Injector RF and Synchrotron RF Present Status, Activities, Plans PP-101201-a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.

Slides:



Advertisements
Similar presentations
Introduction to RF for Accelerators
Advertisements

Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
AUSTRIAN CONCESSIONAL LOANS Upgrading an Existing Hospital in Tirana, Albania A Case Study.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Part2: Cavities and Structures Modes in resonant cavity From a cavity to an accelerator Examples of structures JUAS 2015 Linacs-JB.Lallement - JUAS
STATUS OF THE TOP-IMPLART PROTON LINAC P. Nenzi 1, F. Ambrosini 3, A. Ampollini 1, G. Bazzano 1, F. Marracino 1, L. Picardi 1, C. Ronsivalle 1, C. Snels.
13.1 Radios and Electromagnetic waves. New ideas for today: Electrical resonators (tank circuits) Electromagnetic waves (light) How FM and AM radio works.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1. Some recent views ( ) 2 Linac tunnel
Physics 1202: Lecture 18 Today’s Agenda Announcements: –Lectures posted on: –HW assignments, etc.
E&I Mission Statement To provide value to our customers, employees, shareholders, suppliers and our community by ensuring that our transactions and interactions.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Service excellence for customers world-wide The Cost Of Test: A Perspective from a Test Service Provider SETNET User Group 21 February,
Adams Accelerator Institute 10 - E. Wilson - 1/24/ Slide 1 Lecture 14 ACCELERATOR PHYSICS MT 2004 E. J. N. Wilson.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Electricity and Magnetism
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
WIRELESS CHARGING Presented by: K.MAHESH (08T81A1236)
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
CALIFES A proposed electron beam test facility at CERN
M.J. Barnes : Canadian Involvement with LHC
KEK news ( ) S.Tanaka.
Uppsala Commitment to ESS and FREIA Planning
Configuration Management and Layout Database ELENA Project
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
ESS RF Development at Uppsala University
Part2: Cavities and Structures
Part2: Cavities and Structures
Control Hardware & Status
RF systems introduction
Explanation of the Basic Principles and Goals
Documentation Theme Summary
G. A. Krafft Jefferson Lab Old Dominion University Lecture 1
Risk, Schedule, Deliveries
PSS verification and validation
RF introduction Anders Sunesson RF group leader
Electromagnetic (EM) Wave
Presentation transcript:

Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1

Contents I.Introduction What is “RF”? Main components of an RF system II.Injector RF System Overview Status, Plans, Actions III.Synchrotron RF System Overview Status, Plans, Actions IV.Summary and Outlook PP a-GKO_MACS_RfStatus 2 G. Kotzian WP RF - Present Status

INTRODUCTION PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 3

Recap : What is ‘RF’ ? RF, short for: Radio Frequency Wave length comparable to physical dimensions Field quantities = function(time, space) PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 4 velocity of propagation in a medium wave length frequency Practical Example: Mobile Phone Transmit energy by means of EM-fields.

How to accelerate particles? PP a-GKO_MACS_RfStatus 5 Force acting on a charged particle Force due to Electric Field Magnetic Guidance Field Charged particle dynamics are represented by Lorentz's Equation: G. Kotzian WP RF - Present Status Confined volume for EM-field + beam 1 2 Provide EM-field energy to volume 3 Control EM-field ToDo:

Main components of an RF System Resonant structure = cavity To store energy (in form of EM-field) To apply E-field component in beam direction RF amplifier To build up EM-field, i.e. to power the cavity RF signal generation = LLRF Drives the RF amplifier  LLRF (Low Level RF; means: low signal level) Consists of closed loop controls, to ensure HW performance and beam stability/reproduceability PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 6 cavity LLRF 1 2 3

Work package RF 7 Accelerator Injector RF RF Amplifier Resonant Structures RF Feedback Loops Synchrotron RFRF Amplifier Resonant Structures RF Feedback Loops Today PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status Today

INJECTOR RF PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 8

Injector RF – Overview, RF signals PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 9 M&A 1 Digital LLRF Amp 1 PLC M&A 2 Amp 2 PLC Amp 3 PLC Amp 4 PLC RF DRIVE 1 RF OUT 1 MO Monitor Fwd/Refl Monitor RF DRIVE 2RF DRIVE 3RF DRIVE 4 RF OUT 2RF OUT 3RF OUT 4 Monitor Fwd/Refl Tank probe 1Tank probe 2Tank probe 3Tank probe 4 Monitor

Injector RF – Present Status Two-stage negotiated tendering procedure For RF amplifiers + LLRF About to be successfully completed Definition of contract scope/optional items Amount of documentation we get On-site visits and system simulator access Provision of LLRF System “CERN” mid 2011 PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 10

Injector RF – Plans Concentrate requirements in terms of controls On-site tests (~2 weeks, close to Zürich) Install and run LLRF “CERN” – Mid 2011 Delivery of RFQ amplifier for ITS – End 2011 Run ITS at CERN (LLRF “CERN”) Delivery of IH amplifier to Wiener Neustadt – End 2012 RF conditioning of IH tank (LLRF “WN”) Ship CERN equipment to Wiener Neustadt - End 2012 Merge LLRF “CERN” and LLRF “WN”, Run Injector PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 11

Injector RF - Actions Contract Signature with Supplier Requirements Document, WP CO Define on-site tests (Supplier, WP-CO) Prepare LLRF “CERN” PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 12 Short term Mid term Long term

SYNCHROTRON RF PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 13

System Overview 14 G. Kotzian WP RF - Present Status PP a-GKO_MACS_RfStatus

Synchrotron RF – Present Status Identified synergies with CERN PS-Booster upgrades in preparation: Collaboration Agreement between CERN RF-group and MedAustron Big effort, covers LLRF + cavity + amplifier New team member started, working on LLRF hardware development Implementation of firmware components PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 15

Synchrotron RF – Plans Finalize Collaboration Agreement (CERN) Requirements Document (WP-CO) Develop LLRF prototype – Fall 2011 For beam using CERN infrastructure LLRF series production MACS integration – Spring 2012 Overall system tests LLRF+cavity+amplifer – Mid 2012 Wiener Neustadt Installation, commissioning, operation – 2013 PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 16

Synchrotron RF – Actions Finalize Collaboration Agreement Requirements Document, WP CO Prepare LLRF tests for end 2011, CERN (Build cavity prototype) PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 17 Short term Mid term Long term

SUMMARY AND OUTLOOK PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 18

Summary and Outlook Injector RF and Synchrotron RF Two independent and different systems Implementation approaches Synchrotron RF  build in-house Injector RF  purchase solution Next big steps: Contract signature for Injector RF Accepted collaboration agreement for Synchrotron RF Requirements documents PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 19

THANK YOU! 20 G. Kotzian WP RF - Present Status PP a-GKO_MACS_RfStatus