Orange Creek Basin Stakeholder Engagement. Meeting Purpose  Review FWC’s Stakeholder Engagement Process  Update the public on the previous 6 months.

Slides:



Advertisements
Similar presentations
Revegetation after management What areas have been overlooked or under studied? Environmental factors: Conditions influencing the outcome of planting native.
Advertisements

Climate Adaptation Planning: from Vulnerability Assessment to Strategy Identification -A New York Workshop Case Study- Chris Hilke Climate Change Adaptation.
Spoil to Splendor: A Story of Chesapeake Bay Island Restoration Presented by Christopher P. Guy, Peter C. McGowan And Robbie Callahan U.S Fish and Wildlife.
Avista Aquatic Weed Management Programs David Armes Terrestrial Resource Specialist Avista Corporation office: (509) cell: (509)
Webster Lake Plant Survey 2012 Ken Wagner, Ph.D., CLM and Maxine Verteramo Water Resource Services, Inc.
Measure M2 Freeway Environmental Mitigation Program.
Barr Hammock Levy Prairie Loop Trail Alachua County Board of County Commissioners, October 28, 2014.
Watershed Update, Kahler, ECF, 6/26/2014. The Kahler Challenge.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Background Initiated in 2004 – for update of Lygodium microphyllum Management Plan Basic Idea – find out what land managers are currently doing to control.
WLCI Update July 23, 2010 Conserving World-class Wildlife Resources Facilitating Responsible Development.
An Overview of Recent Changes To the EEP Restoration Plan and Mitigation Plan Templates Steven D. Roberts Vegetation Senior Specialist
Eurasian Water Milfoil. Exotic Eurasian Water Milfoil 11 Native Species of Water-milfoil in North America. 7 Native Species of Water-milfoil in Wisconsin.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Most Common Conservation Practices Forestry Illinois.
SAGHA Annual Homeowners Meeting August 20, Agenda  Open Board Positions Resolution  Year in Review  Treasurer’s Report  Common Area Items.
IMPACTS OF LAND DEVELOPMENT ON OREGON’S WATERS 2001 This slide show was borrowed from the internet but we added our own research when we presented it.
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Wetlands. What is a Wetland? Types of wetlands. – Marshes – Swamps – Bogs – Fens Types of wetlands. – Marshes – Swamps – Bogs – Fens Water saturated patches.
Sonoma Ecology Center TMDL Implementation Project Update November 4, 2011 Funded by EPA, Managed by SFEP, Administered by MMWD, and north bay partnership.
Accomplish More Together Conservation Planning for Green Infrastructure: A Greenprint for Sustainability Michael S. Fishman, CWB, PWS Greg Liberman, CPESC.
Lake Apopka Restoration Proposed projects for Legislative Appropriation.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
May 27 th, 2003FRCV Conservation Plan Summary and Status Rock Creek Valley Conservation Plan & Priorities Prepared by Friends of Rock Creek Valley with.
STATUS OF GREEN LAKE. Status of Green Lake Lake Management Plan Approved Lake Management Plan Approved Three Grants Awarded Three Grants Awarded.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Timeline History NOV 2007 Community process began MAY 2009Draft Recreation and Open Space Element released JUL 2010 Funding for the environmental review.
Alachua County Forever Cattle Grazing Business Plan January 24, 2012.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
Involvement in SW Jemez Mountains Landscape Restoration Project (SWJMLRP), under CFLRP March 12, 2015 PUEBLO OF JEMEZ.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
Sustaining Front Range Forests & Communities February 26, 2010.
Proposition 1 Workshop: the Grant Application Process July 2015.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Dredged Material Beneficial Uses/Alafia Banks, Whiskey Stump Key and McKay Bay Dredge Holes August 12, 2004 Presentation to ABM.
A Harbor Herons Habitat Pilot Project? Photo: Don Riepe.
Advance Mitigation: California Department of Fish and Wildlife Collaborative Advance Mitigation planning contributes to the fulfillment of regional conservation.
Orange Lake Habitat Management Plan Stakeholder Input Process Public Meeting #2 October 13, 2015.
Take & Incidental Take Permit Take: means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, collect or attempt to engage in such conduct.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Condition of Forests in San Diego County: Recent Conifer Tree Mortality and the Institutional Response Presented by California Department of Forestry Mark.
First year monitoring of newly constructed oyster platforms in Sarasota Bay, Florida Jay R. Leverone 1 and Gary Raulerson 2 1 Mote Marine Laboratory, Sarasota,
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
CREW Management Area Steve Coughlin, Section Administrator Land Stewardship Section.
St. Johns County Water Quality Program Update March 15,
Monroe County’s Participation in the FWC Pilot Program for Anchoring & Mooring Stakeholder Workshops June 7-9, 2011.
Response of Understory Vegetation following Western Juniper (Juniperus occidentalis) Cutting on Two Sites Breanna S Sabin FS 533.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
New Mexico’s Nonpoint Source Management Program and Plan Revision.
Bill Hubbard Southern Regional Extension Forester taking the urban forest to the next level.
GREEN GROWTH TOOLBOX Wildlife & Natural Resource Stewardship in Planning Wildlife & Natural Resource Stewardship in Planning Black-crowned night heron.
Carpenter Environmental Associates, Inc. Ralph E. Huddleston, Jr.
The Urban Forest Management Plan
This photo was taken in August 2008.
Jay R. Leverone1 and Gary Raulerson2
how do I know when I’m done?
WESTCAS Fall Conference Tuesday, October 23, 2018 Dick Fleishman
Orange Creek Basin Stakeholder Engagement
Cost Difference Mechanically Harvesting Material 7500 per acre
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Orange Creek Basin Stakeholder Engagement

