The High Altitude Observatory (HAO) at the National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is sponsored by the National Science Foundation. Any opinions, findings and conclusions or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the views of the National Science Foundation. COSMO Large Coronagraph Preliminary Design Review Welcome and Introductions National Center for Atmospheric Research Boulder, Colorado November 16-17, 2015
COSMO PDR (November 16-17, 2015) Welcome and Introductions Charge to PDR Committee Based on the NSF Large Facilities Manual (June – 2015) we adopt the modified guidelines for a comprehensive Preliminary Design Review. The COSMO PDR Committee is tasked with evaluating the COSMO Observatory presentations and supporting documentation in addressing these objectives. 1.Evaluate the project science objectives and priorities of the proposed facility. 2.Evaluate the flow down of observatory requirements from Science, Operations and Safety and the documented verification of these requirements through design documents, technical analyses and trade studies. 3.Evaluate design approach and maturity of key technologies. 4.Evaluate plans for management of the project during construction, oversight of major sub-awards and subcontracts, organizational structure. 5.Evaluate the project budget and schedule. 6.Evaluate the project risk register and levels of contingency.
COSMO PDR (November 16-17, 2015) Welcome and Introductions PDR Logistics Restrooms Cafeteria Wireless Access Adrian Trujillo Dinner Monday Night 6:30pm at Steve Tomczyk’s house 4181 Saint Croix St., Boulder, CO (head count)
COSMO PDR (November 16-17, 2015) Welcome and Introductions COSMO PDR Agenda (Room CG1-3131) TimeSubjectPresenter 8:30 Start (15 min)Welcome and IntroductionsJim Hurrell, Michael Thompson 8:45 (30 min)COSMO OverviewSteven Tomczyk 9:15 (30 min)Science Rationale and Use CasesEnrico Landi 9:45 (30 min)Concept of OperationsPhil Oakley Break 10:15 to 10:30 10:30 (20 min)Safety PlanScott Sewell 10:50 (30 min)Requirements Flowdown and Verification PlanPhil Oakley 11:20 (30 min)Site Analysis and SelectionSteven Tomczyk Lunch 11:50-1:30 1:30 (40 min)Coronagraph Optical Design and Scattered Light AnalysisDennis Gallagher 2:10 (30 min)Objective Lens FEA StudiesPete Nelson Break 2:40-3:00 3:00 (30 min)Birefringent Filter Design & PolarimetrySteven Tomczyk 3:30 (20 min)Flux BudgetPhil Oakley 3:50 (10 min)COSMO Collaboration in ChinaHui Li 4:00-5:30 PDR Executive Session 6:30 Group Dinner at Steve’s House 9:00 (30 min)Mechanical Systems DescriptionScott Sewell 9:30 (30 min)Control Systems DescriptionBrandon Larson 10:00 (30 min)COSMO Data Analysis and Archiving CenterEnrico Landi Break 10:30-10:45 10:45 (30 min)COSMO Data Analysis and InterpretationSarah Gibson 11:15 (20 min)Project Management PlanScott Sewell 11:30-2:00 PDR Executive Session (Working Lunch) 2:00-3:00Draft Findings from CommitteeTed Tarbell