Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
ESS Front End diagnostic
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LHC Wire Scanner Calibration
ICE SECTION The coolest place to be! Elias Métral
Beam instrumentation MDs
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Experience with beam instrumentation at Linac4
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
LIU Wire Scanner Milestones June 2017
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Space charge studies at the SPS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Beam dynamics requirements after LS2
Another Immortal Fill….
Measurement of the beam (transverse) emittances
Presentation transcript:

Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of October 2015

Introduction Well adapted beam instrumentation is a key element for the assessment and delivery of the requested LIU/HL-LHC beams. This presentation will point out discrepancies between the wish list per machine and what is foreseen within the LIU and consolidation projects. Ongoing work that seems to be under control will not be mentioned.  My apologies already at this point that it is not possible with this presentation to give adequate credit for the huge work effort within BI and other involved equipment groups and services!

Instrumentation for Linac 3 Direct transverse emittance meter after accelerating tanks missing Reconsider quad scans in ITH/ETL lines; requires manpower and time investment for studies and application (fellow or technical student?) Study might lead to new specifications for profile monitors Lacking precise beam current measurements to fine-tune transmission; new request for Faraday Cup in ITF line; ABP preparing specifications Resolution of LBS not sufficient for ions (energy spread measurement needed after debuncher to set up long. parameters in stand-alone mode) Study of new spectrometer line has been stopped Miss pickups in transfer lines; ABP to provide specifications and BI to investigate feasibility of installing pickups in ITH and ETL lines Increase resolution for the SEM grid in ITL and/or ITM; layout change requests being finalised by ABP Remark: These are new requests resulting from the last analysis of the Linac 3 performance. To be evaluated.

Instrumentation for LEIR Transverse Schottky measurement to be made operational: need BI support (new solution for ELENA will be implemented) and software. To be installed during IPM: Work ongoing to transform ‘expert’ transverse profile measurements to routine operational measurements

Instrumentation for PSB Beam instrumentation needs well covered by LIU plus consolidation. Main concern: Will the instruments fulfill the specifications?  For most of the novel injection instrumentation (H 0 /H - current monitor, stripping foil current monitor, diamond BLM etc.) the Half-Sector-Test should be able to answer this question  Turn-by-turn orbit measurement system: 3 pickups with new electronics to be evaluated before the end of the year to confirm system exchange during EYETS  Flat BLMs to be evaluated for the ring; hopefully cabling (and thus installation) can be implemented during the EYETS  New Fast Wire Scanner: One prototype is planned to be installed during the EYETS Tune pickup (1 per ring) has to be upgraded for low-intensity beams (in particular needed during commissioning of Linac 4 beam after connection); very recent request being looked into by BE-BI and EN-MME (EYETS tight, but possible).

Instrumentation for PS Complete set of instrumentation will be available if all instruments will be compliant with the specifications (new slow&fast BLMs, new injection devices, new injection profile monitors plus already existing devices). Beam Gas Ionisation (BGI) monitor based on pixel readout for horizontal plane to be installed during June TS 2016 (eventually without the magnet). New instrument! Signal should be sufficient for beam profile, but maybe not for the few-turn average bunch-by-bunch. Gas injection foreseen, but not compatible with ion operation (will therefore not be installed) Detector for vertical plane might come only after EYETS (tbc) Comparison with wire scanner for absolute emittance values, but absolute values are anyway not needed for emittance blow-up monitoring Fast Wire Scanner: Would be important to evaluate prior to LS2, needs to be confirmed if installation during YETS 2017/18 possible (priority given to PSB due to more stringent space restrictions) Some remaining inconsistencies/open issues with measurements/calibration; still differences between 10/15 m/s wire movement speed or between IN and OUT scans for current wire scanners Bunch-by-bunch measurement will only be available with fixed 40 MHz clock, but would need different frequencies for valid characterisation before extraction

Instrumentation for SPS (1) No solution for reliable bunch-by-bunch transverse beam measurement at flat top for 288 LIU bunches (important e.g. for electron cloud)! No full transverse qualification of LHC beams possible before LHC injection. Wire Scanners: Evaluation of installed wire scanner prototype; review locations (+vertical and horizontal measurement in parallel; final list of scanners being discussed); install diamond detectors in // to PMs; optical fibres to replace long cables. BUT: won’t solve problem of max. intensity at flat top BSRT to be made operational only for measurement at flat top (FESA class, calibration etc.); bunch-by-bunch with gating possible (not enough time for all bunches). Should change location (very high hor. dispersion), electronics redesigned and software to be written, installation of parallel system (slit + intensified PM) would be very nice… BGI: Would be very interesting to have it working! Multiple measurements along the cycle possible. Open issues: Understand/solve radiation issues (camera), commissioning and integration (LSS5)

Instrumentation for SPS (2) BLMs: Faster BLMs at certain critical locations (turn-by-turn losses compared to 20 ms integration time; injection losses etc.); general upgrade only during LS3; specifications and locations to be agreed upon; critical locations for partial installation before LS3 to be defined Diamond BLMs for extraction losses, at scrapers (deduce qualitative transverse bunch-by-bunch information) and other dedicated positions for continuous loss measurement to be made operational  maybe profit from Fast BCT readout development BLMs requested by BE-OP for TT10; budget not assured. Remark: Specifications for each requested system or for modifications being prepared by OP for engineering checks.

