Program Overview and Update Program Overview and Update Successful Case Example: Belmont Shores Mobile Home Park, Los Angeles County LEA Successful Case.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Certification of Compliance By Evita Lagard
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Building on a Landfill Celeste Manolas, Project Manager Santa Barbara County General Services Capital Projects.
Landfill Buffer Zone Ordinance in Monterey County CIWMB/LEA Partnership Conference October 18, 2007 Matt Fore, REHS, MPA Monterey County LEA.
Brownfield / Landfill Applications
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
1 Indiana Department of Environmental Management Budget Presentation FY
Bay Area Air Quality Management District LEA CIWMB CONFERENCE August 2,
Landfill Postclosure and Environmental Restoration August 3, 2006 LEA CIWMB Partnership Conference Don Dier Jr., P.E.
Partnerships and Processes Landfill Redevelopment.
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
Department of Resources Recycling & Recovery F a r m & R a n c h G r a n t P r o g r a m.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) September 8, 2008 Agenda Item 5 (Committee Item F) September 8, 2008 Consideration.
California Integrated Waste Management Board Agreement with Air Resources Board for Surveillance Assistance Special Waste Committee Meeting May 10, 2006.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
California Integrated Waste Management Board 1 May 9, 2007 Committee Item N Board Item 23 Consideration Of Grant Awards And Scopes Of Work And Contractors.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Newport Terrace Landfill (Continuous Gas Monitoring System)
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Introduction to Construction General Permit Inspections.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
New LEA Orientation 101 8th LEA/CIWMB Conference 2005 Anaheim, CA Presenters: Robyn Browne - Lake County LEA Bill Prinz - City of San Diego LEA.
Consideration Of New Projects Under The Solid Waste Disposal Site And Codisposal Site Cleanup Program (Solid Waste Disposal Trust Fund, FY 2006/07) Consideration.
1 Fire Planning Prevention and Preparedness 27 November 2013.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Consideration Of The Aggregate Recycling Systems Illegal Disposal Site For The Solid Waste Disposal and Codisposal Site Cleanup Program and Augmentation.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
1 Assessment of Perimeter Landfill Gas Monitoring Probe Functionality Using a Video Borehole Monitor LEA/CIWMB Partnership Conference San Diego, CA – October.
Postclosure Land Use Rebecca Lafreniere City of San Diego Solid Waste LEA (619) Arizona Street Landfill: The Importance of Postclosure Land Use.
SACRAMENTO COUNTY LEA CASE STUDIES WARING’S DUMP OBIE’S DUMP.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Jim Filbin Aggregates1 Jim Filbin Aggregates Facility No. 40-AA-0041 CIWMB Hearing Panel April 5, 2006 Located at 4398 Santa Fe Road, San Luis Obispo (APN.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
SAINT FRANCIS HIGH SCHOOL Case Study Continuous Gas Monitoring Sacramento County Environmental Management Department.
Agenda Item No. 5 Consideration of Approval of New Sites for the Solid Waste Disposal and Codisposal Site Cleanup Program October 2003 Permitting and Enforcement.
Congratulations! It’s a Burn Dump. What Do You Do Now? LEA/CIWMB PARTNERSHIP CONFERENCE Anaheim, California May , 2005 California Environmental.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
LEA Conference, October 18, CIWMB Proposed Compliance Strategy Lorraine Van Kekerix Division Chief Compliance Evaluation & Enforcement Division.
Waste Tire Enforcement Grant Program Integrated Waste Management Board –Georgianne Turner (916) $30 Million Waste Tire Recycling Fund –$1.75 per.
Landfill Odor Action Plan Utilities Department October 6,
California Integrated Waste Management Board Agreement with San Francisco State University to use Satellite Technology to Locate Waste Tires in California.
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
Structure Gas Monitoring Requirements in 27 CCR Glenn K. Young, P.E. Senior Waste Management Engineer Closed Illegal & Abandoned Sites.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) June 9, 2008 Agenda Item 5 (Committee Item F) June 9, 2008 Consideration.
Committee Item N Update and Request For Direction Regarding State/Local Efforts to Combat Illegal Dumping Committee Item N Update and Request For Direction.
California Integrated Waste Management Board Special Board Meeting CONSIDERATION OF BOARD ACTION OVER MADERA COUNTY LEA Sacramento, CA October 3, 2005.
1 Indiana Department of Environmental Management Budget Presentation FY
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
California Integrated Waste Management Board CIWMB Permitting And Enforcement Committee Discussion of Local Enforcement Agency Evaluations Sacramento,
South Framingham Initiative MassDEP’s Project to Improve Environmental Quality in an Environmental Justice Neighborhood 2015.
LEA EVALUATIONS Evaluation staff assess LEA performance to ensure LEA: 1)Provides consistent enforcement of statute and regulations. 2)Implements its.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
Results of Screening Analyses of 224 California MSW Landfills Landfill Compliance Study presented to California Integrated Waste Management Board by GeoSyntec.
South Carolina Perspective on Part 61 Proposed Revisions
Sacramento County Stormwater Quality Program
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
the path less traveled Termination of Post Closure Care
Sacramento County Stormwater Quality Program
Presentation transcript:

