Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
CMP COUNTRY ANALYSIS 13 th SG meeting Madrid 7 th February 2010.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
PROGRESS REPORT ON THE DEVELOPMENT OF THE IBERIAN GAS MARKET (MIBGAS) Presentation for South Gas Regional Iniciative 17th September 2007.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Harmonization of Cross Border Transmission Tariffs between
26th IG meeting 23th January 2014
Allocation of Capacity in Portugal Under the New Regulation
Background and Process
Allocation of Capacity in Portugal Under the New Regulation
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain

Index 1.Background 2.Current Situation 3.Pilot model

Background - Portugal  Two IPs IP43 - Valença do Minho / Tuy and IP42 - Campo Maior /Badajoz;  Until the end of 2002, Portugal natural gas supply was crossing the Spanish system from Algeria by pipeline. The LNG terminal started operation in 2004 and is now responsible for 55 % of the Portuguese supply.  Gas market liberalization in Portugal was opened to all traders and there is a growing demand at the existing IPs;  Beeing a new system (Portuguese Natural gas network started in 1997 based on 28 inch pipe) there are no internal congestions in the system;

Background - Spain  Two IPs with Portugal: IP43 - Valença do Minho / Tuy and IP42 - Campo Maior /Badajoz;  Two IPs with France: Larrau and Biriatou. In 2015, capacity between France and Spain will be 225 GWh/d from S  N and 165 GWh/d from N  S.  6 LNG terminals:  LNG storage cap: m 3 GNL  Regas capacity: GWh/d  IP with Morocco  IP with Algeria foreseen to enter into operation in 2011  In 2010 supplies to Spain were 414 TWh, 76% of LNG

Current Situation (I) One year contracts; Capacity reserve is free of charge; Capacity is not owned by the user (not paid before its use) but once allocated in not available to others; Capacity allocation occurs on sequencing time windows and scales ( year, month, week, day); Previously allocated capacity continues with the shipper only if confirmed for the new window; Only the non confirmed capacity in a certain window is available for allocation for additional requirements; Portuguese SystemSpanish System TSOs – Shipper nomination is guaranteed ( OBA) Shippers book capacity for a minimum period of 1 day. Spanish regulatory framework does not include any restrictions on the maximum duration of contracts, although in practice it is uncommon to see contracts for more than 20 years. Both firm and interruptible services. Breakdown of capacity products: Long-term contracts: equal to or more than 2 years Short-term contracts: less than 2 years TSOs must reserve for short-term contracts at least 25% of the sum of the total capacity of their LNG terminals, UGSs and entry into the transmission system. Each shipper is not allowed to hold more than 50% of the capacities reserved to this purpose. Rules to allocate capacity at IPs with France: Long-term capacity: more than 1 year Short-term capacity: equal to or less than 1 year 80/20 long-term/ short-term capacity split.

Current Situation (II) To guarantee access to capacity the sipper should be in the allocation game since the beginning; Existing supply ToP contracts have priority within each window for the available capacity; The Portuguese system has not experienced congestions so far. Portuguese SystemSpanish System TSOs – Shipper nomination is guaranteed ( OBA) The corresponding entry and exit capacity available at both sides of IPs with France has been offered and allocated through a single allocation procedure. Thus, Larrau and Biriatou were treated as one single commercial point for allocation purposes. Standard allocation mechanism: First Come First Served principle. In infrastructures where congestion might occur or at IPs, capacity can be allocated by other criteria (auctions or share out the capacity through transparent, objective and non-discriminatory criteria) In order to guarantee the use of the booked capacity, users must pay in favour of the TSOs, a bail for a quantity equal to 12 times the fixed term of the corresponding TPA tariff applied over 85% of the capacity booked by the user. This bail will be returned to the user one year after the beginning of the supply. SL-ATR  Web-based platform where shippers are able to book primary capacity. This platform only allows to book capacity in the Spanish system.

Obligations under existing contracts remain unchanged Application to available capacity only Market-based allocation mechanism (auction with a reserve price based on regulated TPA tariffs) Only short-term (less than or equal to one year) The corresponding entry and exit capacity available at both sides of the IP will be offered and allocated through a single allocation procedure. PROPOSED PRINCIPLES Virtual interconnection point between the two countries (at least for common available capacity) Coordinated secondary market arrangements in both systems, to be applied to capacity rights if acquired under the Pilot Model TO BE EXPLORED Pilot Model

Thank you for your attention!