Meeting Purpose  Review FWC’s Stakeholder Engagement Process  Update the public on the previous 6 months of interim management  Propose interim management for the current year

Public Meeting Interagency Working Group Identify Themes Stakeholder Input Identify Issues Basin Management Action Plan (BMAP) Process Community Working Groups Appropriate agency will lead/facilitate. Work on issues within a theme: Develop management plans. Gather data and information. Report on feasibility and costs of projects. Stakeholder involvement. Provide updates through BMAP process Interagency Working Group Project Development

Orange Lake Habitat Management Plan Community Working Group  FWC is the lead agency  Stakeholders will be involved from the beginning and throughout the process  Process will be facilitated by Normandeau Associates  Process is anticipated to take at least a year and a half

What do we do now?  Community Working Group –Long-term solution –High level of stakeholder input –Will take time  Interim Lake Management Activities –Short-term work –Utilize current funding

Interim Lake Management Activities  Short term projects intended to address immediate management needs while long term Habitat Management Plan is being developed.  Focused primarily on management of public access areas and maintenance control of exotic species.  Limited small scale habitat enhancement efforts intended to meet ongoing commitments and maintain existing enhancement sites.

 Access & Navigation –Maintain at least two points of public access.  Priority Level 1 –East: Marjorie Kinnan Rawlings/Cross Creek –West: Mike’s Fish Camp  Priority Level 2 –Macintosh Bay/Tower to Tower Trail –Essen/PG Run Interim Project Proposal Dec – Jun. 2015

 Two Primary Access Points Being Maintained –East: Marjorie Kinnan Rawlings/Cross Creek- ongoing- *recently blocked* –West: Mike’s Fish Camp-ongoing  Secondary Trails –Macintosh Bay/Tower to Tower Trail – trail cut in Jan-Feb has since been blocked by tussocks. –Essen/PG Run – work canceled due to unstable conditions and large drifting tussocks. –Heagy Burry now open due to favorable winds.  Sixty acres of vegetation managed last fiscal year by mechanical shredder for access. Access & Navigation ***UPDATE***

