FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.

Slides:



Advertisements
Similar presentations
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Advertisements

THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
MPSRSYS- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW SYSTEMS OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
ITAR Restricted Data THEMIS Probe and PCA Overview Mission CDR 6/14 – 6/18/04 Integration and Test Marc Kaylor
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
THEMIS INSTRUMENT SUITE
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
THEMIS MISSION PRE-SHIP REVIEW
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS FM4/FM5 INSTRUMENT SUITE
THEMIS MISSION PRE-SHIP REVIEW
Integration and Test Organization Chart
SDO Integration and Test (I&T) Subsystem Mission PDR
Presentation transcript:

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy McCauley University of California - Berkeley

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 2 UCB September 21, 2005 F1 Probe I&T Flow

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 3 UCB September 21, 2005 F1 Probe I&T Flow

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 4 UCB September 21, 2005 F1 Probe I&T Flow

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 5 UCB September 21, 2005 F1 Probe I&T Facility

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 6 UCB September 21, 2005 F1 Probe I&T Facility

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 7 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-010THEMIS Probe Power On ProcedureModifySAI-1526 thm-mint-proc-011THEMIS Probe Power Off ProcedureModifySAI-1526 thm-mint-proc-012THEMIS Bus CPT ProcedureModifySAI-XXX thm-mint-proc-013THEMIS Bus LPT ProcedureModifySAI-1527 thm-mint-proc-014THEMIS Bus AT ProcedureModifySAI-XXX thm-mint-proc-015THEMIS Probe Loading and Unloading ProcedureModifySAI-1377 thm-mint-proc-016THEMIS Probe EMC/EMI SignaturesDraftIn Progress thm-mint-proc-017THEMIS Probe Self CompatibilityModifySYS-009 thm-mint-proc-020THEMIS Instrument Harness InstallationDraftIn Progress thm-mint-proc-021THEMIS IDPU/ESA Mechanical Integration ProcedureInitial RevReleased thm-mint-proc-022THEMIS SST Mechanical Integration ProcedureDraftReleased thm-mint-proc-023THEMIS SPB Instrument Mechanical Integration Procedure Initial RevReleased thm-mint-proc-024THEMIS FGM Sensor Mechanical Integration Procedure DraftReleased thm-mint-proc-025THEMIS SCM Sensor Mechanical Integration Procedure DraftReleased F1 Probe I&T Documentation

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 8 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-026THEMIS Mag Boom Mechanical Integration and Alignment # Assigned thm-mint-proc-027THEMIS Mag Boom Mechanical Clearance Verification# Assigned thm-mint-proc-028THEMIS IDPU Electrical Integration ProcedureModifySAI-1563 thm-mint-proc-029THEMIS Particles Electrical Integration TestInitial RevReleased thm-mint-proc-030THEMIS Fields Electrical Integration TestInitial RevReleased thm-mint-proc-031THEMIS Deployment Verification TestDraftReleased thm-mint-proc-032THEMIS Instrument CPT ProcedureModifySYS-005 thm-mint-proc-033THEMIS Instrument LPT ProcedureModifySYS-006 thm-mint-proc-034THEMIS Instrument AT ProcedureModifySYS-007 thm-mint-proc-035THEMIS Closed Loop ACS Test Procedure# Assigned thm-mint-proc-036THEMIS SST Connector Plate Alignment ProcedureDraftReleased thm-mint-proc-038THEMIS Mag Boom Restow Procedure# Assigned thm-mint-proc-039THEMIS Instrument Closeout Procedure# Assigned thm-mint-proc-120THEMIS Facility and MGSE Magnetic Test ProceduresDraftReleased thm-mint-proc-121THEMIS Component Magnetic Test ProcedureDraftIn Progress F1 Probe I&T Documentation

