EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 EuCARD-2 WP5 “XBEAM”

Slides:



Advertisements
Similar presentations
Introduction to EuCARD2 & WP4: Applications of Accelerators AccApplic  EuCARD2  WP4: Applications of Accelerators  The applications  Current workshops.
Advertisements

CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 XBEAM Steering Meeting.
European Network for Novel Accelerators (EuroNNAc2): WP7
IPHE Goal Efficiently organize and coordinate multinational research, development and deployment programs that advance the transition to a global hydrogen.
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Communication, Dissemination & Outreach TIARA-PP final meeting, Daresbury, 2013, November 25th C. Tanguy (CEA) 1.Website 2.Documentation database 3.Accelerating.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement The editorial series.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Patrick Janot Physics Studies: Status on 31/08/15  Outline u The international context u The FCC-ee at Summer Conferences u The second year of the design.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP2 Past & Planned activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 Extreme Beams &
EXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5 Frank Zimmermann EuCARD-2 Kick-Off Meeting CERN13 June 2013 many thanks to Giuliano Franchetti,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
EuCARD is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, under Grant Agreement no Report.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement th EuCARD-2 SC Meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement LOW-ε-RING network:
Welcome! Rob Edgecock University of Huddersfield, UK  EuCARD2  WP4: Applications of Accelerators  This workshop  A few practical details EuCARD-2 is.
EuCARD-2 WP5 XBEAM & WP1 EuCAN Frank Zimmermann EuCARD-2 Steering Committee Meeting 19 March 2014 with kind input from Kurt Aulenbacher, Marica Biagini,
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Highlights and roadmap.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
LHeC Coordination Meeting, 9 June 2017
FCC-- ee coordination meeting 25 February 2016
Roadmap for ARIES APEC Frank Zimmermann, Giuliano Franchetti
eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5
European Network for Novel Accelerators (EuroNNAc2): WP7
Beam Dynamics meets Vacuum, Collimations, and Surfaces
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Beam Dynamics meets Diagnostics Firenze 4-5 November 2015
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Future Collider Projects at CERN
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Yasuhiro Okada, Executive Director, KEK
AMICI WP1 – Management, coordination and dissemination
EuCARD-2 WP5 XBEAM & WP1 EuCAN
TOP6 – WP4 Coordination and Management JPICH Coordination Office
High Energy High Intensity Hadron Beams
WP 1 Management and Coordination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Presentation transcript:

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM” Status G. Franchetti, F. Zimmermann Steering Committee Meeting Videoconference,

WP5 Workshops since May 2015 XLINAC mini-workshop "LLRF and Beam Dynamics Mutual Needs in Hadron Linacs," Lund, 1-2 June 2015LLRF and Beam Dynamics Mutual Needs in Hadron Linacs XPOL workshop “Search for the Electron EDM in an Electrostatic Storage Ring,” JGU Mainz, September 2015Search for the Electron EDM in an Electrostatic Storage Ring XCOLL LHeC Workshop, CERN & Chavannes-de-Bogis, June 2015LHeC Workshop XCOLL "Collimation Tracking Workshop," CERN, 30 October 2015Collimation Tracking Workshop XRING/XLINAC workshop "Beam Dynamics meets Diagnostics," Firenze, 4-6 November 2015Beam Dynamics meets Diagnostics

Milestones and Deliverables due up to M32 ( ) Report no. (D/M) TitleDue dateStatus MS33 2nd XCOLL topical workshop M24 (April 2015) achieved 28/04/2015 – ”Advanced Optics Control (AOC)”, CERN, February 2015 MS34 2nd XRING topical workshop M24 (April 2015) achieved 07/01/2015 – “Beam Dynamics meets Magnets 2014,” PSI, Dec MS35 2nd XLINAC topical workshop M24 (April 2015) achieved 08/07/2015 – “Mutual Needs of LLRF and Beam Dynamics”, Lund, June 2015 MS36 2nd XPOL topical workshop M24 (April 2015 ) achieved 12/11/2015 – “Search for the Electron EDM in an Electrostatic Storage Ring,” JGU Mainz, Sept. 2015

