Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.

Slides:



Advertisements
Similar presentations
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Advertisements

David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
El Cajon Courtyard Excel Hotel Group July 1, 2014.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
Module 3 Counterpart Regulations Standards of Review for Determining Project Effects.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
City of North Miami Beach Quarterly Financial Analysis Second Quarter – FY 2015 Data as of March 31, 2015.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
The Identification, Life History, and Habitat Requirements of the Wildlife Viewer 2002 Mark Damian Duda Responsive Management October 2002.
WEST BERKELEY PROJECT Master Use Permits (MUP) May 15, 2012 Response to Concerns & Issues.
Coastal Management Issues and Strategies: State and Municipal
Transmission Siting Considerations, Best Practices, and Lessons Learned Gary Graham, Ph.D. Transmission Project Director.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Drakes Estero Point Reyes National Seashore. History of DBOC permit violations In February 2012, the California Coastal Commission advised DBOC that.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
Managing the Scallop Dive Fishery (Port Phillip Bay) Fishery.
A NEW STORAGE OPTION FOR SMALL BOATS BOAT CENTRAL DRY STACK STORAGE MARINA DEL REY, BASIN H California Coastal Commission Hearing (January 9, 2015) Item.
City of Newport Beach Request to Change the City’s Coastal Land Use Plan for the Back Bay Landing Site California Coastal Commission Hearing June 12, 2015.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
LCP Amendment No. MAJ-2-12, Item Th15b. Zoning Designations 2007 DTSP City Approved CTO 2007 DTSP Coastal Commission Approved in 2010.
COASTAL COMMISSION AUGUST 15, SIGNIFICANT IMPACTS OF THE PROPOSED RENOVATION OF MARINERS VILLAGE  ELIMINATES THE LAST GREAT BLUE HERON ROOKERY.
CCC Hearing January 7, 2015 Item W33a. Subject Site 2.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
nd District Agricultural Assoc., Del Mar Fairgrounds “Surf & Turf” Property CCC Hearing W15b June 15, 2011.
Hohnloser De novo review of proposed boundary line adjustment at and South Highway One, Gualala, Mendocino County (APN ) Item F12a.
(CITY OF LOS ANGELES) ITEM TH16A COASTAL COMMISSION SEPTEMBER 2014 HEARING.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Slip Vacancy Rates Continue to Soar Out of Control in Marina del Rey, CA. The Restriction of Coastal Access to Get More Profits.
The Protectors of our Public Lands in Los Angeles & the Community of Marina del Rey are systematically being silenced by LA County Officials PUBLIC TRUST.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Combined staff presentation for Items: 11a. - Periodic Review Response. 11b. - Local Coastal Program Amendment (MDR-01-11). 12a. - Waterside Coastal Development.
California Coastal Commission June 11, 2014 Huntington Beach 16e A-3-SLO Tracks Realty Trust 17a A-3-SLO Thomas Kellaway Los Osos Map.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Agnes Water Desalination Project Preliminary Studies – Aquatic Ecology John Thorogood and Kylie McPherson.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
2014 POLLUTION RECOVERY FUND GRANTS STATUS EPC Meeting October 16, 2014.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
Agenda Item F 16a Moriarty Dock Replacement 2782 Bayshore Drive, Newport Beach.
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
(City of Newport Beach) Item #F13a Coastal Commission April 11, 2014 Hearing.
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
TREE ORDINANCE WORKSHOP DISCUSSION September 3, 2014.
Downtown Marina Authorization for 30% Design Contract for Downtown Marina and Adjacent Areas & Functions Stockton City Council December 6, 2005 Agenda.
Downtown Stockton Marina & Joan Darrah Promenade July 29, 2008 Guaranteed Maximum Price for the Construction of the Downtown Marina and Joan Darrah Promenade.
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.
NF Marina Item 16b a Joint Presentation of We ARE Marina del Rey The Boating Coalition Boaters for Dana Point Harbor.
Project Status & Right-of-Way Acquisition
Parks and Recreation Commission
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Watercrest Memory Care Technical Site Plan – Tier 2 Application #3127
LAKE TAHOE BENCHMARKS CALIFORNIA STATE LANDS COMMISSION
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission Staff

1 Project Summary Replaces the existing deteriorated 230-slip (plus 11 end ties) Marina with a new, state-of-the-art modern Marina with 207 slips (plus 11 end ties) Complies with DBAW Layout and Design Guidelines and ADA access requirements Addresses concerns regarding small boat slip availability and enhances lower cost recreational boating opportunities Provides maximum access and recreational opportunities Improves water quality No environmentally sensitive habitat areas or any species of biological or economic significance These materials have been provided to the Coastal Commission Staff

2 Project Site These materials have been provided to the Coastal Commission Staff

3 Existing Deteriorated Condition These materials have been provided to the Coastal Commission Staff

4 Proposed Modern Marina Amenities These materials have been provided to the Coastal Commission Staff

5 Proposed Modern Marina Amenities These materials have been provided to the Coastal Commission Staff

6 Proposed Modern Marina Amenities One pumpout hydrant will accommodate 2 to 4 adjacent slips Mobile Cart Easily RelocatedPumpout Capability for In-Slip Service These materials have been provided to the Coastal Commission Staff

