Earth Station on Vessels An Update to the NSMA Spectrum Management 2006 Presented by Ken Ryan, Skjei Telecom May 17, 2006.

Slides:



Advertisements
Similar presentations
Simulation and Evaluation of Various Block Assignments Evaluation of multiple carriers deployed in a channel block evaluation criteria section.
Advertisements

Earth Stations on Mobile Platforms (ESOMPs)
11th February 2000 BFWAtg(00)12. Structure of the presentation u Study objective and approach u BFWA characteristics u Interference analysis (worst case)
Doc.: IEEE /1387r0 Submission Nov Yan Zhang, et. Al.Slide 1 HEW channel modeling for system level simulation Date: Authors:
Doc.: IEEE /0229r0 Submission February 2012 Assaf Kasher, IntelSlide 1 Transmit Mask Correction Date: Authors:
BR WORKSHOP ON THE EFFICIENT USE OF THE SPECTRUM/ORBIT RESOURCE ESOA Limassol, Cyprus, April
ECE 5233 Satellite Communications
Protecting RNSS Spectrum Domestic and International Activities Karl B. Nebbia Associate Administrator Office of Spectrum Management National Telecommunications.
WRC 2007 Results October 22 ~ November 16, 2007 Geneva, Switzerland Masatoshi OHISHI RAFCAP meeting 2008.
Doc.: IEEE /0630r0 Submission May 2015 Intel CorporationSlide 1 Verification of IEEE ad Channel Model for Enterprise Cubical Environment.
April 2009 doc.: IEEE /xxxxr0 May 2015
USE OF THE HF BROADCASTING BANDS A SHORT OVERVIEW EBU TECHNICAL DEPARTMENT HISTORY CONGESTION HFBC PLANNING PARAMETERS THE THREAT OF PLT DIGITAL FUTURE.
NSMA Conference Interference Temperature Round Table May 18, 2004 Les Wilding Cingular Wireless 5565 Glenridge Connector Atlanta, GA
Radio Interference Calculations
NSMA Working Group 3 Frequency Coordination and New Issues 2015 Conference Report Larrie Sutliff, Chair NSMA Spectrum Management.
Joint Industry Canada/RABC Stakeholder Discussion - Ottawa, ON
Satellite Microwave MMG Rashed Sr. Lecturer, Dept. of ETE Daffodil International University.
Proposed revision of ITU-R Recommendation providing EESS (active) Performance and Interference Criteria May 13, 2015 Committee On Radio Frequencies Thomas.
The $20 Billion Question: Can Satellite and Terrestrial Wireless Co-Exist in C-band? David Hartshorn Secretary General Global VSAT Forum.
0 Slide 0 Preventing Interference from Earth Station Vessels National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
Frequency Sharing Study between FWA & FSS in the band MHz David Bryant Wireless Networks Presentation to UK W-LAN Advisory Group (Sharing &
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Doc.: IEEE /0013r0 Submission April 2008 Joel Johnson, IEEE GRSSSlide 1 Coexistence Issues for Passive Earth Sensing from GHz Notice: This.
C OMSEARCH TM Regulatory Review presented at National Spectrum Managers Association Spectrum Management 2004 May 19, 2004 Rosslyn, VA presented by Ken.
1 Emerging issues Titus Spoelstra ESF Committee on Radio Astronomy Frequencies P.O.Box 2, 7990AA Dwingeloo, Netherlands
Wireless Roundup Spectrum Management 2007 NSMA Presented by David Meyer May 22, 2007.
Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007.
25 July 1998WTD 1 DTTB Transmitter Ratings Compiled by Wayne Dickson SMIREE MIEAust. CPEng. Member SMPTE This presentation seeks to explain the relationship.
Doc.: IEEE /0254r0 Submission May 2007 Sai Shankar N QualcommSlide 1 Aggregate Interference at DTV Receiver Date: Authors: Notice:
RALI FX3 Microwave Fixed Services Frequency Coordination Glenn Odlum Senior Engineer Spectrum Engineering Section
Doc.: IEEE d Submission November 2014 John Notor, Notor Research Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
Doc.: IEEE /1229r1 Submission November 2009 Alexander Maltsev, IntelSlide 1 Application of 60 GHz Channel Models for Comparison of TGad Proposals.
SPECTRUM MANAGEMENT 2004 National Spectrum Managers Association Satellite Spectrum Management Issues Carlos M. Nalda May 19, 2004.
Doc.: IEEE RR-02/036 Submission March 2002 Rebecca Chan, Industry CanadaSlide 1 Simulation on Aggregate Interference from Wireless Access Systems.
NSMA Working Group Conference Report Larrie Sutliff, Chair NSMA Spectrum Management /16/2012.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
A study on the coexistence between Direct Air to Ground Communication (DA2GC) and Radars in the 5 GHz band Peter Trommelen, Rob van Heijster, Arne Theil.
Spectrum Sharing in 3.5 GHz Band
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
Agenda Item: 1.8 Title: to review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with.
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
1 70/80/90 GHz Web-Based Coordination Improving the Effectiveness of the Domestic Spectrum Management Process National Spectrum Managers Association Arlington,
NPSTC is a federation of organizations whose mission is to improve public safety communications and interoperability through collaborative leadership.
,4-3,8 GHz ECC Decision (11)06 + Guidelines to support the implementation of this framework at national level (mobile/FSS and mobile/FS coexistence)
Aero3G PROPOSED GENERIC MASKS FOR DA2GC Objective:
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
Mobile VSATs An Overview of Ku-Band Mobile Satellite Services
Earth Stations on Vessels Technical and Regulatory Developments
Resolution 606 Interference from RNSS to radars in the 1215 – 1300 MHz band Philippe GERARD Agence Nationale des Fréquences Mars 2001 AMCP.
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
5G Micro Cell Deployment in Coexistence with Fixed Service
January 2014 doc.: IEEE /0084r0 January 2016
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed European Regulations] Date Submitted:
doc.: IEEE <doc#>
Submission Title: Link Budget for m
Submission Title: Status Report of European UWB Regulatory Activities
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
FCC Spectrum Sharing in the 3.5GHz Band Comments Approval
Submission Title: European UWB Regulations Date Submitted: 14 May 2003
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
World Radiocommunications Conference
White Space Regulatory Issues
January 2014 doc.: IEEE /0084r0 January 2016
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
MHz FCC Action Date: Authors: May 2006 May 2006
Channelization for 6 GHz (CID 21378)
GSC position on key WRC-19 AI 1.5 ESIMs
Presentation transcript:

