1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
15 th September 2013 Enagás and TIGF Information to NRAs.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
32 nd IG meeting 15 th July 2015 Enagás, GRTgaz, REN and TIGF.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
European Developments Transmission Workgroup 1 st December 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
European Developments Transmission Workgroup 3 rd May 2012.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
29th November 2016 Teleconference
20th SG Meeting South Gas Regional Initiative
21st IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
26th February 2015 Teleconference
41st IG meeting 24th January 2017
37th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
41st IG meeting 24th January 2017
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
39th IG meeting 4th October 2016
South Gas Retional Initiative
39th IG meeting 4th October 2016
Presentation transcript:

1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

2 Agenda

3 II.1. Results of the last auctions (for information by TSOs) II. CAM NC

4 II.2. TSOs proposal of common methodology to maximize technical capacity (for information by TSOs) II. CAM NC

5 II.2. Capacity calculation and maximisation at interconnections NRAs reaction: II. CAM NC 1. NRAs welcome the TSOs studies on capacity calculation and maximization Interconnection Points (ENAGAS & TIGF) (ENAGAS & REN), to comply with the CAM NC (EU): Article 6.1 of Regulation (EU) nº 984/2013, of 14 th October 2013, states that: “(a) In order to maximise the offer of bundled capacity through the optimization of the technical capacity transmission system operators shall take the following measures at interconnection points, […], the transmission system operators shall establish and apply a joint method, setting out the specific steps to be taken by the respective transmission system operators to achieve the required optimization. 2. However, the studies:  Give little information about hydraulic simulations.  According to the text, capacities could be completed with a dynamic approach; i.e. giving information about additional capacities in spring and summer, interruptible capacities to be offered, etc.  They can be improved giving information about additional capacities and probabilities associated.

6 II.3. Bundling capacity at the IPs: Update (for information by TSOs) II. CAM NC

7 II.4. Status of TSO’s IT systems for adaptation to daily auctions by 1 st November 2015 (for information by TSOs) II. CAM NC

8 (for information by TSOs) III. CMP: Common methodology of OSBB for the Region

9 III. CMP: last development of OSBB proposal NRAs reaction to OSBB proposal NRAs welcome the proposal evaluating it positively, as a first step in the right direction to comply with European and national rules. NRAs appreciates the TSO efforts and recognize the proposal as a good starting point to implement OSBB in a coordinated way. NRAs ask TSOs when it would be possible to implement the Proposal. The implementation date should be adapted to the application of daily auctions: November SGRI will send the Proposal to SGRI Stakeholders Group for public consultation. NRAs and TSOs must set up deadlines for completing the process asap

10 (for information by NRAs) IV. Balancing NC implementation in the three countries

11 IV. Balancing NC implementation in the three countries FRANCE The “Trading region South”, a single market zone including GRTgaz South zone and TIGF, was implemented from 1 April The balancing network code will be fully implemented in France in October 2015, consistently with CRE deliberation of 15 January 2015: ng-rules-grtgaz-tigf ng-rules-grtgaz-tigf

12 IV. Balancing NC implementation in the three countries SPAIN In September 2014, GTS (the Technical System Manager, the agent in charge of the balancing) and Enagas –following article 52 - sent a justified request to the CNMC asking for an extension of the period to implement the code – by 1 October In October 2014, CNMC accepted the request. The answer was also sent to European Commission and ACER. The CNMC proposal of “Circular” to regulate the gas balancing was submitted to Public Consultation until 23 March The Circular has been reviewed taking into account the responses received. It is expected to be approved by the CNMC Plenary by the end of July.

13 IV. Balancing NC implementation in the three countries PORTUGAL In February 2015, ERSE received from REN Gasodutos (TSO) – following article 52 – a justified request asking for an extension of the period to implement the code – by 1 October In April 2015, ERSE accepted the request. The answer was also sent to European Commission and ACER. estruturas/Documents/BAL%20Decis%C3%A3o%20ERSE%20Prorroga%C3%A7%C3%A3o%20Prazo.pdf Since April 2015 ERSE has promoting working meetings with TSO, DSO and suppliers to discuss the framework to implement balancing NC. The public consultations to approve the new framework regarding Balancing NC, are foreseen for the 2 nd semester 2015.

14 (for information by NRAs) V. Interoperability NC. Latest developments and next steps in the Region

15 Interoperability NC. Latest developments and next steps in the Region Regulation (EU) 2015/703 of 30 April 2015 establishes a network code on interoperability and data exchange rules. According to article 5 ENTSOG published a template to evaluate the draft interconnection agreement covering the default terms and conditions set out in articles 6 to 10. ENTSOG has published the draft template. The objective of the ENTSOG template is to set out the default terms and conditions that TSOs must conclude when they fail to agree on one or more rules established in the code. By 31st August, NRAs can provide an opinion to ACER on the compliance of the template with national laws.

16 Interoperability NC. Latest developments and next steps in the Region Next steps NRAs to guarantee the compliance of the template with national laws. NRAs and TSOs in cooperation will supervise the transparency of the current interconnection agreements at the IPs in the Region. In particular: Rules for flow control Measurement principles for gas quality and quantity Rules for the matching process Rules for the allocation of gas quantities Communication procedures in case of exceptional events. By 1st November 2015, according to the SGRI WP it need to be done: Definition of specific actions and measures to be taken in coordination with NRAs, TSOs and stakeholders, on the harmonisation of Gas year / Gas day / Nomination and renomination procedures / Data exchange

17 (for information by TSOs) VI. Infrastructures VI.1. Candidate projects of common interests in the Region

18 (for information by NRAs) VI. Infrastructures VI.2. Preliminary assessment of the candidate PCIs 1.GR_25_WEST: ES-PT 2.GR_21_a_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais 3.GR_21_c_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais+Obergailbach 4.GR_21_e_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais+Obergailbach+Fos 5.GR_21_b_WEST – Spain non-hosting country - Fos+Eridan+Arc Lyonnais 6.GR_21_d_WEST – Spain non-hosting country - Obergailbach+Fos+Eridan+Arc Lyonnais 7.GR_22_WEST – Spain non-hosting country - Artere Gascogne-Midi+Val de Saone+Gascogne-Midi PCIs candidates in the SGRI

19 VI. Infrastructures VI.2. Preliminary assessment of the candidate PCIs Project promoters/TSOs sent to NRAs the Project Specific - CBA results following the ENTSOG methodology. Every NRA gave the preliminary assessment to ACER as “hosting” or “non hosting country”, stating if any objection existed for a project candidate to be included in the PCI list. EC required TSOs to send CBA results to NRAs interested in receiving the information (non hosting country). NRAs have given the assessment to ACER, on 18 June 2015, on the online survey. One coordinated answer for a candidate PCI or PCI group was submitted. Next Regional Group meeting is still not scheduled.

20 Next meetings: Sep IG? VII. AOB and next meetings