Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,

Slides:



Advertisements
Similar presentations
The introduction of new classifications of economic activities and products in Ukraine Workshop on International Classification Chisinau March 2013.
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
ENVIRONMENTAL MANAGEMENT PLAN
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Purpose of the Standards
Air activation inside and around the SPS beam dump M. Baudin H. Vincke DGS-RP-AS.
Codex Guidelines for the Application of HACCP
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Effective Methods for Software and Systems Integration
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
Study of a new high power spallation target concept
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Neutronics & RP Issues Neutronics & RP Issues nToF Review 14 th February 2008 CERN AB/ATB/EET n_TOF Team.
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5A. Marchix19/09/2013 Thanks to : AP. Bernardes/EN/STI, J.Blaha/DGS-RP,
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
1 1. Some recent views ( ) 2 Linac tunnel
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
State of Georgia Release Management Training
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Status of n_TOF Facility
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Heating and radiological
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
The n_TOF Facility Today
Quality Assurance applied to Accelerator Safety
Project Management Process Groups
C. Adorisio Extracted from the presentation given at
12 Safe Maintenance Rules
PSS verification and validation
Radiation Protection Handbook
Radwaste: status & way forward
Overview of the TARGET Monolith Rough Vacuum
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
n_TOF Target #3 Baseline Design
Presentation transcript:

Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN, 14 February 2008

Procedures  According with the CERN Safety Policy a new Project or a significant Upgrade of an existing System, require the preparation of a Safety File.  The scope of this document is to guarantee that the Safety Rules applying at CERN are satisfied and that the adopted solutions are in line with the ALARA principle as far as the Radioprotection is concerned. A Safety File is divided in three documents: 1.Explanatory Part where the solution adopted are described 2.Demonstrative Part where the choices are justified 3.Operating Part where the operating procedures are described The Operating Part is “dynamic” and is continuously upgraded following the Acquired Experience during exploitation.

Procedures The Documents are classified in the EDMS and validated following a defined Approval Procedure

Procedures  In the Safety File the description is maintained concise.  In the document there are links to detailed descriptions, calculations or test.  Depending on the level of potential Danger, a Risk Analysis is organized to help in the choice of Options.

Documents in preparation: Ventilation System This document is of primary importance because is covering the risks of contamination for the Public. The solution adopted, based on the simulations reported in the next slides, is a continuous air recirculation in the Target Area without exchange with outside. The circulating air is filtered and the isotope content monitored. The access in the area is granted only with beam off (interlock) and after an appropriate delay. The air in the tunnel is expelled only if the radioactivity is below the exception limits. The Operating Procedure is a part of the Safety Document.

Ventilation System: Area lay-out Critical Group: Border Guards Target Experimental Area Decay Tube

Ventilation System: Simulation parameters Isotope production yield: simulated with FLUKA (39 isotopes considered) Isotope production yield: simulated with FLUKA (39 isotopes considered) Target material: Lead (dimensions of the old Target) Target material: Lead (dimensions of the old Target) Target Shielding: unchanged Target Shielding: unchanged Irradiation time: 6 months/year Irradiation time: 6 months/year Proton intensity: 5x 7x10 12 p/supercycle (2.4x10 12 p/s) Proton intensity: 5x 7x10 12 p/supercycle (2.4x10 12 p/s) Protons on target: 3.8x10 19 p (previous runs 1.6x10 19 p) Protons on target: 3.8x10 19 p (previous runs 1.6x10 19 p) Dose to the public Dose to the public - Definition of critical groups (border guards) - Calculation of dose conversion coefficients based on environmental models Investigated Solutions: Investigated Solutions: - Continuous Laminar Flow - Enclosed volume with Recirculation and Flush Before Access

Ventilation System: Release estimation The Estimated Dose for the Critical Group produced by n_TOF on the basis of a 180 days run at the maximum allowable proton intensity is: Continuous Laminar Flow : ~ 1µSv (~0.25 nSv/h) Flush Before Access: ~ 0.01 µSv/flush Since the goal for the whole CERN is to release <10 µSv/year, the Flush Before Access solution is adopted. For this item the Risk Analysis, part of the Safety File, is considered sufficient

Target Cooling System: Risk Analysis This item presents also the risks for the Public due to the possible release of contaminated water outside CERN. The risks for Personnel should be also carefully evaluated. Since the Target Cooling is a pressurized system, the possible spill of contaminated water must be evaluated. The risk reduction is done at the design level adopting the CODAP code used for the design of pressurized vessels and by implementing in any part of the system the “double containment” approach. For this item the Risk Analysis, part of the Safety File, is considered sufficient

Documents in preparation: Vacuum System This item presents risks for Personnel. The risks associated to the possible abrupt breaking of a window in a tube under vacuum is a common problem in the CERN Accelerators tunnels. The risks associated to the vacuum tube in the n_TOF neutron time of flight path should be evaluated due to the large volume under vacuum. The potentially dangerous part is constituted by three sectors ~ 60 m longs of Ø=80, 60, 40 cm (~ 60 m 3 ). On the Ø=80 side a window described in the next slide is closing the volume. On the Ø=40 side a Gate Valve (very robust construction) is closed in case of access to the Experimental Area (interlock)

Vacuum System: The neutron Window The neutron window, constructed machining a monolithic Al alloy block, has a reinforced structure assuring good mechanical performances. According with a study taking in account the fatigue endured in the past runs, the life time expectation under the new load conditions is estimated to: ~ 2x10 11 pulses of 7x10 12 protons (~ 10 5 years of run…….)

Risk Analysis: Vacuum System The possibility of an abrupt breaking of the neutron window (or valve) should be assessed and the consequences evaluated. For this item the Risk Analysis, part of the Safety File, could be validated by an external consultancy.

Documents in preparation: Old Target Disposal After the first discussion on the subject with PSI made last year before the target removal, the shipment to PSI is a realistic solution. The Safety File describing the shipping procedure based on the measured dose rate and FLUKA simulations will be prepared during The shipment could take place end 2008 or beginning In principle the target will be housed in a sealed container disposed together with the target. Finalisation of the shipment will be discussed with PSI. For this item the Risk Analysis, part of the Safety File, is considered sufficient

CONCLUSION The Safety File procedure is a good tool for the assessment of the measures taken to minimize the risks. The Safety File procedure is a good tool for the assessment of the measures taken to minimize the risks. The risk evaluation is done on the basis of a standard matrix. The risk evaluation is done on the basis of a standard matrix. In case of a recognized high risk level, an external consultancy remains an open option. In case of a recognized high risk level, an external consultancy remains an open option. Many aspects of the Safety have been already analyzed but the formal document are not yet ready. Many aspects of the Safety have been already analyzed but the formal document are not yet ready. The Risk Analysis will be done in parallel with design effort. The Risk Analysis will be done in parallel with design effort. Thank you for your attention Thank you for your attention