Acceptance Sampling Systems For Continuous Production and Variables

Slides:



Advertisements
Similar presentations
Operations Management Statistical Process Control Supplement 6
Advertisements

Chapter 9A Process Capability and Statistical Quality Control
Quality Assurance (Quality Control)
Ch © 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Example R-Chart.
Quality Management 09. lecture Statistical process control.
Quality Control Chapter 8- Control Charts for Attributes
Chapter 9- Control Charts for Attributes
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
13–1. 13–2 Chapter Thirteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Acceptance Sampling for Attributes Statistical Quality Control
Quality Control Chapter 9- Lot-by-Lot Acceptance Sampling
Section 7 Acceptance Sampling
Acceptance Sampling Plans by Variables
G – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Acceptance Sampling Plans G For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
BPT2423 – STATISTICAL PROCESS CONTROL
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 10 th Edition.
Control Charts for Variables
Lot-by-Lot Acceptance Sampling for Attributes
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
Control Charts for Attributes
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 16 Improving.
Control Charts for Moving Averages
An AQL System For Lot-By-Lot Acceptance Sampling By Attributes
Introduction to Statistical Quality Control, 4th Edition Chapter 15 Other Acceptance Sampling Techniques.
IES 331 Quality Control Chapter 15 Acceptance Sampling by Variables
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Statistical Quality Control/Statistical Process Control
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
Process Capability Process capability For Variables
Steps in Using the and R Chart
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Control Charts for Attributes
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Audit Sampling: An Overview and Application to Tests of Controls
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
Histograms. Grouped frequency distribution Shows how many values of each variable lie in a class. Some information is lost. When presenting this information.
Statistical Quality Control/Statistical Process Control
Chapter 15Introduction to Statistical Quality Control, 6 th Edition by Douglas C. Montgomery. Copyright (c) 2009 John Wiley & Sons, Inc. 1 Chapter 15-
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Besterfield: Quality Control, 8 th ed..© 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Quality Control Chapter 10- Acceptance.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
1 CHAPTER (7) Attributes Control Charts. 2 Introduction Data that can be classified into one of several categories or classifications is known as attribute.
STATISTICAL QUALITY CONTROL (S.Q.C.) PRESENTED BY-: NIKHIL GARG ROLL NO
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 7: The Distribution of Sample Means
Process Capability and Statistical Quality Control.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Lot-by-Lot Acceptance Sampling for Attributes
Double and Multiple Sampling Plan
POPULATION VERSUS SAMPLE
COMPLETE BUSINESS STATISTICS
Two-Sample Hypothesis Testing
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Other Acceptance Sampling Techniques
Statistical Process Control (SPC)
Process Capability Process capability For Variables
Double and Multiple Sampling Plan
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Steps in Using the and R Chart
Statistical Quality Control
Presentation transcript:

Acceptance Sampling Systems For Continuous Production and Variables Outline Acceptance Sampling For Continuous Production Acceptance Sampling For Variables

Acceptance Sampling For Continuous Production When production is continuous, many manufacturing operations do not create lots. If conveyor lines are used, it may be impracticable to form inspection lots. In such cases, acceptance sampling plans for continuous production are required. Plans for continuous production consists of alternating sequences of sampling inspection and screening (100%) inspection. These plans usually begin with 100% inspection, and if a stated number of units (clearance number, ) is free of defects, sampling inspection is started. Only a fraction, of the units are inspected while sampling continues. Sampling continues until a specific number of defectives are found, at which time 100% inspection is restarted.

Acceptance Sampling For Continuous Production - CSP - 1 The concept of sampling for continuous production was first devised by H.F. Dodge in 1943. His sampling plan, CSP-1 is as follows: 1. Begin with 100% inspection until units in succession are found clear of defects 2. Stop 100% inspection and inspect only a fraction of the units 3. If a defective item is found, stop sampling inspection and revert to 100% inspection. Replace defective items with the good ones and repeat the process starting Step 1.

