1 EILS Technical Workshop 2.0 February 16, 2010. 2 Agenda  Introduction  June – September 2010 Procurement Schedule  EILS Submission Form  Review.

Slides:



Advertisements
Similar presentations
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
8 th Annual Managers’ and Law Enforcement Seminar IFTA Funds Netting Information.
SIS – Simplified Interline Settlement Financial Processes San Diego, ACH Annual Meeting 2011 Gianna Monsch, aerwise.
REPORTING REQUIREMENTS FOR SCHOOL CHOICE PROGRAMS Presenters: Jean Ammel, Deputy Executive Director Independent Education and Parental Choice and Kim Ward,
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
September 5, 2015 Office Setup. Lesson Overview: Office Setup  In this lesson we will cover:  Adding new offices to COM  Individual office setup 
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
ERCOT Emergency Interruptible Load Service EILS Technical Workshop Commissioners Hearing Room, PUC July 17, 2009.
ISDA ® 2009 ISDA CREDIT DERIVATIVES DETERMINATIONS COMMITTEES AND AUCTION SETTLEMENT CDS PROTOCOL International Swaps and Derivatives Association, Inc.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
EILS Update DSWG ERCOT Staff October 9, EILS Update to DSWGOctober 9, 2009 Contents Procurement results: Current & historical Price comparison:
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
Distributed Renewable Generation Profile Implementation Plan.
Distributed Generation Registration June 30, 2008.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Update to RMS June 3, Project(PR) 010_03 SCR756 Part B High Level Timeline  Planning Phase - complete  Execution/Development - complete  Testing.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
1 Market Trials Update NATF January 5, 2010.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Load Resource Participation in EILS EILS Subgroup October 27, 2011.
-- Presentation from PWG -- Profile ID Assignment and Annual Review Process November 17, 2005.
UFLS Survey Explanation
Market Trials Update NATF March 2,
Introduction to the Change Process
TAC Report to the ERCOT Board
Current FRRS Language & Explanation of Posted Data
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Settlement Timeline Workshop
Emergency Response Service Baselines
ERS Document Changes Associated with New SAS Implementation
Overview of the FEPAC Accreditation Process
Texas Student Data System
Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This.
Presentation transcript:

1 EILS Technical Workshop 2.0 February 16, 2010

2 Agenda  Introduction  June – September 2010 Procurement Schedule  EILS Submission Form  Review of Meter Data Submittal Requirements and Formats  Reinstatement Procedures for Suspended Loads  Substitution Procedures  Unavailability Procedures  Testing Procedures  Q & A

3 June – September 2010 Procurement Schedule

4 EILS Submission Form Feb – May 2010 Procurement  Incorporated changes based on feedback during the Oct 2009 – Jan 2010 procurement cycle  One form for all phases of EILS  Format streamlined – “R” tabs  More flexibility for Alternate Baseline Resources  Pre-populated workbooks provided by ERCOT  Use of “All_Alt” tab  Qualify individual loads for the Alternate Baseline  Allow them to be mixed and matched into Resources  ERCOT provided composite “All_Alt” tab – all loads submitted and okayed in RIDs (R-tabs and All_Alt tabs)  Same generic RID Number assigned to all submissions  R-tab with Alternate Baseline Selected  Analyze Default and Analyze Alternate fields ignored during RID process  Unique RID Number assigned if okayed  No load changes allowed if submitted as a Bid  Any combination of ‘Yes’ and ‘No’ allowed for Analyze Alternate fields when bidding  ERCOT worked with QSEs to correct and re-process most RIDs rather than rely on exchange  Greatly reduced volume of errors – easier for both QSEs and ERCOT!  Discussion of any issues related to the form and/or RID-Bid Process?

5 EILS Submission Form  Form Changes Being Implemented --- MINOR!  Applicable for remainder of Feb – May 2010 Contract Period  Reinstatements  Substitutions  Preliminary Baseline Reviews  Applicable for Jun – Sep 2010 Procurement Process  Added cell with drop-down list on Identification Tab to code purpose for submission  Renaming “All_Alt” tab to “Alt” tab … to avoid confusion with “All_Alt” and “All Alt”  Purpose and usage remain the same  Addition of an Address Field for each load  To help track loads over their participation in EILS  Applicable to loads in both competitive and NOIE areas  To facilitate tracking loads with multiple sites e.g. chain stores  Distinct street address and city required … blank or incomplete addresses will be treated as errors  Flexible Tab Names  Identification Tab – no change – must be included  Alt Tab – revised name (see bullet above) may be deleted or just left blank during RID process  Resource Tabs (formerly R-tabs) – free-form names allowed  ERCOT will provide Pre-populated forms with Resource Names used as tab names  ERCOT will return okayed RID forms with Resource Names used as tab names  Note: Excel limitations on  tab name length (30)  Characters not allowed: & : | ? ? * [ ]  Eliminated Tab Count cell on Identification Tab

6 EILS Submission Form  Open Form and Discuss Changes  Note: posted form will only be usable for  Preliminary Baseline Reviews  New RIDs for Procurement  Reinstatement RIDs  Substitution Pre-Qualification RIDs  Questions / Comments on Changes?