Earth Station on Vessels An Update to the NSMA Spectrum Management 2006 Presented by Ken Ryan, Skjei Telecom May 17, 2006

Earth Station on Vessel 2006 Regulatory Update What’s Happening in Europe Status of U.S. ESV Coordinations Interference Analysis Methodologies Interference Criteria Frequency Coordination Licensing Proposal for Future ESV Work

Earth Station on Vessel 2006 Regulatory Update FCC Docket # (FCC DA ) Released January 6, 2005 C and Ku-band ESV Co-primary 15 year license term New Rule Parts – : C-band – : Ku-Band No ESV licenses granted to date

What’s Happening in Europe? European Conference of Postal and Telecommunications Administrations (CEPT) paper: “Compatibility of Earth Stations on Board Vessels Transmitting Within the Gaps in the CEPT Fixed Service Channel Plan for the Lower 6 GHz Band ( MHz)” Interference Criteria Proposed: –Long Term (single entry) : between -10 & -19 dB (-169 dBW/4kHz, -178 dBW/4kHz) Minimum safe distances from shore, dependent upon operating conditions. The ESV antenna main beam axis elevation is not lower than 20°. The ESV transmits a single carrier per HPA. The phase noise floor of the ESV carrier does not exceed -120 dBc/Hz. The p.s.d. of the 1st spectrum side lobe of the ESV carrier is at least 27 dB below the in-band p.s.d. The ESV e.i.r.p. does not exceed 58 dBW. The ESV does not transmit when the vessel speed is lower than 10 knots (18,3 km/h). Limit ESVs to use of Band Gaps as shown in the figure on next slide:

C-band CEPT 30 MHz FS Channel Plan* Blue shaded areas indicate approximately 25 MHz spectrum is unoccupied, so-called 4% solution. * Channel plan identical to FCC Part i(8) for Lower 6 GHz.

