RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,

Slides:



Advertisements
Similar presentations
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Advertisements

LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
BEAM PREPARATION IN INJECTORS AND BEAM CHARACTERISTICS K.Cornelis BE-OP-SPS.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
RF strategy, limits and issues A. Butterworth L. Arnaudon, Ph. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, E. Shaposhnikova, J. Tuckmantel,
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Working Group 1 Synchrotrons/LHC Summary Report Mike Brennan Philippe Baudrenghien Four Talks, and much discussion (LHC)
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Longitudinal Painting S. Hancock p.p. G. Feldbauer.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Harmonic system for LHC
Harmonic system for LHC
Space charge studies at the SPS
SPS Beam Quality Monitor: recap & cheat sheet
Longitudinal beam parameters and stability
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
PSB rf manipulations PSB cavities
RF and Sequences Andy Butterworth BE/RF
Wednesday 5th September - morning
Multiturn extraction for PS2
FCC-hh injection group 7
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Monday 18 October : Collimation system
LHC RF Status Reported by P. Baudrenghien CERN-BE-RF
The LHC25ns cycle in the PS Triple splitting after 2nd injection
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Beam dynamics requirements after LS2
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
I-LHC NOMINAL ions beam in 2007
Collective effects in the SPS and LHC (longitudinal plane)
SPPC Longitudinal Dynamics
Summary Tuesday h23: Machine closed. Precycle started.
PSB magnetic cycle 900 ms MeV to 2 GeV
Kicker and RF systems for Damping Rings
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group, 16 th Nov 2010

giulia papotti (BE/OP/LHC) voltage reduction at injection – 1 similar to SPS 4 inj cycle –dip to 2MV from 3MV problems: –for clean capture (no tails) voltage should be ~ matched to the SPS bucket –~ MHz –bunch grows quickly during the very long filling (IBS) - > loss from the bucket solution: –flat bottom at 7MV –reduction to 3.5MV for each inj –adiabatic descent from F1K, 1s long –adiabatic rise back to 7MV, 1s long total length: 5s Delphine’s art… and SPS experience then linear acceleration ramp from 7 to 12MV SPS TOTAL VOLTAGE LHC TOTAL VOLTAGE conserve longitudinal emittance larger momentum spread reduces IBS larger bucket reduces losses

giulia papotti (BE/OP/LHC) voltage reduction at injection – 2 transmission much improved – almost no losses at start of ramp Bunch length 19% L increase at each V reduction Capture loss

giulia papotti (BE/OP/LHC) emittance blow up during ramp – 1 rectangular phase noise power spectral density that excites only the core –avoid tails and losses –hit: 0.87 f s < f < 1.1 f s corresponds to a 1.2 ns window in the core –follow f s along the ramp from 57 Hz to 28 Hz method developed by Joachim and RF studies section for the SPS algorithm: adjust the amplitude of the excitation x n from a measurement of the instantaneous bunch length (mean) L n and comparison to target L 0 target bunch length L 0 1 ns for ions –was 1.2 ns for protons Phase noise spectrum Part of the bunch excited

giulia papotti (BE/OP/LHC) emittance blow up during ramp – 2 LSA functions: synchrotron frequency f s, f max and f min blow up time constant, gains, max excitation amplitude blow up system hardware armed with sequencer tasks blow-up is then initiated by the ramp timing event BLOW UP GAIN SYNCH FREQUENCY Controls developed by Delphine and Michael Jaussi

giulia papotti (BE/OP/LHC) emittance blow up during ramp – 3 excitation amplitude bunch lengths ramp

giulia papotti (BE/OP/LHC) emittance blow up during ramp – 4 at injection –slow lengthening, up to 1.5 ns BQM vetoes the SPS extraction if length >1.6ns at flat top –bunch lengths nicely equalized –some equalization takes place during the ramp even without blow-up though...but less