Program Overview and Update Program Overview and Update Successful Case Example: Belmont Shores Mobile Home Park, Los Angeles County LEA Successful Case Example: Belmont Shores Mobile Home Park, Los Angeles County LEA Closed, Illegal, and Abandoned (CIA) Site Program Permitting and Enforcement Committee Item B October 10, 2006

Phase I Office Investigations Phase I Office Investigations Phase II Field Investigations Phase II Field Investigations 2 Continuous Gas Monitoring Networks 2 Continuous Gas Monitoring Networks 9 Gas Monitoring Networks 9 Gas Monitoring Networks 12 Waste Extents and Cover Investigations 12 Waste Extents and Cover Investigations Environmental and Lab Services ($800K spent) Environmental and Lab Services ($800K spent) CIA Priority Lists CIA Priority Lists SWIS Inspection Data Input/QA (1300/yr) SWIS Inspection Data Input/QA (1300/yr) LEA Technical Support: Website/Advisories/Workshops/Conferences LEA Technical Support: Website/Advisories/Workshops/Conferences CIA Program Update

Continuous Monitoring System Projects Belmont Shores Newport Terrace

Gas Monitoring Networks Installed SITECountyWellsCost 14 th Avenue Landfill Sacramento10$34 Belmont Shores Mobile Home Long Beach (LA) 33$56 YSDA Landfill Yuba6$25 Eastside Landfill (Hellyer Park) City of San Jose 6$49 Gerber Road Landfill Sacramento8$35 Canyon Park Dump/Duarte Duarte (LA) 8$37 Disposal Gardens Torrance (LA) 13$35 Cannery Street LF Orange4$32 Warings Dump Sacramento3$18

Gas Monitoring Well Network

Gas Monitoring Network Installation Canyon Park LF (Duarte) Los Angeles County Waring’s Dump Sacramento County 14 th Avenue Sacramento County Hellyer Park-Eastside LF City of San Jose

Waste Extents & Characteristics and Cover SITECOUNTYIntrusiveLocations Samples Cost (000) Newport Terrace Condos Orange3420$95 Noah Webster School San Diego 2017$25 West Bryte Burn Dump Yolo2728$33 Franklin Field Burn Site Sacramento3232$20 Sante Fe Road Stanislaus4161$69 Gerber Road LF Sacramento1915$30 Warings Dump Sacramento1849$30 Homeland Burn Site Riverside2020$29 Sunset Cliffs Burn Site San Diego 2020$29 Fortuna Burn Dump Humboldt2525$25 Portola Burn Site Plumas1524$7 Truckee Burn Dump Nevada2325$25 Brown’s Fill San Diego 2323$10

Waste Extents/Cover

Waste Extents/Cover Investigation: Direct Push Newport Terrace Condos Noah Webster School

