Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.

Slides:



Advertisements
Similar presentations
Steve Schwabe Woolpert Project Manager
Advertisements

EQUIPMENT VALIDATION.
ITIL: Service Transition
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
SE 555 Software Requirements & Specification Requirements Management.
Enterprise Asset Management (eAM)
ORACLE ENTERPRISE ASSET MANAGEMENT
An overview of the CERN CMMS
1 Fire Service Professionals. 2 Overview n Industrial Fire Systems n Innovations n Hazardous Areas n Changes to regulations n System integration n Future.
Thomas Baron CERN Infor EAM User Meeting 26 June 2013.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
MDC Open Information Model West Virginia University CS486 Presentation Feb 18, 2000 Lijian Liu (OIM:
Enterprise Asset Management
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Software Configuration Management
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
E.Matias Canadian Light Source. Where is Saskatoon?
Current Projects in DTEI Presented By: Tracy Jordan.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
LHC Maintenance Management Policy Chamonix XIV January 2005 T.Pettersson - EDMS: LHC MAINTENANCE POLICY AND REQUIREMENTS.
Automated Cost Transfers August 14, Getting started Trusted requestor should request access to iSpace routing for Executive Director, Director or.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
An overview of current & future functionality David Widegren TS/ASE/EPS 23 February 2008EDMS:
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Review of the processes released in the framework of the MMP Goran Perinić.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Maintenance Management Software SPUDWEB TECHNOLOGIES PRIVATE LIMITED SPUMAINT Presented By :-
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
ITIL: Service Transition
Reliability Analysis & Infor EAM
Chapter 18 Maintaining Information Systems
Configuration Management and Layout Database ELENA Project
Hélène ROZELOT, Y. M. Abiven, S. Blanchandin, J. Chabard, C
The MTF adjusted system to meet Vacuum Group needs
C/S Windows Overview Nigel Pilsbury.
Infor EAM in the Handling Engineering Group at CERN
Case management as logbook for the cryogenic installations at CERN
Work Order System Infor 10 (EAM) Yanfeng
Radiopharmaceutical Production
Presentation transcript:

Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN

CERN extract of inventory Mechanical componentsInstrumentation Adsorbers60Flow measurem.170 Filters827Level measurem.163 Compressors104Speed meas.173 Control valves1426Pressure meas.2483 Manual valves11753Temp. meas.2697 Safety valves1578Moisture meas

Management tasks MAINTENANCE 1 ASSET MANAGEMENT 5 DOCUMENTATION MANAGEMENT 3 WORK ORDER MANAGEMENT 4 RESOURCE MANAGEMENT 2 WAREHOUSE MANAGEMENT

1 Asset management Keeping track of all physical assets thoughout their whole lifecycle. THIS IS THE BASIS! Especially if you wish to ensure planned and proactive maintenance If you don’t do EAM, you’re in « run-to-failure- mode »

1 Asset management - Structure Level 4 – component e.g. instrument Level 3 – subsystem e.g. compressor station Level 2 – system e.g. point 8 refrigerator Level 1 – domain e.g. accelerator

1 Asset management – roadmap

1 Asset management Keeping track of all physical assets thoughout their whole lifecycle. THIS IS THE BASIS! Especially if you wish to ensure planned and proactive maintenance If you don’t do it, you’re in « run-to-failure- mode » STATUS: Databases have been created for the accelerator installations. PLANS: Still to be completed for the detector installations and the older installations. Active assets need to be declared.

2 Warehouse management Similar to asset management – keeping track of all spare parts and all transactions This helps to reduce the buried investment. STATUS: Pre-LHC parts OK. LHC parts are just being loaded. Criticity analysis carried out on a part of the installations. PLANS: Parts adn criticity analysis for other installations to be completed.

3 Work order management Organizing the workflow of corrective and preventive maintenance, i.e. managing and keeping track of interventions

3 WO management - workflow Teresa Neto 10 CreationValidationAssignmentExecutionValidationClose WO Definition WO description Equipment ID Problem Code Standard WO Requested by Priority Failure Code Status: «Demande de travaux» Service/Department to execute: QSST, QCST, etc. Status: «Lance» Activity: Start date, trade, material list Labor: Employees, Hours Closing: Cause code, Action code, downtime hours Comments Service/Department that should validate Status: «Termine attente de validation entreprise/CERN» Status: «Terminer» Technician Status: «Termine attente de validation entreprise/CERN»

3 WO management – the reality

CreationValidationAssignmentExecutionValidationClose 3 WO Management – in D7i Teresa Neto 12 WO Definition

WO management - tasklist

Organizing the workflow of corrective and preventive maintenance, i.e. managing and keeping track of interventions STATUS: Workflow is operational and applied for accelerator installations. PLANS: Integration of all other installations; Integration of the maintenance plan; definition of routes; linking of spare parts to maintenance tasks. 3 Work order management

4 Resource management Attributing resources to the work order task and managing all related aspects. CERN outsources the maintenance and this part is therefore under the full responsibility of the contractor.

5 Documentation management Ensuring the availability of up-to-date documentation (PIDs, electrical drawings, manuals, …) STATUS: A partof the documentaton has been stored on CERN’s data repository EDMS.

5 Doc. management - EDMS

Summary CERN has deployed an industrial CAMMS on a large part of it’s installations for asset, warehouse and work order management. Documentation management is based on CERN’s data repository EDMS. It is foreseen to use further capabilities of the CAMMS in the near future: i.e. active assets, routes, maintenance plan and various interlinking options.

The different cryogenic departments in D7i

Details of 1 work order