High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.

Slides:



Advertisements
Similar presentations
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Advertisements

Water Rates History since 2001 Cost per 2-month billing period, not adjusted for inflation 2012 and 2013 rates are probable, not yet adopted.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
MQXF considerations MDT section 11/04/2012. Summary Revised planning Development Personnel Production: strategy and personnel Cost Planning issues not.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
CCM Resources 1. Project Cost Overview (1) Boards 1&5 (spares) [completed/to be done] – Eng. time to recover layout files. – Designer time for minor layout.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
CCM Resources 1. Project Cost Overview Boards 3&4 (production boards-130 each type ) – Eng. changes and designer layout work – Done – Tech time to place.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Why we should consider keeping Linac2 as a spare 1 M. Vretenar Linac4 BCC,
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Transport need for SPS external dump to the new dump cavern area LIU-SPS external beam dump JL GRENARD EN-HE
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Anders Monsted ST/CV document number: Oil in the reject water from SPS No Precautions to avoid oil pollution.  Avoid pollution with existing.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
LIU-SPS RF Power upgrade | 09 December 2015.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
Transport and Handling Manpower Planning S. Prodon – LEAF
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LIU-ABT systems: SPS, W. Weterings M.J. Barnes, L. Ducimetière, N. Magnin, W. Weterings Acknowledgements: A Adraktas, M. Beck, G. Bellotto, S. Bouleghlimat,
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
Vacuum System P. Chiggiato TE-VSC
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Assembly of Crab Cavities couplers in SM18 clean room
Brief Status SPS Prototype PSB Prototype Installed in LS1
AD Horn upgrade HV generators
AD consolidation activities in LS2
AWAKE proposals for BE/BI
Production and commissioning of the 2nd BGC
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
4th FRC meeting, Antti Onnela, CERN-PH-DT
ELENA electron cooler and SEM grids status
LIU and TE/ABT/PPE activities
LIU Wire Scanner Series Costs
Budget, Schedule, Contingency
AB-RF-FB section meeting
HIE-ISOLDE contribution packages
Michele Martino – Jean-Paul Burnet
Presentation transcript:

High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting (indico event )

HOMS models 460 MHz628 MHz 938 MHz 25 November 2015LIU-SPS Coordination meeting - indico event

TWC 200 MHz & HOMS Picture taken in 2001 No information on HOMS positions Map will be performed during next YETS 25 November 2015LIU-SPS Coordination meeting - indico event

11 slots per section In average 1 slot for vacuum per section In 2015 : 18 sections in SPS + 3 spare sections After LS2 : 20 sections in SPS + 1 spare section Total : 210 possible slots Currently 80 slots equipped 130 slots free 25 November 2015LIU-SPS Coordination meeting - indico event

Feedthrough 80 in SPS + 29 spares 2 leaky ceramics following LS1 All are > 35 years old Will probably all be leaky in the coming years ! Should rebuild 250 ! Estimated cost 1500 CHF / unit Total cost = 375 kCHF FTE = 3 months for 3D, 2D & Assembly 25 November 2015LIU-SPS Coordination meeting - indico event

Antennas 80 in SPS + 3 x 10 spares (model unknown, tests during YETS) Only few spares of each (<10) Should rebuild 240 = 3 x 80 ? (to be defined by Elena) Estimated cost 150 CHF / unit Total cost = 40 kCHF FTE = 1 months for 3D, 2D & Assembly 25 November 2015LIU-SPS Coordination meeting - indico event

460 MHz & 628 MHz filters 50 in SPS + 18 spares To be re-designed (optimization ?) Estimated cost 2000 CHF / unit Quantity to be defined For 160 new = 320 kCHF FTE = 2.5 months for 3D, 2D & Assembly 25 November 2015LIU-SPS Coordination meeting - indico event

938 MHz filter 30 in SPS + 5 spares To be re-designed (optimization ?) Could be compatible with 460 MHz & 638 MHz Not currently the case Estimated cost 1500 CHF / unit Quantity to be defined For 80 new = 120 kCHF FTE = 1.5 months for 3D, 2D & Assembly 25 November 2015LIU-SPS Coordination meeting - indico event

Schedule, Cost & Manpower 250 x Feedthroughs New filter design 240 x Antennas 240 x Filters 375 kCHF & 0.25 FTE (0.05 Staff FSU) 40 kCHF & 0.10 FTE (0.05 Staff FSU) 440 kCHF & 0.40 FTE (0.2 Staff FSU) Installation 0.25 FTE (0.10 Staff FSU) 1.5 FTE (Fellow or Doct Student or ?) Total Cost : 850 kCHF 1.5 FTE for new design 1.0 FTE for construction, tests, assembly & installation (0.4 Staff FSU) 25 November 2015LIU-SPS Coordination meeting - indico event