On behalf on EN-EL October 1 st, 2015 YETS 2015-2016 Works EN-EL [ CF excluded ]

Slides:



Advertisements
Similar presentations
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
112/06/2012. Summary  Network infrastructure consolidation & upgrade 66 kV et 18 kV  UPS SILCON replacement project  Projects and maintenance work.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Electrical power distribution in experiments W.Iwanski.
M. Raymond – 08 January 2014 Summary of electrical activities foreseen on ATLAS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
Infrastructure activities planned on ATLAS during YETS 2015 Thanks to all the experts who contributed Bruno Saint Sulpice, Denis Dumas, Serge Deleval,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
TC meeting P2 planning wks 3&4 A.Tauro
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Injector De-cabling Project
the high-voltage network of CERN ToMORROW
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
the CERN Electrical network protection system
CV maintenance works during YETS
SPS activities during LS2 TE-EPC (Power Converter Group)
2016.
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
Power cut 18kV cable for EMD404/E9 is heating
F Duval, on behalf of EN/EL
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]

YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015 Concerning the whole CERN :  Annual test for the Safety networks 10’ power cut of « General Services » & « Safety » networks at 7:00 am in a working day  Auto-transfer test PS – Booster impacted only a week-end on the Meyrin site All other sites (SPS – LHC – 513 – MEY hors PS – Prevessin –ZN…) repowered without power cut on degraded configuration during the week-end Meyrin - LHC1 – LHC18 - BA6 – BA7 Safety network not available only Saturday in working hours ! EL IMPACTS for the YETS

On LHC (1/3) :  AUG tests 9 days, 1 day by site – Arcs affected 2 times  N/S Automatism on LHC5 Circuit breaker Replacement on safety switchboard ESD1/5E and normal switchboard EBD1/5E : Works during X-Mas break ? Prohibited access in underground LHC5 - PM56 and CMS PX15 and demi-arcs 5-6 & 4-5  Automatic transfer switch on CV pressurisation switchboard on LHC5 : Works during X-Mas break ? Prohibited access in underground LHC5 PX54_CMS.  USC55 : LV circuit breaker replacement for selectivity EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On LHC (2/3) :  Automatic transfer switch on CV pressurisation switchboard on LHC1 Works during X-Mas break ? Prohibited access in underground PX15_ATLAS  Circuit breaker/contactor replacement on ATLAS LV switchboard in UX15 EXD1/15X and EXD2/15X 2 x 2 days  EQD2/1H modification for the adjunction of a column for TE/CRG ATLAS Power cut of TE/CRG switchboard - 1 day (15-16 December proposed by TE/CRG)  Feeders modifications on ATLAS switchboard EOD8/15A – EXD2/1DX – EXD4/15A – EBD1/15A 1 day by switchboard EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On LHC (3/3) :  Test of redundancy feeders QPS LHC machine to eliminate non-compliances  Done on compliance logical blocking signals and 18 kV protections tests of the LHC loop points Opening of LHC 18kV loop, without power cut, in coordination with AUG tests  Done on compliance equipment on LV switchboard Limited LV power cuts  Maintenances 48V, transformers, UPS, and more spécifically UPS Cryo LHC  48V PLC revamping LHC1 – USA15 - SDX5 – USC55 – SE18 Without power cut  LHC18, Replacement of 5 I/O frames Supervision affected, without power cut EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On SPS (1/2) :  AUG tests 7 days on working days  Oil treatment for 400/18 kV transformer EHT2/BE Pulsed network  Replacement MN coil on WS-Net ORMAZABAL switchboard and supervision consolidation The day of the BA6 or LHC1 AUG test ?  Logipam update for BB6 18 kV protection relay and PLC update for WS-net 18 kV N/S automatism WS-SPS & WS-LHC power cuts, with AUG tests ? EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On SPS (2/2) :  Power cut of 18 kV circuit breaker EMD303/B3 for supervision update Pulsed network, RF power cur in BB3  Cabling and cable ways identification for BA’s SPS  Maintenance UPS, 48V, transformers…  48V PLC revamping BB4 –BA7 –BE9 Without power cut  BAF3 Preparation Disconnections, cables and ways dismantling Area creation for RF & CV EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On the North Area and the Prevessin site :  AUG tests 4 days – 1 day by site – Working days except for Prevessin  Obsolete 48V chargers replacement for BA82  N/S automatism replacement (PLC+HMI) for BB81 diesel generator No Safety network on EHN1-BA81-BA85 during 3 days  UPS maintenance in BE91 substation, for CCC CCC protected by the UPS redundancy in BE91  Maintenance UPS, 48V, transformers… EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On Meyrin (1/2) :  Replacement of 48V chargers for ME25-ME23-ME11-ME6-ME16-ME9  Installation of a new 48V system for ME50 & ME64  Update of logic protection for the 66kV incomer in ME59 18 kV reconfiguration on Meyrin site, without power cut  Extension of the 18 kV switchboard in ME50 Power cut of demineralised water production b.378 during 1 day – LHC Impact  Replacement MN coil on ORMAZABAL switchboard in ME13 & ME15 The day of the AUG test ?  Modification Auto-transfer 18 kV coupling circuit breaker EMD301*9 and update of the auto-transfer PLC in ME9 JURA No Auto-transfer during 3 days EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

On Meyrin (2/2) :  AUG tests 5 days … during week-ends !  Displacement of the EBD14*80 in b day power cut  Replacement of the LV switchboard in ME15 (if not finished before) Limited power cuts of General Services  48V PLC revamping ME6 – ME9 – ME11 –ME23 –ME43 Without power cut  Installation 18 kV circuits breakers in ME25 for b.245 POPS-B  Installation new LV switchboard and mechanicals supports for PSB area  Replacement AUG rack in ME62  Maintenance UPS, 48V, transformers … EL IMPACTS for the YETS YETS – Works EN-EL [CF excluded] On behalf on EN-EL October 1 st, 2015

Thank you for your attention !