EGEE-II INFSO-RI-031688 Enabling Grids for E-sciencE www.eu-egee.org End-to-End Service Level Agreement Provisioning and Monitoring for End-to-End QoS.

Slides:



Advertisements
Similar presentations
Grid Initiatives for e-Science virtual communities in Europe and Latin America WP5 - Network Resource Provision STATUS REPORT Gilberto.
Advertisements

Nicolas Simar – DANTE : Premium IP and LBE transparency on GEANT QoS on GÉANT Premium IP and Less than Best Effort.
Connect. Communicate. Collaborate NTUA/GRNET Interdomain SLAs Enforcement Framework in Real QoS-Enabled Networks C. Marinos, A. Polyrakis, V. Pouli, M.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Network in EGEE Building end-to-end network.
MAGGIE NIIT- SLAC On Going Projects Measurement & Analysis of Global Grid & Internet End to end performance.
EHealth Network Monitoring Network Tool Presentation J. Gaston Senior Network Design Seminar Professor Morteza Anvari 10 December 2004.
Connect. Communicate. Collaborate The Technological Landscape of GÉANT2 Roberto Sabatino, DANTE
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Toby Rodwell, Network Engineer, DANTE TNLC, 28.
GEANT Performance Monitoring Infrastructure – Joint Techs meeting July Nicolas Simar GEANT’s Performance Monitoring.
GN2 Performance Monitoring & Management : AA Needs – Nicolas Simar - 2 nd AA Workshop Nov 2003 Malaga, Spain GN2 Performance Monitoring & Management.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE II - Network Service Level Agreement (SLA) Establishment EGEE’07 Mary Grammatikou.
Prof. N. P. Pathak - Dept. of I.T.1 Unit 4 Inventory Management Process OSS Essentials by Kornel Terplan.
TeraPaths TeraPaths: establishing end-to-end QoS paths - the user perspective Presented by Presented by Dimitrios Katramatos, BNL Dimitrios Katramatos,
INFSO-RI Enabling Grids for E-sciencE Federated Network Performance Monitoring for the Grid K. Kavoussanakis, EPCC, The University.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis, EPCC, The University of Edinburgh J-P. Gautier,
Performance Monitoring - Internet2 Member Meeting -- Nicolas Simar Performance Monitoring Internet2 Member Meeting, Indianapolis.
Comparison of NREN Service Level Agreements Life Cycle and Portfolio Management Workshop Terena, 23/11/05 Ann Harding HEAnet Network Operations Manager.
QoS on GÉANT - Aristote Seminar -- Nicolas Simar QoS on GÉANT Aristote Seminar, Paris (France), Nicolas Simar,
Applicazione del paradigma Diffserv per il controllo della QoS in reti IP: aspetti teorici e sperimentali Stefano Salsano Università di Roma “La Sapienza”
Connect. Communicate. Collaborate Implementing Multi-Domain Monitoring Services for European Research Networks Szymon Trocha, PSNC A. Hanemann, L. Kudarimoti,
INFSO-RI Enabling Grids for E-sciencE GRID sites connectivity database design Anthony Teslyuk, RRC KI JRA4, SA2 Meeting 4 th EGEE.
QoS monitoring -- Nicolas Simar Monitoring Infrastructure SEQUIN workshop, Amsterdam, 1 February 2002 Nicolas Simar DANTE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Kelsey RAL/STFC,
EGEE-III INFSO-RI Enabling Grids for E-sciencE Monitoring and enforcement of Service Level Agreements John Shade EGEE-II / EGEE.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
Nicolas Simar – DANTE - Sequin: Monitoring Infrastructure Monitoring Premium IP.
Practical Distributed Authorization for GARA Andy Adamson and Olga Kornievskaia Center for Information Technology Integration University of Michigan, USA.
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
Enabling Grids for E-sciencE GRIDCC testing EGEE II’ SLA framework through GEANT infrastructure Mary Grammatikou –
INFSO-RI Enabling Grids for E-sciencE Service Provision Architecture TNLC Meeting ― Athens, Mathieu Goutelle (SA2, CNRS.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Network activity overall Xavier.
Jeremy Nowell EPCC, University of Edinburgh A Standards Based Alarms Service for Monitoring Federated Networks.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Etienne Dublé - CNRS/UREC EGEE SA2 Xavier.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Vassiliki Pouli
Enabling Grids for E-sciencE EGEE-II Meeting EGEE-II SA2 activity Tziouvaras Chrysostomos, MSc NTUA, 14 th March 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update on Network Performance Monitoring.
SLA/SLS Fundamental concepts SLAs/SLSs are the essential mechanisms for agreeing, configuring, delivering, guaranteeing and evaluating the obtained QoS.
Connect. Communicate. Collaborate GEANT2 Monitoring Services Emma Apted, DANTE Operations EGEE III, Budapest, 3 rd October 2007.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC - Status and plans Guillaume Cessieux.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
INFSO-RI Enabling Grids for E-sciencE Institution of SLAs TNLC Meeting ― Athens, Afrodite Sevasti (SA2, GRNET)
Connect. Communicate. Collaborate GN2 Activities and the LOBSTER Project Nicolas Simar, DANTE TNC 2005, Poznan, June 2005.
Thoughts on TEIN2 Operation and Collaboration Xing Li
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
Charaka Palansuriya EPCC, The University of Edinburgh An Alarms Service for Federated Networks Charaka.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1 & SA2-ENOC Interactions status and plans.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operations WS: Introduction & Objectives.
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
David Foster, CERN GDB Meeting April 2008 GDB Meeting April 2008 LHCOPN Status and Plans A lot more detail at:
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
Connect communicate collaborate perfSONAR MDM News Domenico Vicinanza DANTE (UK)
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST GN2 SA3 End to End Quality of Service Toby Rodwell DANTE First EGEE Conference,
Automated provisioning of Ethernet OAM in CarrierEthernet networks: the case of GRNET Leonidas Poulopoulos Michalis Mamalis Stauros.
1 Network related topics Bartosz Belter, Wojbor Bogacki, Marcin Garstka, Maciej Głowiak, Radosław Krzywania, Roman Łapacz FABRIC meeting Poznań, 25 September.
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
QoS Experience on European Backbone - TNC Nicolas Simar QoS Experience on European Backbone TNC 2003, Zabgreb (Croatia),
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Marian Garcia, Operations Manager, DANTE LHC Meeting,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
LHCOPN operational handbook Documenting processes & procedures Presented by Guillaume Cessieux (CNRS/IN2P3-CC) on behalf of CERN & EGEE-SA2 LHCOPN meeting,
INFSO-RI Enabling Grids for E-sciencE TNC 2005 Networking activities in EGEE Mathieu Goutelle (CNRS UREC, France) EGEE-SA2 activity.
LHC T0/T1 networking meeting
SLR, SLS and SLA issues Afrodite Sevasti SA2 participant
Networking support (SA2) tasks for EGI
“Detective”: Integrating NDT and E2E piPEs
Presentation transcript:

