Continental Crossings Peruvian Bridge Project Proposal Presented by: Avery Bang Team Members: Irund A-wan Jenna Kusmierek Tara Olds Ryan Wallace.

Slides:



Advertisements
Similar presentations
ENGINEERS WITHOUT BORDERS-USA PROGRAM QUALITY-RATINGS.
Advertisements

Calyxinfo Walking through Calyx Info The Organisation.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
DEVELOPING A TECHNOLOGY PROJECT IN STUDENT AFFAIRS A Guide to the Process Paul Schantz November, 2010.
1 Lincoln Footbridges Stewart Bewick -22 nd September 2014.
Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.
Meeting AECOM, AM SOP-T, CFR, JASPERS
THE TRANS-AFRICAN HIGHWAY NETWORK
February 19, 2015 Guelph, Ontario. 1. Advisory Committee on University-Industry Grants (ACUIG) 2. Review Process: Things to Focus On 3. Don’t do the Following.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
MBA (Trimester) Term V Module Title : Project Finance and Management
Kirk Starnes, Andy Lynch, Katie Anderson, Brad Jansen, Jon Larsen Team 13: All for Angkor.
Initiating and Planning Systems Development projects
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
Engineers Without Borders H&S Presentation
Capital Project Process
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
Project Management Requirements
Developing Guidance Notes for Safer School Construction Image:
Mobility Services for All Americans (MSAA) Yehuda Gross ITS Mid-West State Chapter February 7, 2006.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Establishing a Humanitarian Response Depot Global Partnership for Emergency Preparedness Project & HRD Feasibility Assessment Overview.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Civic Engagement Putting “Community” Back Into Community Colleges.
Electrical and Computer Engineering Senior Design John Peeples, Ph. D., P.E. Professor and Department Head.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Bob Travica MIS 2000 Class 12 Group Processes and Group Support Systems Updated Feb
EWB-USA Principles of Development. Our Mission EWB-USA supports community-driven development programs worldwide by collaborating with local partners to.
1-2 Training of Process Facilitators 3-1. Training of Process Facilitators 1- Provide an overview of the role and skills of a Communities That Care Process.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
Evacuation Safety Planners * Progress Report. Introduction: Objectives for this project were arrived upon through correspondence with the City of San.
Introduction to Engineering Camera Lab #4 – 3 Task #2 Agenda Review Task #2 procedure Conduct Task #2 Work on lab report.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Quality Involvement for Equality Project to foster stakeholder engagement in the European development education sector.
EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING THE POTHOLES – PAVING THE WAY TBWG, Niagara Falls October 24, 2006 EBTC WORKSHOP ON BORDER PROJECTS: AVOIDING.
Industrial Partnerships in BME Design 2007 BME idea Meeting Jay R. Goldberg, PhD, PE Marquette University Mary Beth Privitera, M. Design University of.
The database of demonstration and trail projects in sustainable energy and transport in Scandinavia Per Dannemand Andersen, DTU Management Engineering.
Technical Track Work Group Report Out August 22, 2012.
First Meeting Dec 6, 2006 – AM Washington, DC TASK FORCE INSTITUTIONAL LEARNING (IL)
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Rehabilitation Design for the Bridge for the Bridge Colorado Drive Construction scheduled for 2017.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Project Proposal Doucument Project Title 2015 APEC e-Learning Training Program Name of Presenter Date, 2015.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
MGT 437 Week 3 Learning Team Project Planning Technical Paper To purchase this material click below link
E.g. Bhurj Khalifa Tower Hotel, Abu Dhabi
Design Quality (30%) - 6slides
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
The ARC Process for New Program Proposals
Design Quality (30%) - 6slides Explain your key concept? (2slides)
Where We Are OVERVIEW Lesson 1: Course Overview
Contemporary Issues in Engineering
Design Quality (30%) - 6slides
Project Information Management Jiwei Ma
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
GPSC Website and Urban Dashboard
Proposal Kane County Sustainability Plan
Rural Partnerships between Small Farmers and Private Sector
North Augusta High School – Phase 2A and 2B
DEVELOPER NAME Introductions: Team members?
NIST TE Challenge Phase II
Improve Your Odds A Grant Writing Workshop
White Flint North Entrance Feasibility Study
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Continental Crossings Peruvian Bridge Project Proposal Presented by: Avery Bang Team Members: Irund A-wan Jenna Kusmierek Tara Olds Ryan Wallace

Team Members Project Manager: Avery Bang Design Engineers: Irund A-Wan Jenna Kusmierek Tara Olds Ryan Wallace

Project Site Google Earth image of South AmericaGoogle Earth image at Eye Altitude of 15 km Bridge location

Project Introduction Location: Yavina, Peru Current Crossing Unsafe Enable School Access

Project Site

Design Objectives Design Standardized Footbridge Structural Members Abutments Connections Bridge Approach Site Layout Satisfy International Design Codes Select Only Local Materials Construction Schedule

Design Challenges Topography Flood Plain Elevation Restrictions Data Collection Accuracy Approval of Design Feasibility of Construction Funding

Project Design Tasks Hydraulic Consideration Structural Abutments Connections Construction Phasing

Importance Factors 1.Constructability 2.Site Constraints 3. Materials 4. Cultural Aspects 5. Sustainability 6. Engineering Effort

Timeline

Project Budget

Bridges to Prosperity: USA Organization Site Selection Developing World Design Experience Shoemaker & Haaland: Local Engineers P.E. Consultants Technical Expertise CADEP: Peruvian Organization Arrange Local Labor Facilitate Material transport to site Partners

Management Plan

Summary Need for Bridge Safety Concerns Technical Design Knowledge Design Challenges Location Construction Process and Collaborations International Various Partnerships Project Completion

Questions?