Diablo Canyon NPP Risk-Informed In-service Inspection

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
WGOE Meeting – 29/31 May 2006 Sub-directorate for power reactors DGSNR – SD2 - 1 Organisation of the operating experience and incident.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Summary of Draft NEI Guidance - November 6, GUIDELINES FOR PRIORITIZATION AND SCHEDULING IMPLEMENTATION Pre-Draft 1 – September 30,
NFPA-805 Duke Power Transition – Lessons Learned
Illustration of Prioritization Process Improved reactor coolant pump seal package Fitness for Duty – enhanced testing.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Donegani Anticorrosione S.r.l
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
Overview of Key Rule Features
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
9 th Workshop on European Collaboration for Higher Education and Research in Nuclear Engineering & Radiological Protection Salamanca, Spain 5-7 June 2013.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Workshop Information IAEA Workshop City, Country XX - XX Month,
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Common Cause Failure Analysis Workshop Information IAEA Workshop City, Country.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.
Failure Modes, Effects and Criticality Analysis
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making “Overview of Level 2 PSA” Workshop Information IAEA Workshop City, Country.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Fundamentals and Overview Workshop Information IAEA Workshop City, Country.
An Overview on Risk Management
Ranjan kumar Assistant Manager CCL,Ranchi
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Flooding Walkdown Guidance
Air Carrier Continuing Analysis and Surveillance System (CASS)
Diversity analysis for advanced reactor design
Seminar on Land Use Planning 24 September – Nicosia Summary
Internal Flooding PRA For APR 1400
Presentation transcript:

Diablo Canyon NPP Risk-Informed In-service Inspection IAEA Workshop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Risk-Informed In-service Inspection Lesson: IV 3_11.3 Purpose: To present and explain the Risk-Informed In-service Inspection implemented in Diablo Canyon NPP Learning objectives:To get an global overview of an Utility Risk-Informed In-service Inspection application and its motivation. To know a Risk-Informed In-service Inspection process. To know RI-ISI Expert Panel process. To know main similarities and differences between EPRI and WOG methodologies Duration: 1 and 1/2 [hr] Resources: screen, video projector, PC, PowerPoint 2000® Lecturer Lesson IV 3_11.3 Workshop Information IAEA Workshop City , Country XX - XX Month, Year IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Purpose of In-service Inspection IAEA Workshop Purpose of In-service Inspection To identify conditions, such as flaw indications, that are precursors to leaks and rupture, which violate pressure boundary integrity principles. The lecturer can substitute this presentation by other example more appropriate to the country experience IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

RI-ISI benefits Enhance or maintained plant safety (CDF/LERF) IAEA Workshop RI-ISI benefits Enhance or maintained plant safety (CDF/LERF) Enhanced component reliability for high safety significance components (HSSCs) Reduce nondestructive exams (NDE) Reduced man-rem exposure Other unquantifiable benefits Reduced costs of engineering analysis (flaw evaluations, etc.) Reduced outage time Reduced chance of complicating plant operations (scaffolding, leakage, etc.) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

