PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Chubaka Producciones Presenta :.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
Low Emittance RF Gun Developments for PAL-XFEL
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Compressor status AWAKE Technical Board meeting 19 August 2015.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SBS Magnet and Infrastructure Status Robin Wines July 2015.
CTF3-CLEX meeting June 12, 2006page 1 choice of architecture : 1 photo-injector 3 LIL sections: 1 for compression and 2 for acceleration 1 beamline with.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Cs 2 Te Photocathodes for CTF3 Photoinjectors R. LOSITO - CERN 4/10/2006.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
FP7: EuCARD after a year of preparation… A.Jeremie.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Cu,Mg Photoinjectors & LAL projects.
Results of short module and qualification strategy
Phil Oxford , june 18 Photoinjector at.
CBETA Technical Review
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
CSP 25th November 2010 Technical agreement number 3: overview
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Complementary ISTC Projects #3888, 3889p
by P. Musumeci and F.Tazzioli
Target and Horn status report
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Injector Performance Requirements Conventional Facilities Update
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
LCLS Injector: Introduction D. H
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
Advanced Research Electron Accelerator Laboratory
McDonald’s calendar 2007.
Cooler e-source Magnetized Beam LDRD Progress Report
Tropical cyclones movement
February 2007 Note: Source:.
MONTHS OF THE YEAR January February April March June May July August
Two-beam Test-stand Design and Construction Status
Teleconference ACS – FREIA 19th June 2017
McDonald’s calendar 2007.
Overview of RF Gun Specifications and Technical Issues
One Coil Gun Magnet February 2, 2016.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns 2. Status of the construction of the NEPAL beamline

PHIN 1.Status of the construction of the CTF3 photo-injector Modification of the technical drawings of the gun upon a CERN request due to the insertion of photo-cathode transfer chamber (August)  All the cooling channels in the gun had to be re-designed  Makes difficult to support the gun Finalization of the technical drawings of the NEG envelop around the gun Strong collaboration with CERN is mandatory since the NEG coating is done there => drawings almost finished

PHIN 1.Status of the construction of the CTF3 photo-injector Modification of the magnetic design: 2 coils instead of 3 No enough space for pumping with 3 coils With a laser gaussian pulse Solenoids ordered in June, one was modified in September taking into account the data of the CERN cooling system => Should be delivered by the end of this month

PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand Ionic pump Bucking coil Focusing coil Wave guide right RF gun output

PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand Modification from the initial drawing 1 Reduction of the cathode chamber 2 Migration of cooling pipes to the end of the gun

PHIN 1.Status of the construction of the CTF3 photo-injector Construction of a cold model to valid RF simulations History: Ordered in March a test piece to check : -iris profile -roughness -mechanical accuracy Test cavity received in April Iris profile not satisfying, another item O.K. Several tries later, order in beginning of June, foreseen delay: 8 W Last piece received in November 4 th (the firm begins (we suspect) the work only in October) - Checking at LAL: general accuracy: 5  m, roughness: < 0,4  mRa, iris profile O.K. Set up of the RF measurement apparatus begun the 14 th Duration: 2 months but we hope to order the final gun before the end of the year

PHIN 1.Status of the construction of the CTF3 photo-injector Coupling aperture (before opening)

PHIN 1.Status of the construction of the CTF3 photo-injector First half cavity with the hole for the photo-cathode Central cavity Last cavity with coupling holes Cooling channels

PHIN 1.Status of the construction of the CTF3 photo-injector Holes for NEG pumping

PHIN 2. Status of the construction of the NEPAL beam line Laser : Ordered in July Expected at LAL in the end of this year Preparation chamber : In progress in the LAL workshop Beam-line : A possible design exist A lot of drawing elements are readies The final studies are in expectation (lack of manpower)

PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand Short term program 1.RF measurements on the cold model final dimensions of cells and coupling holes 2. Ordered in December the two RF guns with a reserve on the final inner dimensions 3. NEG deposition Test of compatibility of SS/NEG (CERN specialists request) in the beginning of 06 3.First laser tests end of this year