What’s Happening in the U.S.? Not Much Lately… The NSMA Examined Analysis and Coordination issues last in 1999 Some ESVs are being coordinated at C-band U.S. Coordinators are using the NSMA developed Critical Contour Point analysis method Current FSS earth station long-term interference objectives are being used: -154 dBW/4 kHz Use of band gaps being explored, although no proposals to limit ESVs to these bands is proposed Use of real FS receiver filter curves No consideration for the motion of the ESV

A Brief Summary of the Current ESV Coordination Process Steps Required to Coordinate: Properly characterize the ESV –Route breakpoints –Speed* –Number of approaches* Analyze operation versus FS systems Frequency Coordination Licensing * Only required for in-motion analysis

Characterizing the ESV Identifying the breakpoints is dependent upon the type of ESV service being provided Need to identify deep-draft sea lanes Need to go far enough out to satisfy the FCC rules (300 km) The route of the ESV must characterize its worst case excursions

Interference Criteria ESVs currently use existing long and short term interference criteria used by all U.S. coordinated 6 GHz earth stations: –-154 dBW/4kHz long term, -131 dBW/4kHz short term ITU and TIA documents suggest proper FSS into FS digital interference criteria is: – -146 dBW/MHz long term, -103 dBW/MHz short term Other options include: –Fractional Degradation in Performance (FDP) criteria, 25% –Performance Degradation Limit (PDL) see TIA TSB-86, five 9’s or 25% performance degradation –Interpolated interference criteria using existing long and short term criteria calculated

Interference Analysis Currently we are using the Critical Contour Point (CCP) methodology Current version of the CCP uses a “static” analysis, no benefit for ESV motion is considered Other analysis approaches are discussed in ITU-R SF and 1649 Other methods which model the ESV motion and collect interference statistics could be examined, for digital FS systems the following three methods could be used: –Long-term objective of –146 dBW/MHz that can be exceeded only 20% of the time and a short-term objective of –103 dBW/MHz that can be exceeded only 0.002% of the time. –Fractional Degradation in Performance –Performance Degradation Limit The above approaches involve developing interference criteria on a link- by-link basis

Critical Contour Point

Collect Interference Statistics

Digital FS Interference Criteria Interference Objective = Imax - 

Fractional Degradation in Performance Where: I i : Linear value of ith interference level. f i : Fraction of time interference from ESV is between the ith interference level and the (i + 1)the interference level N T :Linear value of thermal noise level. In order to account for the 1-dB noise degradation objective as suggested by TIA TSB 10-F, the interference objective is: Imax – FDP – 5.86 (dB).

Fractional Degradation in Performance

Performance Degradation Limit

Frequency Coordination Process is offshoot of the process developed by the NSMA 6 years ago and is very similar to current coordination model –Provide route and ESV parameters –Currently use the Critical Contour Point analysis method –PCN data is used by other licensees to analyze interference –Incumbent licensees generate cases and response –Coordinator resolves cases in response letter

Licensing ESV licensee files an initial filing outlining hub and remote parameters License is a network license essentially providing a blanket authorization for the remote ESVs Licensee is required to submit a prior coordination showing for each ESV coordinated ESV is considered licensed once the coordination final report is submitted to the FCC

Proposals for Future Work Finalize PCN data format and content recommendation Review international ESV work done, both ITU and CEPT Examine use of band edge segments for ESV use Interference analysis methods and criteria for in-motion ESVs Establishment of an NSMA working group to come to a consensus on these issues, so that ESVs can more easily and realistically be analyzed and coordinated