ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-

Slides:



Advertisements
Similar presentations
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Advertisements

Presenter: Kenny Haulk
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 201 Circuit Theory I1 ECE 201 Homework Guidelines Be neat and use Engineering Paper! Begin each problem on a new sheet Identify each problem –Problem.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
The reading is 7.38 mm. The reading is 7.72 mm.
ECE4006 Group 6 – Presentation 5
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Optical Gigabit Ethernet
Capstone Design Update
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Name _______________________ Date 8/22-9/2
Task List Group management plan Background studies
BETONLINEBETONLINE A·+A·+
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
*Winners = No homework for a week
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT- A85A30) Life is back in our Tx board - Solved problems and changed all components as stated last week (replaced Rmod, lowered VCSEL…) - Soldered new Tx board - Result: good open eyes (conn VCSEL) Thanks to group 1 for spec sheet on unconnectorized VCSEL, tips on alignment tolerance testing on Tx board, and loaning us a Rx board Need to trade unconn VCSEL for conn PD (if interested see us) Progress: Continue Working on alignment tolerance testing on Tx board Focus on the final paper Next Week:

XYZ-Test of Rx Board with PD PDT-A85A30 Three Positions of Open eyes Best eye10-dots eye Z up by 0.72mm

Units: x10 microns Alignment Tolerance Testing for Rx with Unconnectorized PD, S7911 and PDT-A85A30 (Mapping Figures) Unconnectorized PD S7911 Unconnectorized PD PDT-A85A30

ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November15-21, 2002) K28.5 PRBS7 Open eyes for Tx board

Alignment tolerance testing with Tx board

XYZ-Test of Rx Board with PD S7911 Capacitance= 0.45F Units: x10 microns

XYZ-Test of Rx Board with PD PDT-A85A30 Capacitance=1.2F Units: x10 microns