 Habitat Enhancement –Essen Run Deep Marsh & Rookery Island Enhancement  Consistent with FWC habitat guidelines document –Surplus of Shrub Swamp and Floating Marsh –Deficit of Shallow/Deep Marsh and Open Water  Mechanical Methods –Harvesting –Shredding  Potential dissolved oxygen improvement –Improved habitability for all aquatic organisms Interim Project Proposal Dec – Jun. 2015

Habitat Enhancement **Update**  Essen Run Deep Marsh Restoration Project -Approximately 67 acres accomplished to date- 90% complete. -Restored transition from upland/wetland interface to shallow marsh to deep marsh -Spatterdock and submersed aquatic vegetation returning -Promising fisheries response -Avian roosting

Essen Run Deep Marsh Restoration October 2013 September 2014

Rookery Islands Enhancement **Update**

Redbird Island May 2015

Redbird Island May 2015 September 2014

Grassy Point May 2015

 Avian Monitoring –Several hundred birds representing approximately 20 different species observed foraging in mulched vegetation during treatment. –Roosting observed immediately following treatment at Redbird Island and Grassy Point. –Active nesting at Redbird and North Islands  Little Green Heron  Anhinga  Mixed Egrets Rookery Islands Enhancement **Update**

Dissolved Oxygen Monitoring  DO within shredding zone and at a control site with similar vegetation cover was monitored before/during/after.  Improvements observed in dissolved oxygen profile  Long term monitoring to be performed quarterly for one year to compare DO at treated vs. untreated sites. Rookery Islands Enhancement **Update**

Interim Lake Management Activities July 2015 – Jun  Public Access and Floating Exotics Control  Small Scale Habitat Enhancement –Based on current availability of funds –Projects that are logistically feasible under current conditions. –Regulatory approval - permits in hand or feasible within short timeframe. –Aquatic plant and/or floating tussock management only.

Access & Navigation  Goal- continue to maintain at least two points of access at all times. –Marjorie Kinnan Rawlings/Cross Creek –Heagy Burry –Mike’s Fish Camp –Macintosh/Sportman’s cove –Essen/PG Run  Dependent on wind and scale of blockage- not necessarily all locations all the time  Restore with mechanical methods and maintain with herbicide when feasible.

Habitat Enhancement FWC-AHRES  Ongoing commitments related to USFWS/OLA Grant Projects –Essen Run –Cypress Island  Maintenance of existing habitat enhancement sites –Essen Run –Rookery Islands –Scrape sites (work performed in 2002)  Combination of Mechanical and Herbicide –Total area estimated to require maintenance/management is 150 acres (75/75)  Consistent with FWC habitat guidelines document –Surplus of Shrub Swamp (+1,188ac) and Floating Marsh (+3,354ac) –Deficit of rooted Shallow Marsh (-373ac) and Deep Marsh (-294) –Based on 2013 mapping- will be updated in 2016

Habitat Enhancement Summary

Additional FWC Activities  Investigating the feasibility of: -Anchoring large floating tree islands -Installation of heavy duty buoy lines at access points -Interagency coordination for prescribed fire

How do I stay informed? Orange Creek Basin Interagency Working Group web page –

Questions?

Rookery Islands Enhancement **Update**  A total of 150 acres of mechanical shredding completed 06 Feb-27 Feb –Bird Island(33ac)- vegetation within 300’ disturbance buffer preserved with a 300’ wide “moat” zone created beyond the buffer. –Redbird Island(48ac)- vegetation within the disturbance buffer mostly removed to restore deep marsh conditions immediately adjacent to nesting substrate. Moat zone of variable width ranging from 150’-300’ created for improved edge/diversity. –Grassy Point(69ac)- floating vegetation and willows removed to isolate offshore stand of willow into and island like configuration. Two islands (10ac and 45ac) created with variable moat zone 150’-300’ wide.