Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC18:TG8 API Specification Q1 Guidance Document.
San Francisco, CA. SC8 Liaison Report
PeriodTimeMinutes 3 rd Period8:00 – 8: rd Period8:45 – 10:1590 Break10:15 – 10: th Period10:30 – 11: th Period11:10 – 12:4090 PeriodTimeMinutes.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
2017 Exploration & Production Winter Standards Meeting
API 16C Choke and Kill Equipment
API SC6 Valves and Wellhead Equipment
Potential Milestones A timeline to finish in one year
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
Standards Break Out Session
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
HMC-4 Meeting 15th May 2018 London
2016 Exploration & Production Summer Standards Conference
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Review plan of the nature reporting – update 6
Float Equipment API Spec 10F
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Calendar Overview – Phase II – REVISED April 2019
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
TGaj editor report for Sponsor Ballot
Presentation transcript:

Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well Cementing” 24 th Edition, December 2010, is up for reaffirmation in December Auditor findings and comments are being logged, reviewed and discussed. “Special Work Session” on Thursday, June 19 th, 2014 Future revision may include changes to Consistometer oil specification and section on “Well Cementing Composites.”  Publication of API RP 10B-2 “Testing Well Cements” Publication of RP 10B-2, 2 nd Edition April Logged comments under review with discussion and possible resolution after “Special Work Session” on Thursday, June 19 rd, 2014 Future revisions may include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2  ……….

 Rewrite of API RP 10B-3 “Testing of Deepwater Well Cement Formulations” 1 st Edition July 2004 Rewrite of RP 10B-3, 2 nd Edition Draft ballot close June 4 th, Draft comments returned for resolution June 6 th,  Rewrite of API RP 10B-4 “Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure”, 1 st Edition July 2004 Rewrite of 10B- 2 nd Edition Draft ballot close June 4 th, Draft comments returned for resolution June 6 th, Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG Subcommittee on Oil Well Cements (SC10) Wednesday June 18, 2014: General Meeting

 Rewrite of API Spec 10D, 6 th Edition March 2002 “Bow Spring Casing Centralizers” Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set.  Rewrite of API RP 10F, 3 rd Edition April 2002 “Performance Testing of Cementing Float Equipment” TG will publish API Specification 10F, 1st Edition which will replace and make obsolete API RP 10F, 3th Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment

 TR on “Mechanical Cementing Plugs used in Tubing, Casing and Drill Pipe” Final formatting by API is in final stage. Publication available August 2014  TR on “Mechanical Behavior of Cement” Draft edits complete July Subcommittee on Oil Well Cements (SC10) Wednesday June 18, 2014: General Meeting