09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring.

Slides:



Advertisements
Similar presentations
Frequency Scanning Interferometry (FSI) measurements
Advertisements

Stephen Gibson, ATLAS Offline Alignment, 2 nd July Incorporating FSI with the Offline Alignment Overview ATLAS Group, University of Oxford Stephen.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
AMULET Advanced Metrology Using LasEr Tracers John Dale.
The LiCAS FSI Subsystem Current Status and Initial Measurements John Dale for the LiCAS Collaboration IOP HEP April 2008.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
The Linear Collider Alignment and Survey (LiCAS) Project Richard Bingham*, Edward Botcherby*, Paul Coe*, Grzegorz Grzelak*, Ankush Mitra*, Johannes Prenting.
LiCAS Project: FSI Overview Richard Bingham, Edward Botcherby, Paul Coe, John Green, Grzegorz Grzelak, Ankush Mitra, John Nixon, Armin Reichold University.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
MONALISA David Urner, Armin Reichold, Paul Coe, Matthew Warden, Geoff Rayner Monitoring Alignment and Stabilisation with high Accuracy (Previously known.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
H. SCHMICKLER Alignment challenges for a future linear collider.
MONALISA LiCAS D.Urner +, A. Reichold +, G. Grzelak* P. Coe +, C. Uribe-Estrada +, Y. Han + M. Warden +, J. Dale +, G. Moss + P. Brockill +, S. Cohen +,
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
1 StaFF Progress Report David Urner University of Oxford.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
MONALISA: The precision of absolute distance interferometry measurements Matthew Warden, Paul Coe, David Urner, Armin Reichold Photon 08, Edinburgh.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
MONALISA Update David Urner ATF2 Meeting Dec
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
WP3 Frequency Scanning Interferometry Analysis Techniques for the LiCAS RTRS John Dale.
Continuous Frequency Scanning Interferometry
David Urner Oxford University/JAI
Summary FD Support System
Vibration issues at Linear Colliders:
on behalf of the CLIC active pre-alignment team
Topics on Vibration Issues
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
AMULET Advanced Metrology Using LasEr Tracers (and various other bits)
IP configuration session
David Urner, Armin Reichold , Paul Coe, Matthew Warden, Geoff Rayner
Presentation transcript:

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 2 / 26 The Oxford MONALISA Group David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus Interferometer experience at Oxford –built up since mid 1990s Interferometer based alignment is "coming of age" –Key results imminent from 3 interferometer groups –IWAA 08 presentations

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 3 / 26 Interferometers: Best of old & new In 2008 we have –laser sources –fibre amplifiers –fibre coupling Enabling –radiation tolerance –cost effective –scaleable –rapid read out High precision in fundamental physics since 1887

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 4 / 26 Why 2008 is so exciting for us MONALISA enjoying fruitful collaboration in Oxford: –LiCAS Prototype rapid survey system (tests in DESY) –ATLAS: SCT optical alignment being completed at CERN The whole is greater than the sum of the parts

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 5 / 26 Beam based feedback Is essential for ILC, CLIC Requires an operational beam –prerequisite initial alignment –components move after survey Working alignment needs to be maintained / restored –between trains 200 ms is long enough for several 100 nm movement –after push-pull events: IR hall floor will move after rolling two heavy detectors –after shutdown periods

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 6 / 26 Component Alignment Challenge relative mechanical DoF between many neighbouring components –choose important rotations / displacements in-situ –hostile radiation environment –cramped spaces ILC, CLIC require large dynamic range (sub) nm precision over range of metres micron precision over many 10s of metres

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 7 / 26 MONALISA: Benefits 1 Monitoring fiducial locations on key components after interruption of beam – independently follows changes in alignment during commissioning / start up –improves understanding of machine behaviour before accelerator operation –speeds up initial convergence of machine

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 8 / 26 MONALISA: Benefits 2 Return detector / QDzero position after push-pull expect to get micron repeatability –for return of magnet positions get machine within beam based capture range –improves switchover time more reliable accelerator operation –lower chance of damage –luminosity can only win

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 9 / 26 MONALISA : Requirements The ideal for any survey/monitor system –measure distances along clear lines of sight –use evacuated narrow tubes MDI issues for detector LoI –issues broadly as discussed here at SENDAI in Tuesday MDI session –e.g. push pull vacuum connections

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 10 / 26 Personal comments to add to Sendai meeting MDI discussion QD zero in tunnel scenario very exciting –MONALISA (as other systems) much simpler / cheaper much easier to achieve target performance –Personal plea to consider it favourably –IMHO: Achievable luminosity probably greater with simpler ILC

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 11 / 26 MONALISA illustration Returning to buried QDzero scenario following sequence shows an ILC study –simulated example geometry –compact straightness monitor (CSM) concept arises from necessity

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 12 / 26 Geometry Measure movement of QD0s with respect to some points radially outwards through detector field yoke Then must measure the relative motion of these end points Exact geometry to be determined in synch with detector design Final Vertically Focussing Quadrupole Solenoid return yoke Distance Meter Straightness Monitor Detail for single QDzero

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 13 / 26 Geometry Measure movement of QD0s with respect to some points radially outwards through detector field yoke Then must measure the relative motion of these end points Exact geometry to be determined in synch with detector design Final Vertically Focussing Quadrupole Solenoid return yoke Straightness monitor concept

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 14 / 26 Geometry Extension into tunnels possible. Allows monitoring of other magnets positions with respect to QD0 Final Vertically Focussing Quadrupole Solenoid return yoke

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 15 / 26 Measurement lines We measure distances along measurement lines using two techniques: Absolute distance interferometry Displacement interferometry Each line is the same, and is capable of performing both types of measurement. Absolute distance Displacement

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 16 / 26 FSI: Frequency scanning Interferometry

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 17 / 26 Interferometer operation Intensity

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 18 / 26 Interferometer operation Phase = 2π (Optical Path Distance) / Wavelength Φ = 2π D / λ = 2π D (ν / c) D = (c/ 2π) (ΔΦ/Δnu) R = (c/ 2π) (Δθ/Δnu) D = R (ΔΦ/Δθ) ΔD = (c/2π ν) ΔΦ Fixed Frequency Interferometry Frequency Scanning Interferometry

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 19 / 26 FSI: recent results in air MHz raw signal  =750nm  =70nm Add box to reduce air turbulence Distance RMS < 1  m

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 20 / 26 FFI: recent results in air Following displacements 5 nm RMS Four fibres' raw signal Displacement Static resolution estimate MHz raw signal

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 21 / 26 Up coming work at Oxford Have vacuum vessel ready for testing interferometers down to below 1 mbar Frequency stabilised ultra-narrow linewidth laser will improve reliability of FFI displacement measurements

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 22 / 26 Vacuum Vessel (0.1-1mbar) Equipped with 4 x 8 way fibre AFTER BEFORE 800mm LID NOT SHOWN HERE!

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 23 / 26 Rb-87 frequency reference (FFI) Target ~3 khz linewidth Need 19 kHz for 10m Almost all equipment has been ordered or purchased : setting up from March on

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 24 / 26 ATF2 extraction line: 08 Feb 2008 QD0 QD1

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 25 / 26 ATF2 beam direction QD0 Shintake table ATF2: Monitor relative vertical motion

09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 26 / 26 Summary MONALISA will be a boon to ILC –QDzero nanometre vertical alignment –Repositioning after push-pull to microns Needs to be included in MDI engineering and detector layout –push to get MONALISA concepts into detector –greatly encouraged by creative thinking at TILC08 Performance demonstrations on going –Oxford: Vacuum and frequency reference systems –ATF2: Final focus monitoring system to be installed