Instrumentation for LHC (1) No solution for reliable bunch-by-bunch transverse beam measurement for the full beam and along the cycle! Wire Scanner (WS): For HL-LHC new wire scanners with max. 20 m/s will be installed  higher resolution, but will only yield an average emittance value. Intensity threshold increased by factor 20, but would need collimation to avoid quench. BSRT: Calibrated with low-intensity WS measurement; large correction factors due to diffraction. Sequential scan over filled bunches takes long (~5 b/s;  plan to install new cameras and R/O system to achieve almost 100 b/s), measuring on ramp below 2 TeV impossible, but currently only bunch-by-bunch measurement device for full beam, including at flat top; R&D of interferometer at FT to overcome resolution limitations BGV: Currently only on beam2 and half of the detector; LHC-b readout electronics to be commissioned this year; bunch-by-bunch measurement within minutes possible, also during ramp; depending on admissible gas pressure BGI: Only used for ions; issues with lifetime of camera

Instrumentation for LHC (2) Tails: With WS only for a few bunches at injection; halo monitors planned for HL-LHC (prototype of coronograph (BSRT blinding out core of bunch) maybe installed next year; gas jet monitor or other solutions to be evaluated) Maybe some of these options could also be applied for measurements at SPS top energy, but certainly won’t be available for LS2. Better pickup resolution needed for HL-LHC around collimators (alignment) and insertion regions (precise beta-star control)  new electronics (DOROS; orbit and turn-by-turn). Need to combine with consolidation specifications and MD needs (e.g. for bunch-by-bunch position measurement) Pickup calibration reproducibility of ~1% needed for HL-LHC in the IRs (challenging beta* control); discussions started to define actions Bunch-by-bunch tune measurements: some improvement potential Data logging for bunch-by-bunch data might become an issue (e.g. head-tail, instability monitor and damper)

Tools: Automatic Beam Quality Checks MachineTransverseLongitudinal Linac3/4, LEIR, PSB-- PS- Few last turns will be logged and can be analysed offline in case of need (but not enough time between bunch rotation and extraction to reject beam) SPS Orbit at flat top drifting over days – should constant monitoring tool be put in place? Beam Quality Monitor (BQM) satisfactory SPS OP is working on SPS-QC, an extensive quality control program that should check during injection e.g. steering, phase, energy error, bunch length, transmission etc.; similar approach also for extraction LHC BQM upgraded and satisfactory Automatic quality checks with IQC at injection (trajectories, losses, phase errors, filling scheme correspondence etc.); punctual manual checks with WS (144b) + continuous BSRT scans Observation box is being prepared for transverse damper based on turn-by- turn bunch position, and could also be used for longitudinal observations (select either one bunch over many turns or a few turns for certain bunches); very useful for MDs and instability studies. Status report at LMC Oct. 14 th 2015.

Transverse Beam Quality Tracking along LHC Injector Chain Automatic beam quality monitor for the transverse plane not existing yet. Working group ‘Monitoring LHC beam quality from injectors’ has put in place additional information in the LHC supertable for the injectors to at least track the evolution of transverse emittances, bunch intensity and tail population Procedure in place in all injectors to manually initiate wire scanner measurements before each LHC fill Plot with brightness evolution for PSB, PS and SPS generated automatically (see next slide); other plots of interest will follow

Brightness Evolution Plot for LHC p Injectors Implementation of plots sorted by ‘beam types’ still to be done; will provide comparable brightness figures throughout all machine per LHC beam type. TO BE UPDATED….

Conclusions (1) BI team is putting a huge effort in providing adequate beam instrumentation for LIU/HL-LHC – no time to acknowledge adequately in this presentation. Some requests from Linac 3 not yet included in Upgrade/Consolidation. Other machines upstream of SPS well covered by upgrade/consolidation projects for beam instrumentation (performance checks outstanding). SPS+LHC: Bunch-by-bunch transverse measurements for full operational beams (including tails) is a clear concern. Wish to increase SPS BLM coverage. Under discussion. Specifications for new instruments, FESA classes or requested modifications not always available. Should be reviewed in the various LIU projects and by HL-LHC between the BI coordinators and BE- OP+BE-ABP.

Conclusions (2) With the ever-increasing performance of the beam instrumentation the request for and implementation of automatic quality checks will grow. Data logging might become an issue with the increased number of bunch-by-bunch measurements  need to include online data reduction mechanisms? Sometimes also OP manpower missing to provide more ‘fancy’ applications that are needed once new BI systems have shown to work and/or to explore the full power of certain beam instruments. Support/Consolidation for already existing instrumentation has to be kept high/assured, as it’s the basis for good beam operation, also for the phase after the upgrades.