Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

Properties of cast resin transformers
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Stave Assembly (A random walk through stave construction)
PEEK Tube/Core Studies J. Fast, D. Olis, G. Lanfranco, H. Jostlein, B. Nitti, R. Duncan K. Schultz, T. Nebel, R. Davis.
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Lecture No 111 Fundamentals of Metal removal processes Dr. Ramon E. Goforth Adjunct Professor of Mechanical Engineering Southern Methodist University.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
1 Module and stave interconnect Rev. sept. 29/08.
Progress on staves – mechanical & thermal. Core and materials.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
WP4 – Plans for next 6 months
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Berlin talk outline Draft 2 – 7 th March Introduction UK has recently started to systematically try and understand structural requirements and how.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
While I’m away…. 2 I hope not this… 3 And not too much of this…
Stave production.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
New R&D Directions Carl Haber ATLAS Tracker Upgrade Mechanical Meeting 11-Sept-2013.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
EC: 7 DISK concept Preliminary considerations
Locking mechanics.
Are there better ways to build a stave?
ob-fpc: Flexible printed circuits for the alice tracker
Mechanics: (Tim).
WP4 – Plans for next 6 months
Graham Beck, QMUL, WP4 RAL 2 May 2013
ATLAS ITK WP3 WP3 Bi-weekly meeting
Materials R. Bates et al..
Presentation transcript:

Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1

Why & What ? Why? – It’s a WP4 deliverable M4.1 (2013/Q3) Draft stave thermo-mechanical and electrical performance requirements documented – It might be useful! What? – What do we mean by ‘stave’ Stave core / Stave core + EOS / Stave core + EOS + modules ? – What do we mean by ‘performance requirements’? Geometrical Thermo-mechanical Electrical – Don’t worry – It’s only a DRAFT! 10/07/2013Liverpool WP4 Meeting (11/7/13)2

Format? (Stolen from Ian) Scope – Brief description ? Assumptions – Co-cured face sheets, titanium tube, Allcomp foam, honeycomb core, Hysol 9396 Essential Requirements – Keeps modules cool, allows insertion and puts modules roughly in the right place and keeps them there – Capable of supplying correct voltages & signals to/from modules as viewed through EOS connector(s) Desirable Requirements – Staves should have similar properties & performance characteristics (module noise, cooling performance, stiffness, geometry) – Stave properties should not make module mounting and insertion harder than it needs to be. Target Parameters – Mass < g – %X0 < % – Noise < e – Cost < £ 10/07/2013Liverpool WP4 Meeting (11/7/13)3

Examples …. Mechanical – Geometric tolerances ParameterToleranceImpact of Violation Stave Length+0.1mmRisk of clash with interlink? Stave Width+0.5mmCompatibility with insertion tooling? Stave Thickness+0.1mmRisk of envelope clash? Bracket Z positions+/-0.5mmRisk of poor engagement into on-cylinder part? Stave bow+/-0.1mmInability to insert & extra stress on cylinder Stave roughness0.05mmGlue layer thicker than optimal & risk of glue seepage 10/07/2013Liverpool WP4 Meeting (11/7/13)4

Examples #2 Thermal ParameterValueQualification Temperature range+40 to -50CThermal integrity retained within operating range Operational temperature -35 +/- 5CRequired thermal performance attained within operational temperature range Input PowerxxWElectrical power of modules, EOS, Power, etc.. Exhaust temp. sens. Accuracy +/- 0.5CError might lead to miss-firing of interlock Exhaust temp. sens. Response time < 1sExcessive time lag may lead to too high module temperatures if cooling fails. Peak stave surface temperature with simulated power load < 5CViolation may lead to too high module temperatures and (possible) thermal runaway 10/07/2013Liverpool WP4 Meeting (11/7/13)5

Examples #3 Electrical ParameterValueQualification All traces break-freeYes/NoBreaks (may) lead to inability to run modules. Pull strength for sample bonds > ?gPoor pull strength may reveal contamination issues. EOS?Collection of tests to verify communications, interlock temps, LV, HV power OK Exhaust temp. sens. Accuracy +/- 0.5CError might lead to miss-firing of interlock Exhaust temp. sens. Response time < 1sExcessive time lag may lead to too high module temperatures if cooling fails. Peak stave surface temperature with simulated power load < 5CViolation may lead to too high module temperatures and (possible) thermal runaway CF to stave GND resistance < x.xx OhmViolation may lead to extra noise in final operation? Tube resistance to Stave face sheet > x.xxGOhmViolation may lead to extra noise in final operation? 10/07/2013Liverpool WP4 Meeting (11/7/13)6

How do we (I?) Proceed? Draft of a draft? – Please comment (by ) and I’ll collate – Produce draft Timescale ~ 2 weeks? Scope as shown on page 3 – Discussion in UK first – out to Lynn, Haber et al.. Should aim for final draft version (!) by end September /07/2013Liverpool WP4 Meeting (11/7/13)7