Acceptance Sampling For Continuous Production - CSP - 1 CSP-1 plans are indexed by AOQL. For a particular AOQL, there are different combinations of and , which may be obtained from Figure 14-1. Example: If AOQL=1% and find From Figure 14-1, AOQL=1% and meets at This plan specifies that sampling inspection of 1 out of every 4 units will start after 60 consecutive items are free of defectives

Acceptance Sampling For Continuous Production - CSP - 2 CSP-2 differs from CSP-1 in that, once sampling inspection is started, 100% inspection is not invoked when each defect is found but is invoked only if a second defect occurs in the next or less sample units. Usually, See Table 14.1 and Figure 14.2.

Acceptance Sampling For Continuous Production - CSP - 3 CSP-3 is a refinement of CSP-2 to provide greater protection against a sudden run of bad quality. When one sample defective is found, the next four units from the production line are inspected. If none of the four units are defective, the sampling procedure is continued as in CSP-2. If one of the four units is defective, 100% inspection is resumed at o once and continued under the rules of CSP-2. For a given value of and AOQL, the value of (as well as ) is the same in CSP-2 as it is in CSP-3. See Table 14.1 and Figure 14.2.

Acceptance Sampling For Continuous Production - Multilevel Continuous Sampling Sometimes it is desired to start with a large fraction sampled. Economies can be obtained by permitting a subsequent change to a smaller sampling fraction whenever the observed quality is good. Multilevel sampling can provide such economies. The plan starts with 100% inspection that continues until acceptable units have been found in succession. Then, sampling inspection is initiated with a fraction inspected. If acceptable units have been found in succession, subsequent inspection is at . After another acceptable units sampling inspection is carried out at , and so on. When a unit is rejected, inspection is shifted back to the next lower level.

Acceptance Sampling For Continuous Production - Multilevel Continuous Sampling The above description of multilevel continuous sampling does not include idea of inspecting four successive units after a defective is found. See Table 14.2 and Figure 14.3 for a continuous sampling plan that includes an inspection of four successive units after a defective is found.

Acceptance Sampling For Variables Advantages: Better quality protection and smaller sample size: for a given quality protection against various possible percentages of defectives, the sample size is considerably less than that of attribute sampling Gives more information for decision making Provides a better basis for improving quality Provides a better basis for giving weight to quality history in acceptance decisions

Acceptance Sampling For Variables Disadvantages Cannot be used if quality characteristics are observable only as attributes e.g., color Only one characteristic can be evaluated A separate plan is required for each quality characteristic Involves greater administrative, clerical, equipment, and inspection costs The distribution of population has to be known or estimated

Acceptance Sampling For Variables There are four types of acceptance sampling plans for variables. These plans summarize sample information differently: Frequency distribution of the sample measurements Shainin lot plot method Control chart plot of sample means and ranges Sample average Sample average and sample dispersion

Acceptance Sampling For Variables Shainin Lot Plot Method 1. A random sample of 10 subgroups of 5 each for a total of 50 items is obtained from the lot 2. The average and range are calculated for each subgroup 3. A histogram is constructed. The Shainin plan states that the number of histogram cells should be between 7 and 16. For example, there are 11 cell in Text Figure 15.1, p. 563.

Acceptance Sampling For Variables Shainin Lot Plot Method 4. The average of the averages, and the average of the ranges, are Where is the number of subgroups 5. Using these values, the upper lot limit (ULL) and lower lot limit (LLL) are calculated as follows:

Acceptance Sampling For Variables Shainin Lot Plot Method Lot Plot Evaluation: Once the lot plot and the lot limits are obtained, the decision concerning acceptance or non-acceptance is made. The decision is based on a comparison of the lot plot with 11 different types of lots, which are shown in Text Figure 15.2 p. 565 1. Lot plot is within specification limits, accept. 2. Lot limits are within specification limits, accept. 3,4. A review board makes an acceptance/rejection decision.

Acceptance Sampling For Variables Shainin Lot Plot Method The other types of lot plots are used for non-normal distributions and special rules are required for estimating lot limits. 5,8. Skewed 6,9. The lot plot indicates that the lot was screened or sorted. 7,10. Bimodal 11. The lot plot indicates stray values

Reading and Exercises Chapter 14 Reading: pp. 542-550 Problems: 14.1, 14.2, 14.4, 14.9 Chapter 15 Reading: pp. 559-566 Problems: 15.3 (ignore the solution given in the solution manual, use the method in pp. 404-405 of the handout)