Emerson Network Power Confidential LittlefieldLittlefield.

Slides:



Advertisements
Similar presentations
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Advertisements

Statistical Inventory control models I
Littlefield Technologies: Overview
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Chapter 5 Strategic Capacity Planning
Supply Decisions.
Chapter 14 Measuring and Assigning Costs for Income Statements
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
CHAPTER 6 INCREMENTAL ANALYSIS Study Objectives
Theory of Constraints Part II: TOC Concepts
Chapter 11, Part A Inventory Models: Deterministic Demand
SHORT-TERM FINANCIAL MANAGEMENT Chapter 4 – Inventory Management Prepared by Patty Robertson May not be used without permission.
Some Tactical Mistakes to look out for:. In Review: In all cases, when a Company makes a tactical blunder, at least two functional managers are responsible.
Accounting Information, Relevant Costs, and Decision Making
Relevant Costs for Decision Making. Identifying Relevant Costs Costs that can be eliminated (in whole or in part) by choosing one alternative over another.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Inventories: Measurement 8.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Practice; Follow the 5 Steps Process Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per.
SE 303 Lab Multi-Period Financial Models Production planning problem.
Profit Planning Chapter 9. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Planning and Control Planning -- involves developing objectives and.
Supply Chain Management
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
Using an Online Factory Simulator in OM Courses: Experiences in the CSU System Samuel C. Wood Responsive Learning Technologies CSU-POM 2005 Annual Meeting.
Chapter 6 Product Design & Process Selection-Manufacturing
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Traditional Cost Management Traditional Cost Management C H A P T E R 6.
Financial and Cost-Volume-Profit Models
Relevant Costs and Benefits
Managing Financial Resources FCS 387. The Purpose of Budgeting What is a budget? The organization’s business plan expressed in financial terms. Based.
Chapter 12 Inventory Models
Accounting Principles, Ninth Edition
Chapter 26 Part 1.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
CHAPTER 7 INVENTORY MANAGEMENT
T20.1 Chapter Outline Chapter 20 Credit and Inventory Management Chapter Organization 20.1Credit and Receivables 20.2Terms of the Sale 20.3Analyzing Credit.
Inventory Stock of items held to meet future demand
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Inventory Management MD707 Operations Management Professor Joy Field.
Absorption Cost Systems Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
UNDERSTANDING EBITDA & FREE CASH FLOW CORPORATE HUMAN RESOURCE
Contents Introduction Aggregate planning problem
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
@ 2012, Cengage Learning Differential Analysis, Product Pricing, and Activity-Based Costing LO 1c – Make or Buy Decisions and Replace Equipment Decisions.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
Absorption Cost Systems Chapter Nine McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
Part Two The Basic Principle of Cost Accounting. Argument and discussion How do the resources flow in a typical firm? What is the differences among expenditure,
Capacity Planning Pertemuan 04
1 Chapter 16 Relevant Costs and Benefits for Decision Making.
Introduction to OEE (Overall Equipment Effectiveness)
Profit Planning Chapter 9
Inventory Stock of items held to meet future demand
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
OPSM 301 Spring 2012 Class 13: Inventory Management
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Synchronous Manufacturing and Theory of Constraints
Synchronous Manufacturing
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Planning for Profit and Cost Control
Relevant Costs and Benefits for Decision Making
Decentralization and Performance Evaluation
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Inventory Stock of items held to meet future demand
Presentation transcript:

Emerson Network Power Confidential LittlefieldLittlefield

2 AgendaAgenda Scope of The Game Current State Process Order Rates

Emerson Network Power Confidential 3 ScopeScope maximizing revenue by in an Dish Manufacturing Factory optimizing by optimizing batching, raw material, and overcoming bottlenecks through either batching or investment in new equipment.

Emerson Network Power Confidential 4 Game Basics We are to adjust key parameters to optimize throughput and maximize profit Each Hour reflects an actual day of production –We can modify each hour if we want We assume plant responsibility for ordering, acceptance of orders, batch size, investment decisions We operate 7/24 We will start our management tenure on day 51 and operate for 266 days. The last 100 days will run based on the last settings This game will run for 9 days Elapsed time

Emerson Network Power Confidential 5 Current State Labor Cost is not a factor Our manufacturing Process if broken down into 4 distinct processes –Board Stuffing (let’s call it surface mount) –Initial Test –Tuning –Final Test Waiting Queue Size is not an Issue Initial Material Ordered was for 7,500 kits

Emerson Network Power Confidential 6 Board Stuffing Longest Single step in process regardless of batch size No Variability –HERBIE!!!! –A Surface Mount Machine Additional Machine costs $90,000 No Lead Time noted… –Scrap $ = $10,000K –Initial number of Machines 3

Emerson Network Power Confidential 7 Initial Test Short Cycle No Variability, until we get fully operational!!!!!! As it shares the same equipment as Step 4 Final Test –Additional Machine costs $80,000 No Lead Time noted… –Scrap $ = $10,000K –Initial number of Machines

Emerson Network Power Confidential 8 TuningTuning Can be incredibly short Variability Strikes!!!!!!!!!!!!! Equipment –Additional Machine costs $100,000 No Lead Time noted… –Scrap $ = $10,000K –Initial number of Machines

Emerson Network Power Confidential 9 Final Test Shortest Cycle No Variability, until we get fully operational!!!!!! –As it shares the resource with Initial Test Equipment –A Test Machine Additional Machine costs $80,000 No Lead Time noted… –Scrap $ = $100,000K –Initial number of Machines 1 Same Machine as Initial Test!!!!!!!!!!!!!!!!!!!!! 9.68

Emerson Network Power Confidential 10 Order Acceptance We can accept orders but each batch must be for multiples of 60 –If we receive and order for more than this, we do not have material or capacity, then it will not be accepted can not a Lead Times –Current Quoted as 7 Days When accepting Orders –We can accept them at one of three levels

Emerson Network Power Confidential 11 MaterialMaterial Initial on Hand Material –7,200 Units –Material Cost Per unit $10 –All Orders must be placed in Multiples of 60 –Lead time is 4 Days –Unsure of Initial Inventory when we start game Holding Period Costs –If not leveraged, 10% annualized

Emerson Network Power Confidential 12 InvestmentInvestment AT day 150, we can obtain financing –20% annual

Emerson Network Power Confidential 13 Day of Take Over The LT factory began production by investing most of its cash into capacity and inventory. Specifically, on day 0, the factory began operations with three stuffers, one tester, and one tuner, and a raw materials inventory of 7200 kits. This left the factory with zero cash on hand. Management is currently quoting 7-day lead times, but management would like to charge the higher prices that customers would pay for dramatically shorter lead times. In addition, because the factory is essentially bootstrapping itself financially, management is worriedabout running out of cash.

Emerson Network Power Confidential 14 Ordering Queue What is the Current Batch Size What should our contact price be after reviewing other data

Emerson Network Power Confidential 15 Materials Buffer Current Inventory Levels Reorder point And QTY to order

Emerson Network Power Confidential 16 Key Items to look at while we determine what our Bottlenecks and Variances for Future Investment Are our bottlenecks where we think they are?

Emerson Network Power Confidential 17 Work/Process Centers Most important short term, if we can’t buy any new machines is Testing Priority

Emerson Network Power Confidential 18 How are we doing? Should we alter the pricing? Are we confident?

Emerson Network Power Confidential 19 Action Plan Assess Current Position If things are not terrible would recommend batch sizes of 20 Leave Orders at 7 days for time being EOQ is hard to use as holding –2500 Kit at a time –$26K Cash Needed Prioritization of the new Assets