Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1.

Slides:



Advertisements
Similar presentations
Design and Implementation of Low- Cost Optical Telemetry to Support Radiometric Analysis of the Atmosphere University of Colorado at Boulder Alexandra.
Advertisements

BillikenSat – II Pico-Satellite that conforms to the CubeSat standard Team Leader: Darren Pais Electrical Eng.: Ben Corrado Payload: Rob Arechederra MISSION:
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Gary MKIII Results University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans.
Thomas Buck, Kyle Garner, Alexandra Jung, Quinn Mcgehan, Mark Sakaguchi, and Scott Taylor Team Solkraft Critical Design Review 10/7/2010.
Gary MKIII University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans.
Adam Archuleta Katie Cartee Logan Farley Patrick Klein Kamron Medina Catherine Villa TEAM INFINITY AND BEYOND LAUNCH READINESS REVIEW Fall 2011 Rev C
CASTOR Jr. MIT 2LT Corey Crowell 2LT Matt McCormack Lucas de la Garza Spenser Parra.
Team MADD Michael Davies Andrew Mountain Dan Hoang Daniel Brink Team MADD Michael Davies Andrew Mountain Dan Hoang Daniel Brink Power Distribution Control.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team S.H.I.E.L.D Launch Readiness Review Team Members Evan Coffey Aaron Holt Travis Pollok Matthew Ross Jared Turner Addison Woodward-Parrish 11/11/08.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Wireless Thermal Protection Sensors Presented By: Jesse Pentzer and Lucas Wells Brandy Holmes John Sochacki Chris Johnson.
METEOR BACKGROUND This is a foundation project in an ambitious endeavor to provide the RIT research community with a means to conduct near space.
1 SHOT II Communication System Experiment University of Minnesota Max Schadegg, Cole Christensen, Ian Macmillen, Steve Haviland June 10 th, 2010 University.
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
Cube Root Georgia Institute of Technology Matt Bigelow, Gregory Hansen, Sarah McNeese, Luke Walker.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Auburn University Student Space Program. Overview of AUSSP Auburn University Student Space Program Made of two groups –Auburn High Altitude Balloon (AHAB)
Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN TUCKER JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
University at Buffalo GLADOS SHOT II Balloon Payload Presentation June 29, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
TERSat Massachusetts Institute of Technology Eric Peters, Danilo Roascio, Leonard Tampkins, Kezi Cheng July 1st,
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
DemoSat IV Critical Design Review Metropolitan State College of Denver April 21, 2006.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Team: Hang Seven Conceptual Design Review Sierra Williams Ethan Hollenbach Rebecca Lidvall Nikhil Desai Paul Smith Lucas Migliorini Chase Goodman Abbigail.
National Postal Museum – Systems at Work Exhibit Lesson 1 – Handle with Care Presentation.
W.A.S.P. Wi-Fi Aerial Surveillance Platform. W.A.S.P. Small Scale, Open Source UAV using off the shelf components Designed to provide a vehicle to project.
Network UAV C3 Stage 1 Final Briefing Timothy X Brown University of Colorado at Boulder Interdisciplinary Telecommunications Program Electrical and Computer.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
Aerospace Digital Communication Instrument Senior Design 1 Presentation.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
1 ARMADILLO – SHOT II The University of Texas at Austin Post-flight Analysis Travis Imken Shaina Johl Christopher McBryde Travis Sanders July 1 st, 2012.
Aerospace Digital Communication Instrument Senior Design Presentation.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
REVEAL Instrument Overview What is REVEAL? Prototype strap-down (vehicle-independent) instrumentation system REVEAL provides the traditional (manned) airborne.
Arizona Space Grant Symposium April 19, 2008 SWE Imaging Payload Command and Data Handling Jordan Cluster.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
University at Buffalo GLADOS SHOT II Balloon Launch Results Presentation July 1, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
1 ARMADILLO – SHOT II The University of Texas at Austin Travis Imken Shaina Johl Christopher McBryde Travis Sanders June 29, 2012 Boulder, CO.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
O2n Cloud Nine Critical Design Review
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
PROJECT METEOR: RITSAT1 P08102
StratoBuoy II Matt Voll Brian Mayernik Pat O’Hara.
Team Solkraft Conceptual Design Review
CubeSat vs. Science Instrument Complexity
Panoramic Rays Critical Design Review
<Your Team # > Your Team Name Here
Presentation transcript:

Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1

Mission Overview: System Level Integration of Critical Subsystems Opportunity to integrate subsystems that are critical to satellite survival: Command and Data Handling, Electrical Power, and Thermal Control. Flight Testing of Critical Subsystem Components Power Management and Distribution Board Power MOSFETs and Thermistors Image Acquisition/Storage and On-board Processing Visible image acquisition through web camera Visible image storage on flash storage OpenCV library for on-board image processing 2

Expected Results: Verification of nominal subsystem-subsystem interaction through log of command out and telemetry in to the Flight Compute Element Thermistor Temperature Heater ON/OFF PMAD Board Voltage Image acquisition at altitude Verification of camera link to Flight Compute Element PR Value! Verification of on-board image processing routine on Flight Compute Element 3

Actual Results: Flight Recap: Power initiated prior to flight string integration Anxiously tracking and waiting for Prox-0.3 retrieval since data logged on-board Results: Structure/on-board electronics in tact Data (images/telemetry log) not present on SD card Average battery cell voltage at 8V compared to nominal 9V  thermal control successful? 4

Preliminary Failure Analysis: BeagleBoard experienced drops in voltage which resulted in second-stage boot-loader failure and system restarts. Primary cause of failure: During image acquisition, board was accessing the USB bus and drawing too much current. This problem was replicated after flight to confirm predicted reasons of failure. Data collection failure due to compiling errors of UART communication scripts. Primary cause of failure: Limited amount of development time with actual hardware. 5

Lessons Learned: System level hardware/software integration at early phase of development critical to mission success Allow sufficient time to connect subsystems and test everything together. Shift from traditional aerospace design philosophy to concurrent engineering needed Risk associated with having all monitoring of critical telemetry reside on the central flight computer Bring backup hardware! 6

Conclusions and Actions: While data was not retrieved during flight, ground tests showed all of the functionality in the mission overview Moreover, many valuable lessons learned related to system integration and testing came out of the process up to and during the balloonsat flight Success in the lessons learned 7

Action Items and Impact to Prox-1: Action Items to be fed back to NS-7 Redesign and rapid build of the power management and distribution board Investigate the possibility of monitoring critical telemetry on subsystem microcontrollers Integrate components and subsystems early in the I&T phase Shift our team’s approach to prototype development 8