Aug. 2, 2010 Proposal for Creating New Task Force - To Develop 7-year Scenario for LCGT - Ichiro Nakatani Project Manager, LCGT 1.

Slides:



Advertisements
Similar presentations
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Advertisements

COMPREHENSIVE MISSION COMMITTEE Committee formed at May 2011 BOR meeting Co-chairs: Deputy Commissioner John Cech MSUB Chancellor Rolf Groseth.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Page 1 Conflicts of Interest Peter Hughes IESBA December 2012 New York, USA.
Project Development: Planning & Implementation. What is a Project? “An enterprise undertaken to achieve planned results within a time frame and at some.
Honoraria and Reimbursements for Item Reviewers and Educator Leader Cadre Members Governing Board April 3, 2012 Tamara Reavis (DC) and Doug Sovde (Achieve)
SWAN Quarterly Meeting June 6,  Nov – April  March Quarterly: Consortia Survey Results  April SWAN Board meeting Executive Director/Board negotiate.
LCGT Program Advisory Board (June , Kashiwa, Chiba) On behalf of LCGT special working group Masaki Ando (Department of Physics, Kyoto University)
BS and Mirrors for the LCGT Norikatsu Mio, PSC Univ. of Tokyo Eiichi Hirose, ICRR Univ. of Tokyo December 13, 2011 CSIRO, Lindfield Australia.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
LCGT from the Viewpoint of System Engineering I. Nakatani f2f Mtg June 15, 2010 Institute for Cosmic Ray Research, Univ. of Tokyo Aichi University of Technology.
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
2009 Project Selection Task Force Recommendations Executive Board January 22, 2009.
Project Cost Management
1 School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting April 23, 2014 Castallo and Silky Education Consultants.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
Proposal to Establish the Transportation/Land Use Connection Program Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item 14.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
LCGT Meeting 12 October, 2010 Norikatsu Mio. Laser Discussion with Mitsubishi – Mitsubishi will offer their laser modules as a laser component and permit.
[A proposal for ILIAS NEXT: Cryogenics versus vibration] [I3-FP7 call] Abstract The reduction of thermal noise in solids is a basic requirement in many.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Project Overview: Title :“Developing a Green Business Support Strategy for UBCCE” Volume: € ( € in kind contribution from UBCCE) Main Goal:
MWAQC Work Program and Budget FY 2006 Joan Rohlfs, Chief, AQ Planning MWAQC April 27, 2005 ITEM 7.
Introducing Project Management Update December 2011.
Systems Engineering “Understanding Where it Fits in Your Agency” a session in fhwa’s Systems Engineering t3 series aug. 02, 2007.
LCWS13 Tokyo. Mr. Kawamura’s Talk Text (in English) – Can be downloaded from the workshop home page Please use today’s version Highlights – We are aware.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
Agnese Nelms Haury Program in Environment and Social Justice Request for Proposals Fall 2015 Informational Meetings October 8 and 9, 2015.
Evaluation of EUPAN – State of Affairs & Roadmap – EUPAN Troïka Secretariat Meeting Luxembourg, 7 th July 2015.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
Nominating Committee Discussion August 17 th 2012 Pamela Snyder P.E – Society Nominating Chair Nora Lin – Leadership Election Task Force Chair.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
Overview of iLCGT & bLCGT Kazuaki Kuroda LCGT Collaboration F2f meeting 27 September, 2010.
Input Mode Matching of LCGT 2012/1/5, Yoichi Aso.
DOW Recommendations June 16, 2016.
SGA Financial Review November 2nd 2016
PRR Activation Meeting
REWG activities in LILIIA MALON REWG Chair Prague
Elections – Dispensing with Primaries
Overview of The Access for All Advisory Committee
Yuta Michimura Department of Physics, University of Tokyo
YEAR 5 BUDGET.
Cost of Service Analysis & Rate Design
Reliability Assessment Guidebook (RAG): Status Report
City-wide LED Street Light Conversion Program
Reliability Assessment Guidebook (RAG): Status Report
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
AGREEMENTS OFFICE Support Agreement (SA) Process
Stan Whitcomb LSC meeting Livingston 21 March 2005
John Fisher Parent Council School Budget Year 2017 / 2018
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
R10 Annual General Meeting
CLIO underground in mine
Yuta Michimura Department of Physics, University of Tokyo
Preliminary Project Execution Plan
ORGANIZATION'S NAME HERE:
Presentation transcript:

Aug. 2, 2010 Proposal for Creating New Task Force - To Develop 7-year Scenario for LCGT - Ichiro Nakatani Project Manager, LCGT 1

Background 1. Initial 3-year portion of LCGT has partially been funded split off from the whole 7-year LCGT project. Proposal: This portion be called initial LCGT or iLCGT. 2

Background-cont ’ d 2. The remaining portion of the budget starting from April 2011 will surely be approved – totaling 15.5B yen. - There remains, though, a slight uncertainty in the amount of the whole budget to be approved. - The remaining portion of the project is proposed to be called baseline LCGT or bLCGT. 3

Background-cont ’ d 3. The basic philosophy of the LCGT project which has been proposed for the past 10 years shall have no change. The only difference is that it is requested to achieve significant mid-term result for iLCGT. 4

Background-cont ’ d 4. The challenges ahead are daunting – even for the iLCGT. The attention of the LCGT members seems to have mainly focused on the 3-year development scenario – for iLCGT, that is. 5

Proposal 1. A new task force be organized to establish the 7-year LCGT development scenario. With the basic scenario for the iLCGT already under discussion, the major focus should be on the latter portion of LCGT, bLCGT. 6

Proposal-cont ’ d 2. Task force objective Clarifying the following : 1) The necessary preparations for the bLCGT to be conducted during the iLCGT period - including R&D activities. 2) The roadmap for bLCGT. 7

Proposal-cont ’ d 3. Task force members: 1) M.Ando (chair) 2) Selection will be done by the chairman. 4. Schedule: Start: August 2, 2010 Final report to the PM: End of October

iLCGT OVERVIEW - Underground interferometer with 3km×2 arms - Room temperature (no cryogenic system) - FPMI (no PR, no RSE) - Low laser power (<10W) without TCS - Silica mirrors - SAS: installed, but not activated - Sensitivity: 5MPc for NS - NS 9