Milestones and Deliverables due up to M36 ( ) Report no. (D/M) TitleDue dateStatus / Plan MS373rd XCOLL topical workshop M36 (April 16) Report on collimation tracking workshop (?) or LHeC WS MS383rd XRING topical workshop M36 (April 16) Report on Firenze WS (draft exists) MS393rd XLINAC topical workshop M36 (April 16) Report on Firenze WS MS403rd XPOL topical workshop M36 (April 16) Report on 16 April Rome WS D5.1 Preliminary strategy for future hadron & lepton colliders M36 (April 16) to be written D5.2 Preliminary strategy for future high performance hadron rings M36 (April 16) to be written D5.3 Preliminary strategy for future high-power high-current SC linacs M36 (April 16) to be written D5.4 Preliminary strategy for future polarized beams M36 (April 16) to be written

communication / articles - 1 Scientific papers submitted relevant to the project AuthorTitleLink G. Franchetti et al.The Extreme Beams Initiative in EuCARD-2 IPAC15 Richmond IPAC2015/papers/mopje073.pdf M. Benedikt et al.FCC-hh Hadron Collider – Parameter Scenarios and Staging Options IPAC15 Richmond IPAC2015/papers/tupty062.pdf M. Benedikt et al.Combined Operation and Staging Scenarios for the FCC- ee Lepton Collider IPAC15 Richmond IPAC2015/papers/tupty061.pdf F. Zimmermann et al. Scenarios for Circular Gamma- Gamma Higgs Factories IPAC15 Richmond IPAC2015/papers/tupty057.pdf

communication / articles - 2 Scientific papers submitted relevant to the project AuthorTitleLink G. Franchetti, F. Schmidt Extending the Nonlinear- Beam-Dynamics Concept of 1D Fixed Points to 2D Fixed Lines Phys. Rev. Lett. 114, /PhysRevLett F. Zimmermann et al. Status and Challenges for FCC- ee CERN-ACC n=en M. Benedikt, F. Zimmermann Outline and Status of the FCC- ee Design Study ICFA Newsletter No. 67 CERN-ACC n=en F. Zimmermann et al. Beam Dynamics Challenges for FCC-ee ICFA Newsletter No. 67 CERN-ACC n=en

communication / articles - 3 Scientific papers submitted relevant to the project AuthorTitleLink M. Benedikt, F. Zimmermann Future Circular Colliders Proc. Varenna 2015 CERN-ACC M. Benedikt, D. Schulte, F. Zimmermann Optimizing integrated luminosity of future hadron colliders Phys. Rev. ST Accel. Beams 18, (2015) /PhysRevSTAB CERN-ACC M. Benedikt, F. Zimmermann Future Circular Colliders Proc. Lepton-Photon 2015 CERN-ACC

communication / talks Attended events (with EuCARD-2 presentation) Title of eventDateLocationNo. particip ants Link to event or report IPAC153-8 MayRichmond, USA ~1300https:// pac2015/index.php Future Research Infrastructures: Challenges and Opportunities 9-11 JulyVarenna, Italy 74https://agenda.infn.it/conferenceDi splay.py?confId=9137 EPS-HEP22-29 July 2015 Vienna, Austria ~1000http://xbeam.web.cern.ch/XBEAM/ literature/2015/EPS2015_Shiltsev_ v4.pdfhttp://xbeam.web.cern.ch/XBEAM/ literature/2015/EPS2015_Shiltsev_ v4.pdf ; ICABU November Gyeongju, Korea 234http://pal.postech.ac.kr/icabu2015 / AccApp’ November Washington, DC, USA ~200http://accapp15.org/

communication - upcoming events Upcoming events (workshops, meetings, etc.) Title of eventDateLocation#particip ants Link to event or report XCOLL FCC week AprilRome, Italu>300http://cern.ch/fcc w2016 XPOL WS: Polarization issues in future high energy circular colliders 16 AprilRome, Italy30-100?? (K. Aulenbacher) XLINAC HB JulyMalmö, Sweden200?hb2016.esss.se/ XCOLL/EuroNNACc “Focus:: Future Frontiers in Accelerator (F3iA)” 2016Germany20-30?? (R. Assmann, F. Zimmermann) XLINAC - Upgrading existing high power linacs Fall’16CERN50? (T. Ekelof, M. Eshraqi) EuCAN Universities meet Laboratories 2Fall ‘16Paris, France50-100? (A. Faus-Golfe, G. Franchetti, F.Z.) XBEAM StrategyJan/Feb ‘17Valencia, Spain~20? (A. F.-G., G.F. F.Z) XRING – beam dynamics and Vacuum/Materials Fall’16?60-80?

10 communication - news Potential topics/results for Accelerating News – Beam dynamics meets diagnostics, Firenze workshop – electron EDM ring, Mainz workshop – FCC collaboration progress/16-T coil demonstration at CERN – review new book of V. Shiltsev («Electron Lenses for Super-Colliders», Springer-Verlag 2015)

Program for next 6 months preparation of 2016 workshops formulating strategies – XCOLL - Preliminary strategy for future hadron & lepton colliders (D5.1 M36) – XRING - Preliminary strategy for future high performance hadron rings (D5.2 M36) – XLINAC - Preliminary strategy for future high-power high-current SC linacs (D5.3 M36) – XPOL - Preliminary strategy for future polarized beams (D5.4 M36)

Open issues articles and talks to be included/flagged in CDS need to advance with preparation of upcoming workshops