EGEE-II INFSO-RI Enabling Grids for E-sciencE End-to-End Service Level Agreement Provisioning and Monitoring for End-to-End QoS TNC2007, May 2007 Vassiliki Pouli (GRNET/NTUA)

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Outline Introduction SLA parts Model of SLA establishment Monitoring of SLAs Questions

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Introduction (1) Grid applications require specific level of QoS for data transfers across different Resource Centres (RCs) end-to-end (e2e) SLA is needed to define this level of QoS –provides the technical and administrative details to perform  Maintenance  Monitoring  Troubleshooting

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Introduction (2) Grid RCs: users of the network Network providers –GÉANT (paneuropean network) –NRENs (national networks) –Regional/metropolitan/campus networks Synthesis of e2e SLA based on individual domain SLAs

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May SLA parts ALO (Administrative Level Object) –Contacts –Duration (start and end times) –Availability of service –Response times –Fault handling procedures SLO (Service Level Object) –Service flow description –Excess traffic treatment –Performance guarantees (OWD, jitter, packet loss, capacity…) –Reliability guarantees: max downtime (MDT), time to repair (TTR) –Monitoring infrastructure

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Trusted 3 rd party - ENOC Multi-domain SLA Need for a trusted 3 rd party responsible for: –SLA service installation –SLA management/monitoring –User support for network issues  network SLA violations For EGEE ►►► ENOC (EGEE Network Operation Centre) –Counterpart of a NREN NOC for EGEE –In charge of “EGEE network” operations

