IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
IBL Project Status G. Darbo – INFN / Genova AW, 9 October 2009 o Insertable B-layer Project Status ATLAS Week Barcelona, October, G. Darbo - INFN.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Technical Support Activities in PH-ADO-PO
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
AFP – Technical Status 1.Cost estimates 2.Manpower estimates 3.First Actions AFP Kick-Off 03FEB Michael Rijssenbeek.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
TC activities.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
Communications Share Point Collaborative WS:
Update on ATLAS insertable B-layer
SVT – SuperB Workshop – Frascati Sept. 2010
Presentation transcript:

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office CERN, July 21 th 2009 G. Darbo - INFN / Genova Indico AGENDA page:

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July IBL kick-off – July 8 th IBL kick-off meeting Venue: July 8 th, at Holliday Inn (Thoiry). 55 Registrants, 31 Institutes represented, 35÷40 Institutes shown interest

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July IBL kick-off Agenda

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July Cost What in prototype costs: Sensors: Planar, 3D, Diamond (1) Electronics: FE-I4 Hybridisation: bump-bonding Local supports: stave Beam-pipe: mock-up External cooling: Thermal management What not: All other electronics / mechanical prototypes Irradiation and test beam (1) Diamond prototype added to cost - if diamond are the IBL sensors, the IBL cost will increase by > 1MCH.

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July Some Comments on Cost The IBL project is not uniformly developed on all its part Revisit cost when TDR will be mature Contingency not included – how to deal extra cost? Include contingency? Extra cost of deliverable has to be covered by the share assigned to the Institute? Funding scenario: 4.0 MCHF (M&O-A) + {4.4 MCHF (M&O-B) MCHF (fresh project money from new institutes)} – What next: 1.within this funding model, "old" M&O-B FA’s need to confirm their share of 4.4M (anything removed goes into +1.2M for general "bidding”); 2.establish the "money matrix” – tentative ; 3.collect firm pledges; 4.draft (i)MoU – it appears clear that we need to match financial with “visibility” of the contribution.

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July Interest in the Project 35÷40 Institutes (some present themselves in partnership with two or more Institutes). They are represented by a total of 16 Funding Agencies Strong interest in sensors across the 3 technology options (planar/3D/diamond) – 22 institutes interested in a sensor technology – for some of them the contribution to the project is conditional to the sensor option. First round of “serious” expression of interest: 120 ÷ 150 FTE (Engineers, Physicist, PhD) 8÷9 MCHF could be available to cover the 6.6 MCHF – some dependency of funding on chosen technology options (sensor/cooling/stave) and on distribution of deliverables amongst Institutes (Institutes will contribute to the project with money if their role/visibility is corresponding).

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July What (over)-Subscribed & What not WBS 1 - Sensors: 3 sensor technologies in the prototype phase: many groups (22) interested in sensors. Sensor production/test sites: we need two or max three sites for testing sensors after production – no more than one per Country. The past Pixel sensor tests were made in Germany/Italy/US for a much larger number of sensors. Sensor production cost divided amongst many FA’s – no “majority share” If diamond will be the chosen sensor technology – revisit project cost. WBS 2 – Electronics: The package is quite well covered Over subscription on ROD – need coordinated discussion between opto- board/BOC/ROD WBS 3 – Hybridisation Bump-bonding prototype is oversubscribed – we need more than one bump technology for prototyping and only one for production (cost and quantity are not an issue) Over subscription (not strong) on flex hybrid technology interconnect technology.

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July WBS 4 – Local Supports Bare stave is well covered – groups quite active Module loading on stave looks over-subscribed – need more discussions and better understanding. Cooling pipe fittings could have impact on the overall module loading plans WBS 5 – Internal Services Covered – no special issues WBS 6 – Beam-pipe & interfaces (global supports) This is centrally designed by PO – there are Institutes with mechanical engineering manpower that could take sub part as deliverables – not commitments taken (too early in the definition). WBS 7 – Surface Integration Little covered at moment – expression of interest available – need coordination

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July WBS 8 – External services Part of WBS on M&O-A not covered: Type 2, 3 and 4 cables and pipes WBS 9 – External Cooling & Gas In discussion the new organization of the cooling CO2 or C3F8 (mixture of C2F6 + C3F8) to be selected WBS 10 – Installation in the Pit Completely on M&O-A WBS 11 – DAQ, DCS & Interlock integration DCS hardware – Mainly Wuppertal HV/LV PS (M&O-A) – interested groups WBS 12 - Irradiation and Test Beam Many group interested. An upgrade/refurbishment of the strip telescope would be welcome – who interested?

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July Schedule – Fixed Date or sLHC I? Need to know: Design for sLHC phase I no matter what (follow machine schedule)? Design for a fixed installation date – install when ready (before Phase I) When to make it ready? The Upgrade Project Office (May 12 th ) suggests to use 2014/2015 as a guideline for the IBL installation date. We are now working with a schedule that foresees an installation date in 2014/2015 The FE-I4 and Sensor/Module are on the critical path, and installing earlier than 2014/2015 would require some compromises in the performance.

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July FE-I4 Review FE-I4 has gone through a “system & design issue” review on March, 2 nd 2009: A readiness review before chip closure is foreseen for late September/October: Kevin will chair the review committee Review organised by Philippe and Maurice Engineering run will be done in the IBM/CERN frame contract Cost will be in the IBL project - ~ 500kCH Do we need MoU for such a large commitment? It seems that money could be available by Institutes involved in the project, but will then need to be recognised as IBL contribution! Need to balance between risk of 2009 submission and that of adding a delay that will propagate to the whole IBL project…

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July TDR Kevin and Mar together with PL and TC proposed chapter editors: Waiting for response… Editors kick-off meeting July 22 nd Tight schedule if we want to have TDR published 1/4/2009 TDR as important document to FA’s release of money TDR Chapter Structure 1. Introduction 2. Overview 3. Modules 4. Staves 5. Integration 6. Installation 7. Off-detector 8. Prototyping, Testin g 9. Critical Integration 10. Commissioning 11. Management

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July TDR - Schedule ActionDeadline # Weeks from previous TDR Printout, submission to LHCCApril 1 st Final Draft Deadline for commentsMarch 15 th Sent to Collaboration for ApprovalMarch 1 st Draft 2 Deadline for commentsFeb 15 th Sent to CollaborationJan 25 th Draft 1 Deadline for commentsJan 11 th Sent to CollaborationDec 15 th Approval by TDR Editors and PO/USGDec 1 st Preparation TDR IntegrationNov 16 th Editors meeting 4 - final internal draftOctober 19 th Editors meeting 3September 28 th Editors meeting 2September 7 th Editors meeting - final chapter’s structureAugust 19 th Editors Kick off meetingJuly 22 nd 2009

IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July Conclusion IBL kick-off meeting was quite successful Large interest in the project – many Institutes, many FTE’s Enough money looks available for the project Some over subscription and some little covered Financial side Funding model proposed Money matrix in development iMoU and firm pledges on the way TDR Proposed chapter editor names, waiting for some replies TDR editors kick-off meeting tomorrow FE-I4 Readiness review – funding - submission