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 9 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-122THEMIS ESA/SST Purge Hookup ProcedureInitial RevReleased thm-mint-proc-040THEMIS Probe ESC Test Procedures# Assigned thm-mint-proc-041THEMIS Probe EMC Test Procedure# Assigned thm-mint-proc-042THEMIS Probe Magnetics Test Procedure# Assigned thm-mint-proc-043THEMIS Probe Vibration Test ProcedureDraftReleased thm-mint-proc-044THEMIS Probe Pair Vibration Test Procedure# Assigned thm-mint-proc-045THEMIS Probe Vibration Test Electrical Configuration# Assigned thm-mint-proc-046THEMIS Probe TV Test Procedure# Assigned thm-mint-proc-047THEMIS Probe Pair TV Test Procedure# Assigned thm-mint-proc-048THEMIS Probe TV Functional# Assigned thm-mint-proc-049THEMIS Probe Spin Balance Procedure# Assigned thm-mint-proc-050THEMIS Probe CTV RF Compatibility Test Procedure# Assigned thm-mint-proc-051THEMIS Probe Fueling/Defueling Procedure# Assigned thm-mint-proc-052THEMIS Probe Pre-TV Closeout Procedure# Assigned thm-mint-proc-053THEMIS Probe Pre-Launch Closeout Procedure# Assigned thm-mint-proc-054THEMIS Probe Battery Ops Procedure# Assigned F1 Probe I&T Documentation

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 10 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-055THEMIS Probe RCS Pressure Test and Leak Check# Assigned thm-mint-proc-056THEMIS Probe Rollover Procedure# Assigned thm-mint-proc-058THEMIS Probe Lift in Rollover Fixture Procedure# Assigned thm-mint-proc-059THEMIS Probe Thermal Vac Chamber Loading Procedure # Assigned thm-mint-proc-140THEMIS Probe Thermal Closeout Procedure# Assigned thm-mint-proc-060THEMIS PCA Vibration Test Procedure# Assigned thm-mint-proc-061THEMIS PCA Acoustics Test Procedure# Assigned thm-mint-proc-062THEMIS PCA LV Mate Procedure# Assigned thm-mint-proc-063THEMIS PCA LV Electrical Test Procedure# Assigned thm-mint-proc-064THEMIS PCA Pre Encapsulation Closeout Proc# Assigned thm-mint-proc-065THEMIS PCA Launch Tower Electrical Test Procedure# Assigned thm-mint-proc-066THEMIS PCA Pre Launch Closeout Proc# Assigned thm-mint-proc-067THEMIS PCA Spin Balance Procedure# Assigned thm-mint-proc-080THEMIS Probe End-to-End with MOC/SOCDraftIn Progress thm-mint-proc-081THEMIS Launch & Early Orbit Simulations# Assigned F1 Probe I&T Documentation

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 11 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-082THEMIS Contingency Procedures# Assigned thm-mint-proc-083THEMIS UCB Ground Station RF System Sensitivity Test DraftIn Progress Mission Integration and Test Procedures - Swales Documents SAI-PROC Probe Assembly Procedure SAI-PROC Side Solar Array Installation Procedure SAI-PROC BAU and Transponder Mechanical Installation SAI-PROC Sun Sensor Mechanical Installation SAI-PROC Battery Mechanical Installation Procedure SAI-PROC BAU Electrical Integration Procedure SAI-PROC IRU Electrical Integration Procedure SAI-PROC MSSS Electrical Integration Procedure SAI-PROC AEB Electrical Integration Procedure SAI-PROC S/A Electrical Integration Procedure SAI-PROC Battery Electrical Integration Procedure SAI-PROC RCS Electrical Integration Procedure F1 Probe I&T Documentation

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 12 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures - Swales Documents SAI-PROC Transponder/Antenna Electrical Integration Procedure SAI-PROC Electrical Test Set (ETS) Inspectrion and Functional Test SAI-PROC Probe Ground Lifting and Handling Procedure SAI-PROC PCA Assembly Procedure SAI-PROC Sep System Installation Procedure SAI-PROC Probe Carrier Electrical Integration Procedure SAI-PROC PCA Lifting and Handling Procedure SAI-PROC-XXXProbe Container Lifting Procedure SAI-PROC-XXXDelivery Inspection of SA Panels SAI-PROC-XXXP1 ETU BAU Removal and Flight BAU Installation SAI-PROC-XXXS/A Mechanical Integration Procedure F1 Probe I&T Documentation