04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.

Slides:



Advertisements
Similar presentations
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Advertisements

M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
V. Bobillier1 Cable installation status.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
26 MAY 2004Jacques Lefrancois1 PRR for LED SYSTEMS 3 notes distributed + 3 presentations (Anatoli, Ivan, Evgueni) Large amount of work ; many prototypes.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
TOTEM Electronics Status
Service channels between Tracker and PP1
Update on ‘Real estate’ for Level-0
Integration – preliminary ideas on routing and tests
EMU Slice Test Run Plan a working document.
Pictures and comments from Vitali Smirnov August 2010
Needed for Team A on -End
Presentation transcript:

SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard by Robert

SB 2 Cables routing  PP -> fix point -> ECAL  PP -> fix point -> HCAL  HCAL -> fix point -> ECAL  380V + control for power supplies  Power for CWs, pin-diods  Data and TTC optical cables  ECS  SPECS  Radioactive source for HCAL  DSS  Water  Trigger cables

SB 3

4  Optical cables  few problems identified by Patrick:  Trigger-Data fibers are not tagged  Colour convention problem  to test before installation ?  Trigger cables HCAL -> ECAL  length critical for 6 cables => individual routing  Water cooling: water reservoir still to be produced  Manpower “sharing” with other activities Some details

SB 5  Minimal cabling for common test (ECAL L3B01 + HCAL L3A03)  380 V + control  Data + trigger optical  Trigger HCAL -> ECAL  SPECS for CROCs, voltage and light distribution boards ECAL+HCAL  Power CWs and LEDs (?), backup: keep power supplies on the calorimeter  Turbines for two racks involved  Connection of two chillers problem: guarding/monitoring the power for chillers and turbines Cabling for common test

SB 6  C-side rack 1 for ECAL/PS and HCAL rack to be finished on the week of 9/10 (partial DSS, temporary water?)  C-side to be completed on the week of 16/10 (partial DSS, temporary water?)  A-side to start on the week of 16/10  Permanent labels pending Outlook