Conclusions Nodel Modeling Forum. Proposal 1 ERCOT builds the NMMS tool to be able to include the planning data; but not propose changes to the planning.

Slides:



Advertisements
Similar presentations
Common Legal Mistakes Districts Make
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
Retail Sub-Committee Update Robert Connell June 14, 2002.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
BLACA - IPI seminar 5 October th anniversary of the Rome Convention Bird & Bird.
TSP WebEx Conference Call Mar 24, Antitrust Admonition 1. Explanation of Validation of Network Model 2. Explanation of Metric.
Credit Work Group Update April 4, General  Credit Work Group met on Friday, March 7  Received Ethics Training from ERCOT Legal staff  Reviewed.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
March 25, 2015 TDSP AMSR Cycle Read Analysis AMWG Meeting.
MS Access: Database Concepts Instructor: Vicki Weidler Assistant: Joaquin Obieta.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
1 TSP Nodal Engagement Market Participant Call ERCOT July 14, 2010.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
CRR Model Building Process Bradley Bell CRR Engineer.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
Network Model Management System (NMMS)
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
MySQL Vs. PostgreSQL comparison from a layman’s perspective By: Bhalchandra.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
February 12, 2009 ROS ERCOT and TSP activities for Planning Model Go-Live.
Bighorn Long-Term Issues Group Where Are We Going?
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
ERCOT Comments TNT Transition Plan Ray Giuliani TAC Meeting October 6, 2005.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT June 16, 2010.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
PMO Update to PRS Troy Anderson Program Management Office December 13, 2007.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
TIA – ETSI workshop Conclusions March 22nd Objectives Harmonize the documents into a single set of documents (requirements, definition, architecture.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
KENTUCKY ALTERNATE ASSESSMENT TRANSITION ATTAINMENT RECORD (TAR) PART II Click here to download the Administration Guide (Required for completion.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
COMET Working Group Progress Report 11/13/03
Compliance Report to ERCOT BOD December 2006
PLWG Review 6.9 and the Interconnection process
Nodal FAQs Access to Secure Documents
Task 5: Meeting the client brief (THE FINAL TASK!)
Timeline Tool Kit December 25, 1946
Outlines The first point of your outline should be your thesis. Your thesis is the answer to your research question. Your thesis will probably change.
February 2007 Note: Source:.
½ of 6 = 3.
Modified at -
Fire Emissions Joint Forum February 9, 2005
Presentation transcript:

Conclusions Nodel Modeling Forum

Proposal 1 ERCOT builds the NMMS tool to be able to include the planning data; but not propose changes to the planning process unless we continue to fail the case comparisons. (assuming we get consensus on how the planning cases created by NMMS will look) In the meantime: pursue the “modified existing process” to attempt to produce planning cases which meet the requirements of the protocols by June 2007 (plan). Test case by December Redline the “principals” document as a start of the comparison standard.

Alternate Position Create a timeline for the NMMS database that would address operational model requirements and create an interface which will appropriately address the planning data. Planning common names at the bus interface and nodal interface and create correspondence files. When it does not agree fix it.

Consensus We need to agree on the naming convention Note – have a meeting on 29 th joint sswg & ndswg to discuss this. Will meet again on April 3 rd or 4 th at Taylor.