Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
EU Developments Transmission Workgroup 3rd November 2011.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group -140 Thoughts on additional information requirements.
European Developments Transmission Workgroup 1 st December 2011.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Transmission Workstream 6 January 2011
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Transmission Planning Code
Update on European Network Codes
Capacity Methodology Statements: Impact of Mod 452
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Transmission Workgroup 6th March 2014
Transmission Planning Code Review
Proposed Transitional Gas Exit Arrangements
EU Developments.
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Incremental Entry Capacity Release Methodology Statement
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup 5 January 2012 Exit Capacity Substitution: Alternative Definition of Substitutable Capacity for Interconnector Points.

2 Background  On 31 st March 2011 the Authority approved National Grid’s proposed Exit Capacity Substitution methodology statement.  Any unsold baseline capacity may be substituted from one NTS Exit Point to another to enable incremental capacity to be released without investment, (subject to a number of exclusion detailed in the statement).  The approval letter included a requirement to exclude exit capacity at Interconnectors from substitution for 2011, and to identify alternative proposals for defining Substitutable Capacity for these points that are consistent with developing European Regulations.  National Grid has identified a range of options to define “Substitutable Capacity” at interconnectors. Following discussions with Interconnector Operators, National Grid is seeking wider industry views before the inclusion of proposals within the next version of the methodology statement in 2012.

3 European Legislation  The exit capacity substitution methodology has been developed to be consistent with UK legislation and, in particular, the obligations placed on National Grid through its Licence. However, it must also be consistent with European legislation.  The key European obligations for National Grid are found in:  Directive 2009/73/EC dated 13 July 2009 concerning common rules for the internal market in natural gas; and  Article 13 sets out an objective that TSOs shall build sufficient cross-border capacity to integrate European transmission infrastructure accommodating all economically reasonable and technically feasible demands for capacity and taking into account security of gas supply.  Article 40 sets out general objectives for the Authority, including promotion of the development of cross-border transmission capacities to meet demand and enhance the integration of national markets.  Regulation (EC) No 715/2009 dated 13 July 2009 on conditions for access to the natural gas transmission networks.  Article 16 requires that the maximum capacity at all relevant points shall be made available to market participants, taking into account system integrity and efficient network operation.  ACER Framework Guidelines FG-2001-G-001 dated 3 August 2011 on capacity allocation mechanisms:  Sets out how capacity will be offered for sale, including an obligation to bundle available capacity. ENTSO-G will issue the CAM NWC consistent with this in March  Further proposals have been developed for substitution at Interconnectors to ensure consistency with these obligations.

4 Options OptionProsCons Peak sold NTS exit capacity (current methodology) Consistent with other exit points. Requires User commitment. Risk that Shippers reduce capacity bookings and excessive substitution occurs, thereby compromising SoS.. Peak sold entry capacity to downstream system. Requires a User commitment (not with NG). Risks excessive substitution if capacity unsold on both sides (currently low bookings at Moffat entry). TYS Peak Forecast DemandShould resolve SoS issues. Variance with CER 2010 forecast, 2011 closer alignment. No I(UK) figure. No User commitment. Downstream Peak Forecast Demand Should resolve SoS issues. Originally proposal from Gaslink. CSA Max Allowed Flow Rate. Linked to physical connection assets. Should resolve SoS issues subject to current build level being sufficient. Not consistent with physical capability of connected system. Protected capacity > capacity available as downstream entry. No User commitment. CSA Max Meter Capability. NTS Technical Capacity Published/Transparent Should resolve SoS issues. Very high value = higher level of protection Based on obligated level: so totally prevents substitution. No User commitment. Protected capacity > capacity available as downstream entry. Downstream Technical Capacity Published/Transparent/independent of NG. Should resolve SoS issues. Does not totally prevent substitution. Based on physical assets, less variable. No User commitment. The following options define the quantity that will be excluded from exit capacity substitution, i.e. is not Substitutable Capacity. For all options, sold capacity will not be substituted, even if this quantity is higher than the quantity determined from the option.

5 Views  National Grid has discussed these options with the Interconnector Operators at Bacton [I(UK)] and Moffat.  Interconnector (UK) agree with National Grid’s proposal to use the downstream Technical Capacity to define Substitutable Capacity.  Gaslink believe the “maximum flow profile” stated in the Connected Systems Agreement is more appropriate.  Discussions are on-going.

6 Proposal and Next Steps  Subject to further responses from Interconnector Operators, Ofgem and industry participants, National Grid is proposing to amend the definition of Substitutable Capacity in the Exit Capacity Substitution Methodology Statement to exclude any capacity, whether sold or unsold, at interconnector points, up to the published Technical Capacity of the connected system.  Formal consultation on the revised methodology statement is expected to commence late February 2012.