7 Meter Data Submittal  Three sources of interval data for EILS  Registered TDSP in competitive area  NOIE TDSP  QSE installed metering

8 Meter Data Submittal  Data from a Registered TDSP  NOIE Settlement Metering Points included  Normally interval data will be pulled from ERCOT’s Settlement System and used for EILS analysis  QSE premise level metering will be ignored if TDSP interval data is available  When a new TDSP IDR meter has been installed at a premise  Interval data may be available to the TDSP but not in ERCOT’s Settlement System  QSE should make arrangements with the TDSP to have load data submitted to ERCOT do not wait until the end of the contract period  Submission outside the TX Set process (before IDR profile change takes effect)  Data must be in a prescribed format  No affidavit required from TDSP  Missing data will be treated as zero for availability, automatic failure for event/test performance

9 Meter Data Submittal - continued  Data from a NOIE TDSP  QSE responsible for arrangements with NOIE TDSP to have load data submitted to ERCOT  Monthly submission in a prescribed format required  Data from QSE-Installed Metering  Premise level data from a NIDR load or sub-metering data from either an IDR or NIDR load  Accuracy consistent with PUC Substantive Rules and ERCOT Protocols  Affidavit from P.E. required  ERCOT will validate against IDR or NIDR data in Settlement System  If sub-metering a premise within a NOIE area, QSE must make arrangements with the NOIE to have premise level billing data (IDR/NIDR) sent to ERCOT for validation purposes  Monthly data submission in a prescribed format required 35 days after last day of calendar month  Missing/invalid data will be treated as zero for availability, automatic failure for event/test performance

10 Meter Data Submittal - continued  Important Interval Data Submission Deadlines  March 7 – data for the October-January Contract Period  April 4 – data for month of February  May 5 – data for month of March  June 4 – data for month of April  July 5 – data for month of May

11 Meter Data Submittal - Formats  Currently Supported  One day row formats  ERCOT Standard Format  MV-90 Lotus Format  Column Format  Others formats:.LS and.LSE  Documentation and Examples at link below: at%20Descriptions.doc  All formats must treat DST properly  Spring day 92 intervals  Fall day 100 intervals  New formats can be accommodated … contact ERCOT to discuss  Questions/Issues with meter data formats

12 Reinstatement Procedures for Suspended Loads Reinstatement Calendar Posted at

13 Reinstatement Procedures for Suspended Loads Resource submitted for reinstatement does not have to match the suspended resource identically –May exclude one or more loads and include other loads If Resource passes the load-shed test –Eligible to bid in the upcoming Contract Period RID submission not required –No load-shed test for 365 days –No changes allowed to load configuration after Reinstatement Bid –MW capacity ≤ amount on Reinstatement Bid –Minimum base load ≥ amount on Reinstatement Bid –Load, MW Capacity and Minimum Base Load changes allowed in subsequent procurement cycles If Resource fails the load-shed test –Ineligible to bid in the upcoming Contract Period –Ineligibility continues until a test is passed Questions Regarding Reinstatement

14 Substitution Procedures  ERCOT may limit the number of substitutions for a resource during a contract period  Substitution must be pre-qualified  Registered and qualified LAAR  Previously qualified EILS resource which has passed a test in last 365 days  Reinstated resource – no load changes allowed  Loads from a currently obligated resource (resource augmentation)  Substitution limited to that specific resource  Resource composed of loads from one or more previously obligated resources and/or new loads with no previous EILS participation  No pre-qualification test required if at least 80% of the load in the resource from resources which have passed a test in last 365 days  Otherwise passing a pre-qualification test required

15 Substitution Procedures - continued Pre-qualification Process  QSE must submit EILS Resource Submission form to ERCOT as a Pre- Qualification RID  ERCOT responds with baseline assignment options and test status (required or not required for pre-qualification) and capacity pre- screening information  QSE submits EILS Resource Submission form to ERCOT as a Pre- Qualification Bid  Baseline selection, MW capacity and minimum base load  ERCOT administers test if needed and reports results to QSE

16 Substitution Procedures - continued Substitution Process  QSE notifies ERCOT via of substitution  Identify resource being replaced and substitute resource to be used  Begin date and estimated end date for period of substitution  Substitution is for complete calendar days only  May be for one or more time periods  Substitution may begin no earlier than hour ending 01:00 of the next calendar day following ERCOT receipt of notification  Attached EILS Resource Submission form as Substitution Bid  MW capacity same as resource being replaced  Minimum base load ≥ pre-qualification bid MBL  Substituted and replaced resources must have same baseline type  Alternate to alternate  Default to default, but default type (Regression, Mid 8 of 10, MDP) does not have to match  Appendix A due to ERCOT within 3 days of notification

17 Substitution Procedures - continued  Periods of unavailability may be submitted for a substitution  During the substitution period, availability status of the substituting resource overrides status of the replaced resource  2% limit on allowed unavailability with 5 business day notice applies to the combined availability status  For alternate baseline resources, the average load excluding the minimum base load for a time period limited to 150% of the original capacity MW  If the availability factor for one or more time periods during the contract period is less than 95%, all loads in the original and substitute resources are subject to being treated as having failed to perform  In a deployment event, the resource obligated at that time is subject to deployment requirements  Substitution resources may be subject to unannounced load-shed tests  Warning: For default baseline resources, time is of the essence for a substitution to be useful  If load in 5% or more of the obligated intervals is below Capacity MW + MBL, before the substitution takes effect, the resource will fail regardless of the substitution

18  No changes to unavailability procedures  Revised form has been posted … reduced size  Form should be submitted regardless of whether a substitution has or will occur Unavailability Procedures

19 Testing Procedures  No changes to testing procedures  QSEs are reminded to submit meter data as soon as possible following a test  Resources with missing data for a test will be treated as having failed the test

20 EILS Technical Workshop 2.0 Questions???