesday, Oct 31st Executive Summary Iterate Previous Work Team Statement of Work Use Case Index Use Cases including all Façade and Filled (basic use cases and those containing happy path Traceability Matrices Quality Manager Assessment

Iteration #3 – Work Items - Overview 1. Executive Summary. Summarize the Iteration. 2. Iterate / Review / upgrade previous artifacts including the Features List Based on evaluation of your iteration, Your changes should be annotated in the Executive Summary. All previous deliverables should be reviewed and potentially updated. 3. Team Statement of Work Assigning responsibilities to different roles to be accommodated on the team. This text document should be developed by the team leader in concert with individuals. Team leader must provide direction and guidance. All tasks and sub-task-ids should be clearly delineated. Team members decide on allocation of Work Items. 4. Update Features List to cover but not exceed Scope; Add comments. 5. Provide Use Case Index (see slides for examples and description) 6. Provide Use Case Diagrams for each use case specification (may include with the Use Case Specification (Narrative). 7. Provide Use Cases: one set of filled use cases (use case that includes only the happy path) 8. *Provide complete use cases (all alternatives / exceptions included) (coming) 9. Provide Traceability Matrices for Needs to Features to Use Cases and vice versa Quality Manager’s certification artifacts are reviewed.

Work Item: Executive Summary As previously done. Summarize the Iteration. The good, bad, and ugly. Assess how all went and ways to improve Overview of artifacts developed and your assessment of them. How did the team do? No more than one page.

Work Items: Review Previous Artifacts Review primary Needs and Features recognizing team members know more about the application domain. Review and update the domain model to include additional / modified business entities.

Work Item: Statement of Work You are to include the Statement of Work from my web page updated with this Iteration’s efforts. Include each individual team member’s statement of work (SOW). I am after a personal self-assessment as well from individuals. Remind all team members to their personal self-assessments / team assessments to me.

Work Item: Update Features List Update Features list with current knowledge.

Work Item: Create Use Case Index See examples on my web page. This is a one-pager listing the use cases to come. Each entry should have a short user- stories as the description of the use case.

Work Item: Develop Use Case Diagrams Develop Use Case Diagrams to include actors and use cases. You may include individual use-case diagrams with their specific use case specification, if you wish. Not a bad idea, however, to have them all listed one after the other here…

Work Item: Develop Use Case Specifications The use cases are to be (first) a set of façade level use cases. Secondly, each use case is to have a second one that includes a the basic couse of events. Be aware, the next iteration will have all alternatives / exceptions developed…

Work Item: Develop Traceability Matrices There needs to be a traceability matrix outlining needs mapped to features mapped to use cases. See examples in my slides and in the article by Leffingwell.

Work Item: Quality Manger’s Certification Need sign off that the entire team approves of the deliverable constituting the third Iteration.

That’s it for now.