April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford September 28, 2009 Casper Instrumentation at Green Bank The NRAO is operated for.

Slides:



Advertisements
Similar presentations
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Advertisements

West Coast Spectrometer Team Mark Wagner, Berkeley project manager, FPGA designer Terry Filiba, data transport: FPGA --> CPU --> GPU Suraj Gowda, boosting.
Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford August 5, 2008 CICADA Project The NRAO is operated for the National Science Foundation.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
David Hawkins Exascale Signal Processing for Millimeter-Wavelength Radio Interferometers David Hawkins
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
BEEKeeper Remote Management and Debugging of Large FPGA Clusters Terry Filiba Navtej Sadhal.
Sascha D-PAD Sparse Aperture Array.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Highly Scalable Packetised correlators Jason Manley CASPER workshop 2009.
Backend electronics for radioastronomy G. Comoretto.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
P ulsa R E xploration and S earch TO Jintao Luo NRAO-CV CREDIT: Bill Saxton, NRAO/AUI/NSF.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
Glen Langston: VSOP-2 at JPL 061 NRAO-GB Support for VSOP-2  Glen Langston National Radio Astronomy Observatory Green Bank, WV USA NRAO Goals  Support.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array A New Multibeam Spectrometer.
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Ron DuPlain, Scott Ransom, Paul Demorest, Patrick Brandt, John Ford, Amy Shelton CASPER information.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
5 Jan 2004, Boulder CO URSI The Current Status of the Green Bank Telescope.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
National Science Foundation Introduction to School Tomas E. Gergely Summer School on Spectrum Management and Radio Astronomy Green Bank, June 2002.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Next Generation Digital Back-ends at the GMRT Yashwant Gupta Yashwant Gupta National Centre for Radio Astrophysics Pune India CASPER meeting Cambridge.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
CASPER Packetised correlators Jason Manley CASPER workshop 2009.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array CASPER Workshop 2009.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
Real-time Acquisition and Processing of Data from the GMRT Pulsar Back- ends Ramchandra M. Dabade (VNIT, Nagpur) Guided By, Yashwant Gupta.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
Jason Manley, Aaron Parsons, Don Backer, Henry Chen, Terry Filiba, David MacMahon, Peter McMahon, Arash Parsa, Andrew Siemion, Dan Werthimer, Mel Wright.
GSB : A real-time Software back-end for the GMRT Jayanta Roy National Centre for Radio Astrophysics Pune, India 12 th December 2008 Collaborators.
Short introduction Pulsar Parkes. Outline PDFB – Single beam pulsar timing system CASPER – Single beam pulsar coherent dedispersion system.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
Exploring the Unknown with CASPER Instrumentation Andrew Siemion CASPER Workshop 2011.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
WVU Astronomy / Engineering and The Green Bank Observatory Richard Prestage Scientist, NRAO.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ngVLA: Reconfigurability.
SETI Spectrometer Development for ALFA
GUPPI Software Overview
Mark 5 / VLBA Correlator Topics
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
Gravitational Waves and Pulsar Timing
John Ford2, Andrew Harris3, and Shuvra S. Bhattacharyya1
GBT and other Green Bank Capabilities
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
KFPA CDR R. Norrod Feb 27, 2008.
Presentation transcript:

April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford September 28, 2009 Casper Instrumentation at Green Bank The NRAO is operated for the National Science Foundation (NSF) by Associated Universities, Inc. (AUI), under a cooperative agreement.

2 Outline NRAO Configurable Instrument Collection for Agile Data Acquisition (CICADA)‏ –Green Bank Ultimate Pulsar Processing Instrument (GUPPI) –West Virginia University Pulsar Processing Instrument (WUPPI) –GUPPI - 2 –Future instruments

3 NRAO Mission The (US) National Radio Astronomy Observatory enables forefront research into the Universe at radio wavelengths. In partnership with the scientific community, we: –provide world leading telescopes, instrumentation and expertise, –train the next generation of scientists and engineers, and –promote astronomy to foster a more scientifically literate society.

