Doug Michael Sep. 16, 2002. 120 GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
MAP Meeting, IUCFMarch 12-13, Progress in Barrier Stacking W. Chou, J.Griffin, K.Y. Ng, D. Wildman Fermilab Presented to MAP Meeting IUCF, Indiana.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
PAC Meeting, December 12, Prebys 1 The Problem.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB rf manipulations PSB cavities
Muon Acceleration using 8 GeV Proton Driver Linac
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Doug Michael Sep. 16, 2002

120 GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700 m x 2 m diameter decay pipe for neutrino beam. 200 m rock absorber. Near detector complex. Near detector

NuMI Beamline Current nominal plan for NuMI: Booster filled with 5e12 protons and accelerated to 8 GeV. Six batches injected into Main Injector, 5 of which go to the NuMI target. 2.5e13 protons / 1.9 s cycle 2.3e20 protons/ year compared to design 3.8e20/year. Maybe Less!

Note: Other uses of Main Injector protons and cycles will decrease the proton intensity for MINOS. Test beam running will presumably be kept small enough to keep impact <10%. CKM or other experiments could have larger impacts, possibly around 30-40%.

Accelerates beam to 400 MeV for injection to the Booster. Typical operating ability ~45mA of which only a fraction is used. No serious issues here with the possible exception of details of injection of the beam into the Booster. One can keep filling the Booster with more and more LINAC beam, the problem is keeping it in the Booster once it is there.

8 GeV Synchrotron with 15 Hz resonant magnet ramps. Currently accelerates ~4.5e12 protons per cycle. Limited by proton losses (7e12 injected) For NuMI/MiniBooNE, the Booster must: –Increase typical acceleration cycle rate from ~2 Hz capability to ~12 Hz (with many possible steps on the way) –Increase protons per cycle from typical 4.5e12 to 5-6e12. –Increase protons per year from ~3e19 to ~1.5e21… radiation and activation issues. –Decrease longitudinal emittance from ~0.15 eVs to ~ eVs for MI stacking.

Hardware upgrades to permit faster cycle time. (Some already planned.) –New extraction septum magnet –New extraction power supplies –Upgraded/revamped RF power? New hardware to help stabilize the beam, reduce proton losses and yield sufficiently small emittance on extracted beam to permit Barrier RF stacking in the Main Injector: –Ramped correctors (already planned/installed) –New collimators (already planned) –Larger diameter RF cavities –Inductive inserts –Additional acceleration RF harmonic cavities Reduce space-charge at injection time by spreading beam out Reduce longitudinal emittance at extraction

150 GeV synchrotron run at 120 GeV (or lower) for NuMI. Circumference = 7x Booster: Room for 6 Booster batches. Antiproton production uses just one batch per cycle. The remainder are available for other experiments, NuMI being the primary user for the forseeable future. Minimum cycle time at 120 GeV = 1.5 s. Cycle time for multi-batch NuMI operation = 1.9 s due to multiple Booster cycles for filling. Nominal design for 2.5e13 protons per cycle. With only small modifications can probably handle up to 5-6e13. The main issue is how to get them there. There may be some stability issues too but this remains to be seen. To go higher than ~6e13 protons per cycle, additional RF power will be needed as well as additional systems to maintain stability. Recycler Ring Main Injector

Additional RF power – More power for extra proton intensity – Reduction in cycle time Reduction in Cycle Time –Machine tuning –Additional RF with modified RF cavities –Additional magnet power supplies New damper electronics and components. – Necessary to go to higher intensity. –Immediate gains of 30% or more Collimators to protect sensitive components from beam losses. Barrier RF stacking: –Appears promising for increasing protons accelerated to 120 GeV by 60%. Compared to single batch slip stacking for pbar production will increase the protons to NuMI by as much as a factor of 2.4! –Requires well-behaved Booster –Requires new barrier RF systems in Main Injector. Fast “Recycler” stacking: –Uses barriers and an RF ramp to stack. Very similar to barrier stacking but possibly with less longitudinal emittance blow-up.

The injection is done with normal 53 MHz RF off. The first Booster batch is injected.

A square-wave accelerating barrier moves through the first batch, increasing the momentum and shifting the position of the coasting protons. A second Booster batch is then injected just at the leading edge of the square wave.

The barrier keeps moving and new Booster batches are added until the MI is full. At this point, the 53 MHz RF is switched on slowly and the protons are adiabatically captured (takes 10 ms) for acceleration. Nominally twice as many protons are then in the Main Injector.

Very new idea from Foster and MacLachlan De-bunched Booster batches are injected into the MI and then an RF ramp is applied along with moving barriers at each end. The ramp does most of the work of stacking. Once the beams are stacked, they are adiabatically captured in 53 MHz buckets. Many similar issues as barrier stacking. See the movie!

: Define 5 year improvement program Relatively small factors from several improvements can make a big overall difference: –YearPossible ProtonsTasks e20Current capability e20Booster/MI damping e20Booster/MI RF e20Booster/MI RF/power, stack e20Booster/MI RF/power, stack e20MI cycle time, stack e20.

Rough correlation between the total funding level and the number of protons which can be accelerated to 120 GeV per year in 2005 and 2008.

Fermilab Beams Division is currently very busy with collider issues. These overlap with NuMI proton intensity issues at perhaps the 20% level. Currently, there is a large effort on the Recycler, nominally lasting through January We are beginning to work with Fermilab Management to define a directed investment program for NuMI proton intensity. Some level of investment will certainly be undertaken for MINOS. The Directors indicate that the level at which they are prepared to invest in the NuMI beamline may depend on plans for future experiments, off-axis in particular. We are working on building a “MINOS army” of people working on accelerator issues. We have a bi-weekly meeting to help integrate new people into the work and to keep focus on the relevant issues. (This is a phone/Web meeting so it is possible to join from afar.) There are many opportunities for outside collaboration and contribution. Work on this could/should be considered a contribution towards a new off-axis experiment.

Use the recycler ring as a stacker for Booster protons and injector to the MI. –MI can spend its entire time ramping. (Hopefully with as little as 1.0 s ramp cycle time for the MI.) –Is recycler needed for BTeV? –Beam power approaching 1 MW should be possible Build a new 8 GeV proton driver to replace the current LINAC/Booster. –Synchrotron Option Initial MI beam power of 1 MW, upgradable to 2 MW ~$200M first phase + $?M second phase –LINAC Option Build ala TESLA… Acts as a prototype? Good for electrons and protons Straight to 2 MW capability? $300M? –Either option needs additional MI RF and stability improvements. ~$25M. – for latest update on Study II report.

It is possible to make investments in the existing accelerator complex at Fermilab to make major increases in the proton intensity for the NuMI beamline. –0.3 MW by 2005 –0.6 MW by 2008 –1.2 MW by 2010 A new proton driver (replacing the current 8 GeV Booster) can bring the proton power up to ~2(+?) MW. It is clear that for an off-axis experiment that investment in the proton intensity will be very attractive in addition to construction of a very massive detector. There is much work which can be done now and many opportunities for new collaboration.