Waste Extents/Cover Investigation - Trenching Sante Fe Rd (San Joaquin) Franklin Field Burn Site (Sacramento) Fortuna Burn Dump (Humboldt) Waring’s Dump (Sacramento) Gerber Rd Landfill (Sacramento) Homeland Burn Site (Riverside)

Investigation Results, e.g. “Saving the World One Dump at a Time” Belmont Shores: Gas Sensors and Alarms placed in each Mobile Home, Park Management to repair cap beneath mobile homes Belmont Shores: Gas Sensors and Alarms placed in each Mobile Home, Park Management to repair cap beneath mobile homes Elvas Avenue: Gas Control System Installed by City of Sacramento with SWCP matching grant from the Solid Waste Clean-up Program Elvas Avenue: Gas Control System Installed by City of Sacramento with SWCP matching grant from the Solid Waste Clean-up Program Newport Terrace: Gas Control System to be funded, designed and constructed by the City of Newport Newport Terrace: Gas Control System to be funded, designed and constructed by the City of Newport Cannery Street: Gas Migration Remedy being implemented by Orange County IWMD Cannery Street: Gas Migration Remedy being implemented by Orange County IWMD YSDA: One probe found in violation of 5% rule YSDA: One probe found in violation of 5% rule Gerber Road LF: No probes found in violation of 5% rule Gerber Road LF: No probes found in violation of 5% rule Canyon Park LF: Gas migration occurring into residential areas Canyon Park LF: Gas migration occurring into residential areas 14 th Avenue: LEA issued N&O for Gas Violations 14 th Avenue: LEA issued N&O for Gas Violations West Bryte: LEA issued N&O for Cover, Grading West Bryte: LEA issued N&O for Cover, Grading Bisso IDS: Partial Clean-closure Completed Bisso IDS: Partial Clean-closure Completed Waring’s Dump: referred to Solid Waste Clean-up Program Waring’s Dump: referred to Solid Waste Clean-up Program

County of Los Angeles Department of Health Services Solid Waste Local Enforcement Agency (LEA) Belmont Shores Mobile Home Estates, a.k.a. City Dump and Salvage Disposal Site Gas Monitoring History Presenters Ken Murray & Peter Oda

Site History Disposal site operation Disposal site operation Development began: Development began: Belmont Shores Mobile Estates Gas Lamp Restaurant Bahia Marina Golden Sails Best Western

City Dump and Salvage 1956

1960

Current Property Use

Site History 1970 grading and settlement, and gas issues 1970 grading and settlement, and gas issues 1973 subsurface venting program 17 vents installed 1973 subsurface venting program 17 vents installed 1975 explosion in mobile home park, 1 death 1975 explosion in mobile home park, 1 death Continued settlement issues Continued settlement issues

Site History Vents monitored by private consultant Vents monitored by private consultant 1994 CIWMB called to evaluate issues with differential settlement 1994 CIWMB called to evaluate issues with differential settlement Excessive gas found in storm drains and in vents Excessive gas found in storm drains and in vents Recommendations of a full scale monitoring program Recommendations of a full scale monitoring program 1998 additional vent installed 1998 additional vent installed 2002 brought to the attention of the CIA group 2002 brought to the attention of the CIA group

Site Investigation 2004 Los Angeles county requests assistance from CIWMB’s Closed, Illegal, and Abandoned Site unit (CIA) to conduct: 2004 Los Angeles county requests assistance from CIWMB’s Closed, Illegal, and Abandoned Site unit (CIA) to conduct: A phase 1 investigation A phase 2 investigation Possible mitigation measures Possible mitigation measures Focused on Belmont Shores Mobile Home Park Focused on Belmont Shores Mobile Home Park

Investigation 33 Probe Locations

Investigation Geophysical Geophysical Installation of 37 multi-level gas monitoring probes Installation of 37 multi-level gas monitoring probes 33 in Belmont Shores 33 in Belmont Shores 4 around the perimeter 4 around the perimeter Gas samples taken and sent to Lab Gas samples taken and sent to Lab Bi-weekly monitoring conducted by LEA and CIWMB Bi-weekly monitoring conducted by LEA and CIWMB