4 Aperture Synthesis Telescopes Very Long Baseline Array (VLBA)‏ –Network of 10 telescopes spread over United States –Resolution of a 5000 mile diameter telescope Highest Resolution of any telescope on earth or in space –Sometimes the GBT becomes part of this array (E) Very Large Array (VLA)‏

5 Green Bank Facilities 2700 Acre site in Pocahontas County –8 Radio Telescopes on site –National Radio Quiet Zone 150 mile rectangle centered around Green Bank and Sugar Grove Provides protection for the sensitive receivers on the telescopes –Green Bank Science Center

6 Panoramic View of Green Bank Telescopes

7 CICADA Configurable Instrument Collection for Agile Data Acquisition –FPGA based data acquisition and processing –Uses CASPER tools and hardware Umbrella program for organizing FPGA projects –Purchase/obtain boards, software, development systems –3 ROACH, 2 BEE2, 5 iBOB, 6 ADC, 3 ADC-2, 10 GbE switches, servers, etc.

CICADA People GUPPI –Randy McCullogh, Jason Ray, Patrick Brandt, Ron Duplain, Paul Demorest, Scott Ransom WUPPI/43 meter stuff –Shilpa Bollineni, Glen Langston, Paul Demorest –WVU Folks

9 CICADA Projects Spectrometer Proposals –KFPA backend –Replacement for GBT Spectrometer Event capture machines –Used for transient events Pulsar machines –Incoherent machine (GUPPI, WUPPI) –Coherent dedispersion machine GUPPI-2

GUPPI

11 Sampler( iBOB)

GUPPI BEE2 XAUI alignment

14 GUPPI BEE2 signal processing design

15 GUPPI BEE2 signal combining FPGA

beef.gb.nrao.edu *.nrao.edu GUPPI command prompt Python SOAP client GUPPI GBT M&C Manager C++ SOAP client GUPPI Software Overview 100 MbE10 GbE Ethernet XAUI out-of-band control bits equipment BEE2 runs guppi controller on Debian + BORPH O/S IBOBs no custom controller software ADCs Clock Synthesizer Power Strip clock input power XAUI GBT IF telnet over Ethernet systems control signals data streams notes/comments. guppi_daq threads: net disk fold (for folding mode) will also run on GPU nodes in GUPPI Phase II guppi controller modules: DAQ POWER SYNTH BEE2 guppi_statusd gets GBTStatus shared memory Unix socket shared memory

GUPPI Status Currently available GUPPI Modes –128 to 4096 channels –2 polarizations –100 to 800 MHz bandwidth –Full Stokes or Total Intensity Only –Decimation in frequency and time in CPU –Records up to ~250 MB/S continuously –Disk space is a considerable problem Fully integrated into the GBT Observing System

GUPPI's Advantages Searching: 800MHz of BW, 4096 chan, and RFI-resistance (from polyphase filterbank) will make GUPPI a “Super- Spigot” that will be unbeatable for searches from 1-5 GHz (previously the BCPM and Spigot)‏ High Dynamic-Range Studies: 8-bit sampling, high spectral resolution and Full Stokes will make GUPPI perfect for scintillation studies, HI absorption, Faraday rotation measurements, polarization studies, and singlepulse studies (previously the Spectral Processor)‏ Ultra-High Precision Timing: 8-bit sampling, 800MHz of BW, and RFI resistance will allow unprecedented timing precision from 1-3 GHz for millisecond pulsars (i.e. the NANOGrav project and the search for nHz gravitational waves; previously GASP/CGSR2)‏

GUPPI-2 Uses GUPPI to feed a 9-machine cluster of GPU’s via 4 10 GbE ports. 128, 256, or 512 coarse channels will be supported 100 MHz processed per GPU at “reasonable” DM’s. Only modification to GUPPI is a new output FPGA personality and software to control the nodes

GUPPI-2 experiments

GUPPI-2 Experiments

WUPPI Crab Pulsar Data

Future Projects Not funded, but… –K band Array receiver spectrometer –GBT Spectrometer Replacement –Transient searches on old telescopes (like fly-eye, with bigger and fewer dishes) –Lunar Neutrino project Several 43m projects: –WUPPI –Receiver project

24 K band Feedhorn Array Spectrometer 7 pixels, dual polarization –21 ROACH boards, 14 ADC's –Needs to be in receiver room 3 GHz bandwidth Cross correlation between polarizations on a single pixel “Zoom” mode for multiple narrow windows in a bandpass Fast dump mode for pulsar use on a few polarizations Normal dump times of 1 ms

Array Spectrometer design

43m Receiver and Spectrometer

The End Summary: –GUPPI is working well Designs available for distribution in unadorned form now (version 7.1 right now) Plan to submit the FPGA designs, software, and hardware designs to the CASPER wiki