1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Silicon Preshower for the CMS: BARC Participation
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Thomas Jefferson National Accelerator Facility Page 1 Latifa Elouadrhiri Assistant Project Manager Hall B SVT Technical Review Jefferson Lab January 19-20,
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
Tracker Visualization Tool: integration in ORCA Maria S. Mennea, Giuseppe Zito University & INFN Bari, Italy Tracker b-tau Cosmic Challenge preparation.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague1 Peter Kodyš, Zdeněk Doležal, Pavel Řezníček, Zbyněk Drásal, Jan.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Central tracker design svt layout changed to accommodate micromegas CLAS-Note regions not 4 regions region 3 has 16 sectors not 18 sectors new.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Development of Cryo-Module Test System (CMTS-1) S.B. Jawale Head, Centre for Design and Manufacture BARC, Trombay, Mumbai Cryo-Module Test System.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Hall B Gas System Controls Physics Detector Support Group.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
S.Movchan Straw manufacturing and QC
Micromegas Vertex Tracker Status Report
ROD assembly and test in US
Integration and IR Hall
First Assembled Rod in US
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Progress on cryostat design and production
Presentation transcript:

1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015

2 SVT Progress Module production complete, reception test done, test stand and fixtures received Cooling system commissioned, flow meters installed SVT Test Stand assembled for R1-R4 SVT Region 1 modules installed, surveyed, tested, burned in Region 2 disassembled Region 2 assembly started SVT Region 4 cold plate and support tube in fabrication Integration tooling (SVT R1-3/4 and MVT) analysis done, documented, and the report is being reviewed Integration tooling drawings made, first round of review completed, feedback provided to designer Service cart analysis done and is being documented Service cart drawings made, first round of review completed, feedback provided to designer Cosmic data taking in progress Chiller EPICS software developed SVT detector web page created in Clas12Docs using Sphinx

3 SVT Test and Assembly setup in EEL 124 R3 R2-3 SVT R1-2 R1-3 R4 R3 UPS Cosmic stand R2 ring R3 ring

4 R2 installation R2 ring

5 EPICS SVT Control and Monitoring

6 SVT Monitoring: Region 1 Hybrid Temperature

7 SVT Monitoring: Region 1 Leakage Currents

8 SVT Cosmic Data taking

9 SVT Web page in Clas12Docs