ASME Section XI Enhanced by Risk-Informed ISI IAEA Workshop ASME Section XI Enhanced by Risk-Informed ISI Calculating pipe failure prob. by considering design, experience and operations High design stress and fatigue locations augmented by random selection Failure Probability Exercising of PSA Model (CDF, LERF, others) Class 1, 2, and 3 Consequence Risk-Informed ISI ASME Section XI Process IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Overall Risk-Informed ISI Process IAEA Workshop Overall Risk-Informed ISI Process Scope and Segment Definition Consequence Evaluation Structural Element Failure Probability Assessment Implement Program Expert Panel Categorization Element/ NDE Selection Risk- Feedback Loop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Segment Definition Full Scope Definition Partial Scope Definition IAEA Workshop Segment Definition Full Scope Definition All Class 1, 2, and 3 piping systems in ASME Section XI Piping fluid systems modeled in PSA Various balance of plant (non-nuclear code class) fluid systems of importance Systems included under scope of Maintenance Rule determined to be risk-significant Systems included in program are reviewed by expert panel for concurrence Partial Scope Definition Subset of piping classes such as ASME Class 1 piping only (includes piping exempt from current requirements) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Segment Definition Segment defined based on: IAEA Workshop Segment Definition Segment defined based on: Piping which have same consequence (loss of train A of RHR, loss of RWST, inside or outside containment consequences) Where flow splits or joins (traditional PSA modeling points) Includes piping to a point in which a pipe failure could be isolated (e.g., check valve, MOV, AOV, no credit for manual valves) Pipe size changes Failure probability expected to be markedly different due to material properties Iterative process with Consequence Evaluation IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Segment Definition Subdivided system into piping segments IAEA Workshop Segment Definition Subdivided system into piping segments Assigned numerical identifier Based upon similar consequence Marked P&Ids & field isometrics Determined failure modes effects analysis (FMEA) Without operator action With operator action IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Consequence Evaluation IAEA Workshop Consequence Evaluation Both direct and indirect (spatial) effects are considered PSA is used to quantify impact Consistent with EPRI PSA Applications Guide Calculations for CDF and LERF Conditional probability/frequency given piping failure Considers multiple impacts Initiating event impact Single/multiple component/train/system impacts Combinations of impacts IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Direct Effects Evaluation IAEA Workshop Direct Effects Evaluation Failure effect based on disabling segment function leak PRA and system information used to determine if piping failure causes: An initiating event (e.g. LOCA, Reactor Trip) Loss of train or system Loss of multiple trains or systems Combination of the above IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Overview Of Indirect Effects Evaluation IAEA Workshop Overview Of Indirect Effects Evaluation Purpose of Evaluation To review any issues in identifying potential indirect effects/consequences from piping failures Identify indirect effects that would differentiate piping segments from each other IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Indirect Effects Considerations IAEA Workshop Indirect Effects Considerations Flooding, spraying, dripping – should be primarily addressed by the PSA internal flooding analyses for all plant areas Pipe Whip, jet impingement – concern is primarily for high-energy fluid system piping IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Indirect Effects Process IAEA Workshop Indirect Effects Process Prewalkdown Review existing documents which examine the local effects of pipe breaks for the systems in the risk-informed ISI program Identify other systems/trains affected by a failure in each area Identify plant areas for plant walkdown Document evaluation Develop walkdown sheets for key areas Walkdown Perform walkdown and document results, actions, issues Post Walkdown Evaluate results Resolve actions IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Failure Probability Assessment Process IAEA Workshop Failure Probability Assessment Process Industry failure experience Identification of potential failure modes and causes Specific-plant information – layout, materials, operating conditions and experience Use of tools or data to calculate failure probability Estimation of leak and break probabilities by engineering team IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Failure Probability Assessment Process IAEA Workshop Failure Probability Assessment Process INDUSTRY EXPERIENCE ENGINEERING TEAM CALC. TOOL PLANT INFORMATION (LAYOUT, MATERIALS, OPERATING CONDITIONS PLANT OPERATING EXPERIENCE) IDENTIFICATION OF POTENTIAL FAILURE MODES AND CAUSES ESTIMATED LEAK AND BREAK PROBABILITIES Engineering Team -ISI/NDE Engineering -Materials Engineering -Design Stress Engineering (Engineering Mechanics) -Plant System Engineer IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

RI-ISI Expert Panel Process IAEA Workshop RI-ISI Expert Panel Process IMPACT - RRW - RAW - INDIRECT EFFECTS RISK EVALUATION MECHANISM PROBABILITY BASIS PRESSURE BOUNDARY FAILURE PROBABILITY -CONTAINMENT PERFORMANCE EXTERNAL EVENTS SHUTDOWN RISK OTHER SCENARIOS MAINTENANCE/OPERATION INSIGHTS DESIGN BASIS/DEFENSE-IN-DEPTH OTHER DETERMINISTIC INSIGHTS OTHER CONSIDERATIONS EXPERT PANEL HIGH AND LOW SAFETY – SIGNIFICANT PIPING SEGMENTS IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Mapping of Surry Segments on Structural Element Selection Matrix IAEA Workshop Mapping of Surry Segments on Structural Element Selection Matrix HIGH FAILURE IMPORTANCE SEGMENT LOW OWNER DEFINED PROGRAM 3 (a) SUSCEPTIBLE LOCATIONS (100%) (b) INSPECTION LOCATION SELECTION PROCESS 1 ONLY SYSTEM PRESSURE TEST & VISUAL EXAMINATION 4 INSPECTION SELECTION PROCESS 2 SAFETY SIGNIFICANT IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Presentation Format Overview of RI-ISI approach Detailed comparison IAEA Workshop Presentation Format Overview of RI-ISI approach Detailed comparison Scope and segment definition Consequence evaluation Failure probability assessment process Risk evaluation Selection of elements and NDE methods (expert panel) Change in Risk calculations RI-ISI implementation (not addressed here) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