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Model of SLA establishment(1/2) Preliminary agreement 1.ENOC asks from every participating domain and RC to formulate an agreement 2.Each domain NOC provides –the ALO (Administrative Level Object) –max bandwidth allocated for EGEE Each RC –provides administrative and technical details –signs Acceptable Use Policy (AUP)  Provisioned network resources used only for EGEE purposes 3.ENOC stores the received information to the NOD (Network Operational Database) Preliminary agreement Preliminary agreement of ENOC with participating domains & RCs made once for every participating domain & RC

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Model of SLA establishment (2/2) 2-Stage provisioning model: SR-SA 2-Stage Provisioning Model: SR-SA Stage 1: Service Reservation (SR) – b2b SLA –PIP (Premium IP) reservation in extended QoS network (GEANT/NRENs) –border-to-border SLA (GEANT/NRENs SLAs) Stage 2: Service Activation (SA) – e2e SLA –Activation of the service ↔ Configuration of the routers in the last mile network –end-to-end SLA (b2b SLA + NREN client domains’ SLAs)

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Rationale of 2 stage provisioning model Grid applications require e2e path be available in time Lead time between service request and service reservation of the extended QoS network –Manual configuration of the routers –Currently 2 working days in the GEANT network

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Service Reservation – b2b SLA Case 1: automatic reservation –Reservation via AMPS servers of hosting NRENs and GEANT –AMPS (Advanced Multi-domain Provisioning System) :  System In development stage by the GEANT project  Management of the whole PIP provisioning process from user request through to the configuration of the appropriate network elements Case 2: manual reservation –No AMPS servers (or similar services) installed

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Stage 1: Service Reservation (SR)-b2b SLA case 1: automatic reservation Reservation through AMPS or similar service ENOC identifies involved GEANT/NREN domains GEANT/NRENs provide individual SLAs Synthesis of b2b SLA: performed by ENOC based on reported GEANT/NRENs SLAs

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Stage 1: Service Reservation (SR)-b2b SLA case 2: manual reservation Cases with no AMPS servers or similar services installed in NRENs GEANT/ NRENs

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Stage 1: Service Reservation (SR)-b2b SLA case 2: manual reservation No AMPS servers installed ENOC identifies involved GEANT/NREN domains ENOC initiates manual requests to individual domain NOCs NOCs reply by and provide individual SLAs Synthesis of b2b SLA: performed by ENOC based on reported domain SLAs

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Stage 2: Service Activation (SA)-e2e SLA ENOC verifies that the reservation in the extended QoS domain is still effective and retrieves it Checks if NREN client domains (MAN/campus/institution) can support the request NREN client domains provide their SLAs ENOC produces e2e SLA based on: –reported NREN client domains’ SLAs –b2b SLA from stage 1

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Monitoring of SLAs ENOC queries NPM DT (Network Performance Monitoring Diagnostic Tool) NPM DT provides measurement data from perfSONAR (GEANT/NRENs) and e2emonit (RC-to-RC) monitoring frameworks Fault Identification/Notification –Case 1: ENOC identifies & notifies responsible domain –Case 2: ENOC (not able to isolate the problem) informs GEANT PERT (Performance Enhancement Response Team) Reaction-Repair according to SLAs ENOC checks SLA compliance

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May SLA monitoring requirements e2e Metrics: –OWD (One Way Delay) –IPDV (IP Packet Delay Variation) –RTT (Round Trip Time) –Packet Loss –Available bandwidth –Achievable bandwidth –TTR (Time To Repair) From trouble ticket issue to recovery, per violation –MDT (Maximum DownTime) Maximum total TTRs for all violations in a given period Performance metrics Reliability metrics

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May –Frequent e2e and partial domain monitoring of performance metrics (e.g. every 15’) in agreed service availability period –Capability of setting thresholds on metrics to generate violation alarms  Different severity levels (?) –Trouble tickets, triggered by users and ENOC operators on alarms, managed via TTM (Trouble Ticket Manager) –Statistics from trouble tickets to infer MDT & TTR Monitoring features

Enabling Grids for E-sciencE EGEE-II INFSO-RI TNC2007, May Questions ?