Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
The Proton Source (mostly Booster) in the “Collider Era” Eric Prebys February 3, 2003.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Proton Economics Eric Prebys FNAL Accelerator Division.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys

Proton Plan PMG 2/23/06 E Prebys 2 Agenda Operations Report/Technical Progress – Prebys Cost/Schedule Report – Sims Shutdown Preparations - Andrews

Proton Plan PMG 2/23/06 E Prebys 3 Operations Report

Proton Plan PMG 2/23/06 E Prebys 4 Operational Issues NuMI had a few minor problems and special runs MiniBooNE ran steadily Most effort was devoted to preparing for the shutdown.

Proton Plan PMG 2/23/06 E Prebys 5 NuMI FY06

Proton Plan PMG 2/23/06 E Prebys 6 MiniBooNE FY06

Proton Plan PMG 2/23/06 E Prebys 7 FY06 Total Booster Output

Proton Plan PMG 2/23/06 E Prebys 8 Technical Progress

Proton Plan PMG 2/23/06 E Prebys 9 Progress Technical Progress Linac  PA Vulnerability – Seven out of twelve new tubes (plus seven ordinary spares) ~On schedule  Quad Power Supplies First of eight cards prototyped and ready to go out for production.  LLRF Upgrade Task force has done characterization measurements on out test stand Planning series of measurements on operational stands over shutdown. Booster  Determine rep. rate limit No real progress because some key players concentrating on other things.  Orbump (+ 400 MeV line) – All six magnets done and tested Chosen three for use Mounted on girder Problems with strip line (more later) Will test next week On schedule (see Andrews’ talk)

Proton Plan PMG 2/23/06 E Prebys 10 Progress Booster  Correctors – Several coils potted and being tested. Laminations in, two cores stacked. Going out for bids on winding Electrical specs complete. Working on document.  /05 30 Hz/Gamma-t – Mini-review tomorrow –Abandon 30 Hz –Continue to work on gamma-t  Booster Dump Relocation Ready to rock  Booster RF/ Rep. rate Improvements Transformers failed corona test at factory Cez strongly believes the problem is the test, and is going to investigate. If he’s right, we’re on track for the shutdown. If he’s wrong, we probably won’t get it done.

Proton Plan PMG 2/23/06 E Prebys 11 Progress Main Injector  Large Aperture Quads – Ready to go for all seven  Collimation – Ready to go (see pictures)  NuMI MultiBatch Operations – Intensity pretty much where it’s going to be until we start slip stacking Still plan to do kicker mods over shutdown, but load testing is tight. –Worse case: complete plumbing over shutdown and install loads later (~2-3 days) Studies: full 11 batch slip stacking and acceleration to 120 at low intensity! Study Group  1.05 Draft submitted to director Hand-off being negototiated with SNuMI effort

Proton Plan PMG 2/23/06 E Prebys 12 ORBUMP/Girder Assembly All six magnets complete and tested Best combination chosen based on:  Net dipole moment (<1 mm total beam motion at injection)  Acceptable alternate for each of the three magnets in the case of failure Magnets on girder Miscellaneous hardwared being mounted Electrical test next week On schedule  See. Andrews’ talk for details

Proton Plan PMG 2/23/06 E Prebys 13 Stripline Woes Problem one:  Machined too much at connection point Problem two:  Caught by milling machine and destroyed New stripline being fabricated:  Not potted (insulated with kapton and fiberglass padding)  Similar to all other striplines in Booster  On schedule

Proton Plan PMG 2/23/06 E Prebys 14 MI-8 Collimator w/o marble (moving configuration) Fully clad

Proton Plan PMG 2/23/06 E Prebys 15 The future: Corrector Prototyping Coil on core with complete single lamination Coil with core detail