7 Market Demand Demonstrates a Decreasing Demand for Small Boat Slips These materials have been provided to the Coastal Commission Staff Market trends and recent studies for new and redeveloped marinas, including the Marina del Rey Slip Sizing Study, prepared by Noble Consultants, Inc., demonstrate: – An increase in demand for boat slips to accommodate larger vessels – A decrease in demand for smaller sized slips – An increase in the rate of dry-docking of smaller boats

8 Marina del Rey Boat Slip Vacancy Rates Are Historically Highest for Small Boat Slips These materials have been provided to the Coastal Commission Staff Based on vacancy rate data provided by the Los Angeles County Department of Beaches and Harbors for the years 2003 through 2008, the Marina del Rey Slip Sizing Study found the following average vacancy rates for four slip length categories: Slip Length CategoryVacancy Rates 18 – 25 feet4 – 8% 26 – 35 feet2 – 4% 36 – 50 feet0.5 – 2% Over 50 feet0.5 – 2%

9 The Proposed Slip Configuration Minimizes the Loss of Boat Slips for the Marina While Complying with DBAW Guidelines and ADA Access Requirements These materials have been provided to the Coastal Commission Staff

10 The ADA Requires a Minimum of Five ADA-Compliant Slips for the Marina These materials have been provided to the Coastal Commission Staff

11 The Project Addresses Concerns Regarding Small Boat Slip Availability and Enhances Lower Cost Recreational Boating Opportunities Bay Club Marina Proposed Change in Slip Numbers Slip Size≤ 25’≤ 30’32’ – 38’40+’ Current Layout Proposed Layout Change13(17)1(7) Bay Club Marina Proposed Change in Slip Ratios Slip Size≤ 25’≤ 30’32’ – 38’40+’ Current Layout0.0%33.9%44.8%21.3% Proposed Layout6.3%29.5%50.2%20.3% These materials have been provided to the Coastal Commission Staff Retains the approximate existing boat slip mix and size ratios Decreases the number of slips greater than 40 feet

12 The Project Addresses Concerns Regarding Small Boat Slip Availability and Enhances Lower Cost Recreational Boating Opportunities Bay Club Marina – Proposed Percentage of Small Boats: 70% ≤ 35 Feet These materials have been provided to the Coastal Commission Staff Increases the number of slips <30 feet from 14 to 21, including 13 new slips <25 feet that do not currently exist at the Marina Maintains the existing slip length, from feet to feet, which is significantly less than the not-to-exceed number of 44 feet recommended by the Marina del Rey Slip Sizing Study

13 Special Condition No. 1: Low Cost Boating Payment These materials have been provided to the Coastal Commission Staff NF Marina will fund a program to enhance lower cost boating opportunities in an amount equivalent to the financial value of one 30-foot boat slip for every 100 slips greater than 30 feet in length Special Condition No. 1 further enhances lower cost recreational boating opportunities

14 The Project Provides Public Access The Marina’s boat slips are available to the public on a for- lease basis A public waterfront pedestrian promenade is available for public use and enjoyment On-site parking for Marina lessees has been maintained and meets County and LCP marina parking requirements These materials have been provided to the Coastal Commission Staff

15 NF Marina Will Enhance the Public Waterfront Pedestrian Promenade Adjacent to the Marina for the Public Use and Enjoyment These materials have been provided to the Coastal Commission Staff

16 The Project Improves Water Quality A new sewage pumpout system that allows for in-slip sewage pumpout for all boats in the Marina Silt curtains during construction contain the spread of turbid water Incorporates BMPs and complies with County NPDES permit discharge requirements Implements a Water Quality Management Plan These materials have been provided to the Coastal Commission Staff

17 The Project Site Does Not Contain Environmentally Sensitive Habitat Areas or Any Species of Biological or Economic Significance No eelgrass, actively nesting birds, or other sensitive biological resources were encountered within or adjacent to the Project site as part of Biological Resource Surveys Pre-construction and post-project mitigation will confirm that the Project will not adversely affect eelgrass beds Pre-construction nesting bird surveys and mitigation measures will protect sensitive bird species No pile driving will occur during least tern nesting and foraging season Photograph of Dive Survey Operations These materials have been provided to the Coastal Commission Staff

18 Project Construction Will Have Minimal Impacts to Boaters Marina reconstruction is anticipated to occur in three phases over two years – Each phase will take approximately six months – Each phase will consist of removal and reconstruction of approximately one-third of the Marina to minimize boater displacement Boaters will have an opportunity to relocate to other available slips within the Marina These materials have been provided to the Coastal Commission Staff

19 The Applicants Support Staff’s Recommendation that the Commission Approve the CDP for the Project The Project addresses concerns regarding small boat slip availability by increasing the number of slips <30 feet from 14 to 21, including 13 new slips <25 feet that do not currently exist at the Marina The low cost boating payment further enhances lower cost recreational boating opportunities Improves water quality No environmentally sensitive habitat areas or any species of biological or economic significance These materials have been provided to the Coastal Commission Staff