UPDATE ON ID INTEGRATION Alice TB, 18.06.03 E.Rosso ALICE TECHNICAL BOARD CERN, 18.06.2003 Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
1 Installation of Delphi Frame  ITS Installation.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Introduction Mapper machine Mapper software - Simulation - Corrections - Fitting.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Installation Review March ‘03 L.Simonetti – INFN Torino 1 ITS - FWD - beam pipe installation  Elements considered ITS (=SPD+SDD+SSD), FWD (=V0 R, T0 R,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Compressor status AWAKE Technical Board meeting 19 August 2015.
FWD DETECTORS ALICE FORWARD DETECTORS workshop. AGENDA Tuesday, March 11th, 2003 at R Introduction and main deadlines, Jens.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
Central vacuum valve in ALICE Pros and Cons ALICE TC –
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
DCal-ALICE integration and installation plan and status A. Tauro.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group.
Removing the VTPC from the VERTEX magnets
Status of the forward tracker design
Tracking detectors/2 F.Riggi.
Status of the PANDA Magnet mechanics (yoke & cryostat)
STRAW TRACKER SYSTEM CAD STATUS :
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
TEST MODULE WG Cradles for CLIC module supporting system
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Installation step 4. (3 days)
TAS at IP1 Present situation and plans
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
WG4 – Progress report R. Santoro and A. Tauro.
Test box for ProtoDUNE SP – Integration Test
IKON 15 Talal Osman & Iain Sutton
Presentation transcript:

UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3. TPC & ITS rails

UPDATE ON ID INTEGRATION Alice TB, E.Rosso 3 rd Cone (RB26)

UPDATE ON ID INTEGRATION Alice TB, E.Rosso 3 rd Cone Sharing of responsibility ALICE (NBI team) will take the responsibility of the mechanical design of the 3 rd Cone, which should be approved by the VP team. The VP team will take care of the construction drawings and the fabrication of all elements between the VP and the adjustable beam pipe support (including). ALICE will give formal approval to all the construction drawings provided by the VP team. ALICE will take care of the construction drawings and the fabrication of the 3 rd cone. The VP team will give formal approval to all the construction drawings provided by ALICE.

UPDATE ON ID INTEGRATION Alice TB, E.Rosso, G. Schneider 3 rd Cone

UPDATE ON ID INTEGRATION Alice TB, E.Rosso, G. Schneider 3 rd Cone

UPDATE ON ID INTEGRATION Alice TB, E.Rosso 3 rd Cone Mechanical accuracy As pointed out by the Technical Coordinator, during the last Comprehensive Review, one of the reviewers insisted on the need to understand the mechanical accuracy of this cone in positioning the Si detectors. The FMD team is studying the problem and, in the near future, will provide the information about the spatial accuracy needed to match the expected performances of the Si detectors.

UPDATE ON ID INTEGRATION Alice TB, E.Rosso V0_L and Si_3 support (RB24)

UPDATE ON ID INTEGRATION Alice TB, E.Rosso V0_L and Si_3 support Responsibilities IPNL is considering the possibility to provide the design of the V0_L and Si_3 support, to be made out of C-fibre composite material. The decision should be taken by July 2003.

UPDATE ON ID INTEGRATION Alice TB, E.Rosso, T. Meyer TPC & ITS rails TPC

UPDATE ON ID INTEGRATION Alice TB, E.Rosso, F. Tosello, L. Simonetti TPC & ITS rails ITS

UPDATE ON ID INTEGRATION Alice TB, E.Rosso TPC & ITS rails Present situation The TPC slides tightly along only one of its two rails (mounted inside the Space Frame). The second allows the movement without constraint. ITS and VP slide tightly along only one of their two rails each of which is supported in six points: on RB26 side they are fixed to the muon absorber, on the RB24 to the assembly infrastructure and in between they slide through four supports bolted to the TPC. The second allows the movement without constraint. When moving the TPC inside the space frame, in case of misalignment between the rail guiding the TPC and the rail guiding ITS and VP, a stress would be applied to the system. Due to the tolerances in fabrication and positioning and the gravitational deformations of the various elements of the system, the local misalignment between TPC and ITS rails can reach a few millimeters in x and y.

UPDATE ON ID INTEGRATION Alice TB, E.Rosso TPC & ITS rails Conclusion In the present design, the TPC ITS system is statically over constraint; this would apply dangerous stress to detectors and vacuum pipe during the installation and make impossible to reinstall the ITS rails, once removed, in view of extracting detectors and/or vacuum pipe for maintenance.

UPDATE ON ID INTEGRATION Alice TB, E.Rosso TPC & ITS rails Actions foreseen In order to avoid constraint to the system in y due to the misalignment between the TPC and ITS rails during the TPC movement, L. Simonetti will study the possibility to leave a vertical play of ≥ 3 mm in the four supports of each of the ITS rails bolted to the TPC. In order to avoid constraint to the system in x due to the misalignment between the TPC and ITS rails during the TPC movement, D. Perini will study the possibility to reduce and/or compensate down to <±1 mm the cumulated fabrication and positioning error in x of the TPC rails mounted in the space frame.