EPRI-RI-ISI Process Determine Scope Perform Segment IAEA Workshop EPRI-RI-ISI Process Determine Scope Perform Segment Consequence Analysis Perform Segment Damage Mechanism Analysis Perform Service Review Finalize Program Perform Risk Impact Assessment Select Elements for Inspection and Element Inspection Methods Determine Segment Risk Category Adjust Element Selection Performance Monitoring IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

IAEA Workshop Segment Definition Segment definition guidelines (similar in both methodologies) Piping which have same consequences Where flow splits or joins Pipe size changes Change in piping material Isolation capability EPRI uses the above plus same failure mechanism criterion IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Consequence Evaluation IAEA Workshop Consequence Evaluation Deterministic evaluation of piping failure-induced impact (both methodologies) Direct impact (e.g. loss of a train) Indirect impact (e.g. damage caused by flooding, jet impingement) Multiple impacts (e.g. initiating events + Accident mitigation) Probabilistic evaluation EPRI uses a bounding worst case evaluation (using matrix or calculation) WOG uses surrogate(s) to quantify condition CDF (CDP) and LERF (LERP) for spectrum of failure modes (leak, disabling leak, double ended break) utilizing internal events PSA model IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Structural Reliability Assessment IAEA Workshop Structural Reliability Assessment Both methodologies evaluate potential for pipe failure EPRI qualitatively classifies potential for pipe rupture as “High”, “Medium”, or “Low” based on degradation mechanisms, in-service data, expert knowledge (no code). WOG uses SRRA code (stays with the user) to quantify leak/rupture frequency/probability based on in-service data, potential failure mechanisms, and plant specific information (e.g. layout, materials, operating and conditions, etc.) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

IAEA Workshop Risk Evaluation EPRI uses risk matrix to separately categorize piping segments in the high, medium, or low classifications using prescriptive criteria for the consequence and rupture potential elements (risk is not calculated). It uses plant staff to review the results and concur with the risk ranking results WOG methodology uses standard approaches for CDF/LERF calculation (ie. Frequency * CCDP) and risk ranking process (RAW and RRW). Additionally, expert panel discussions are held to review PSA results and include other potential risk contributors (e.g. shutdown risk, external events, etc.) WOG methodology allows credit for aumented programs IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Element Selection Both methodologies inspect for cause IAEA Workshop Element Selection Both methodologies inspect for cause EPRI methodology uses prescriptive rules (fixed percentages) to determine the population of elements to be inspected WOG methodology uses a combination of prescriptive and statistical rules to determine the population of elements to be inspected. IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

WOG Matrix HIGH FAILURE IMPORTANCE SEGMENT LOW 3 1 4 2 SAFETY IAEA Workshop WOG Matrix HIGH FAILURE IMPORTANCE SEGMENT LOW OWNER DEFINED PROGRAM 3 (a) SUSCEPTIBLE LOCATIONS (100%) (b) INSPECTION LOCATION SELECTION PROCESS 1 ONLY SYSTEM PRESSURE TEST & VISUAL EXAMINATION 4 INSPECTION SELECTION PROCESS 2 SAFETY SIGNIFICANT IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Pipe Rupture Potential IAEA Workshop EPRI Risk Matrix Consequence Assessment MEDIUM (Cat. 4) LOW (Cat. 6) (Cat. 7) HIGH (Cat. 2) (Cat. 5) (Cat. 1) (Cat. 3) NONE CONSEQUENCE CATEGORY CCDP and CLERP Potential Failure Potential Assessment DEGRADATION CATEGORY Pipe Rupture Potential IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making

Change in Risk Calculations IAEA Workshop Change in Risk Calculations EPRI methodology uses a progressively more quantitative evaluation to assess the changes in Risk Qualitative Bounding Simplified Complex WOG methodology calculates the change in Risk based on the change in pipe failure frequency (probability) due to the proposed change in the Inspection program. The calculations are consistent with those performed to calculate the Risk. IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making