37 Multi-Depth Gas Probes 33 at Belmont Shores Park

Gas Sampling

Average Gas Concentration 51.20% Under The Cap

Structure Gas Monitoring Regulations in 27 CCR (a) (1) requires that “…The concentration of methane gas must not exceed 1.25% by volume in air within on-site structures…” (a) (1) requires that “…The concentration of methane gas must not exceed 1.25% by volume in air within on-site structures…” 20931(a) “…monitoring network design shall include provisions for monitoring on site structures, including but not limited to buildings, subsurface vaults, utilities or other areas where potential gas buildup would be of concern…” 20931(a) “…monitoring network design shall include provisions for monitoring on site structures, including but not limited to buildings, subsurface vaults, utilities or other areas where potential gas buildup would be of concern…” 20931(c) “…Structures located on top the waste disposal area shall be monitored on a continuous basis..” 20931(c) “…Structures located on top the waste disposal area shall be monitored on a continuous basis..” (a)(1) “…monitoring reports shall include: (1) the concentrations of the methane….within each on-site structure…” (a)(1) “…monitoring reports shall include: (1) the concentrations of the methane….within each on-site structure…” (a)(3) “…the documentation of date, time, barometric pressure, atmospheric pressure, general weather conditions and probe pressures…” (a)(3) “…the documentation of date, time, barometric pressure, atmospheric pressure, general weather conditions and probe pressures…”

Structure Gas Monitoring Data Analysis Time-trend continuous monitoring data for one year from 8 gas sensors placed throughout the park will be reviewed by the CIWMB/KEA to determine if 1.25% gas is exceeded in monitored coach skirts Time-trend continuous monitoring data for one year from 8 gas sensors placed throughout the park will be reviewed by the CIWMB/KEA to determine if 1.25% gas is exceeded in monitored coach skirts Important Note: Based on the results of the CIWMB Gas Investigation Report (Feb 2005), it is recommended that all coaches be required to be equipped with continuous gas monitoring systems (fixed combustible gas detection systems) since the integrity of the disposal site cap is unknown under each coach Important Note: Based on the results of the CIWMB Gas Investigation Report (Feb 2005), it is recommended that all coaches be required to be equipped with continuous gas monitoring systems (fixed combustible gas detection systems) since the integrity of the disposal site cap is unknown under each coach Applicable Regulation: Control (d) “…When the results of monitoring in on site structures indicate levels in excess of those specified in Section 20923(a), the operator shall take appropriate action to mitigate the effects of landfill gas accumulation in on site structures, and public health and safety, shall include one or more of the following:…(4) Alarms, …(5) Ignition source control…(7) Ventilation…” Applicable Regulation: Control (d) “…When the results of monitoring in on site structures indicate levels in excess of those specified in Section 20923(a), the operator shall take appropriate action to mitigate the effects of landfill gas accumulation in on site structures, and public health and safety, shall include one or more of the following:…(4) Alarms, …(5) Ignition source control…(7) Ventilation…”

Investigation Phase 2 Need to determine if surface migration exists Need to determine if surface migration exists Logic for sensor locations chosen (zones) Logic for sensor locations chosen (zones) Placement of 24/7 methane sensors Placement of 24/7 methane sensors 8 locations 8 locations

Sensor Locations

Controller and Data Logger System is Currently Operating

Sensor Unit and Transmitter

Calibration Calibration

Sensor Operation and Housing

Structure Gas Monitoring Results End State: The site will be judged to be in compliance with applicable regulations (27 CCR & 20937) when all coaches are continuously monitored for landfill gas and actions are taken to prevent the accumulation of gas in coaches where concentrations exceed 1.25% Vgas/Vair End State: The site will be judged to be in compliance with applicable regulations (27 CCR & 20937) when all coaches are continuously monitored for landfill gas and actions are taken to prevent the accumulation of gas in coaches where concentrations exceed 1.25% Vgas/Vair

Current Conditions Each coach is being modified with a sensor Each coach is being modified with a sensor Other locations Other locations Gas lamp Gas lamp Bahia marina Bahia marina Golden Sails Best Western Golden Sails Best Western

Questions