Working with Nature: why it matters Presentation on behalf of Jan Brooke Environmental Consultant and UK representative PIANC EnviCom.

Slides:



Advertisements
Similar presentations
Adaptation – learning from case studies for adaptation policies and sustainable development Habiba Gitay World Resources Institute Climate,
Advertisements

MODULE 1: Introduction to Environmental Assessment
The EU Adaptation Strategy
Outermost Regions & Climate Change
Towards More Sustainable and Market-based Payment for Ecosystem Services A Pilot Project in Lijiang, China Lu Zhi.
Strategic Environmental Assessment of Scotland’s Climate Change Adaptation Framework Strategic Environmental Assessment of Scotland’s.
Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
The Ecosystem approach: from theory to application in England Tom Tew Natural England Delivering Nature’s Services.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
The Challenge of Managing Marine Resources Industry's role in managing marine resources Peter Barham. Environmental Consultant.
Britta Bierwagen 1, Roxanne Thomas 2, Kathryn Mengerink 2 & Austin Kane 2 1 Global Change Research Program National Center for Environmental Assessment.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
Professor John Agard UWI Environment in Development.
Vulnerability and Adaptation Assessments Hands-On Training Workshop
LIMITLESS POTENTIAL | LIMITLESS OPPORTUNITIES | LIMITLESS IMPACT Copyright University of Reading IMPACT AND THE SCIENCES Anthony Atkin (Research Impact.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
Corporate slide master With guidelines for corporate presentations LIVING WALES PROGRAMME Tim Jones.
1 Washington Action on Climate Change Hedia Adelsman, Department of Ecology September 25, 2009.
EU Structural and Investment Funds Climate Change and Environmental Protection SWOT Workshop Martin Budd, Hull City Council Nadine Senior, Hull.
Eftec Economics for the Environment Consultancy Using ecosystem services for cost benefit analysis of forestry decisions Roundtable on Cost / Benefit of.
Natural England State of the Natural Environment, Strategic Direction refresh, and Manifesto Dr Helen Phillips, Chief Executive, Natural England.
Understanding „the nexus“ in the MENA region Holger Hoff Stockholm Environment Institute Potsdam Institute for Climate Impact Research Beirut, 22 January.
An Introduction Adapting to Climate Change v 1.00.
Climate Change: Challenges and Opportunities Dr Frank McGovern.
Environment (Wales) Bill Legislation to sustainably manage Wales’ resources.
Workshop on Disproportionate Costs, 10./ Copenhagen Navigation-related issues of affordability and extended deadlines. Consideration of residual.
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
Aims and objectives of our work To understand how climate change is likely to impact upon health and health inequalities in the North West. To make recommendations.
Seite 1 Dr. Ashish Chaturvedi May 11, 2011 ekDRM.
January ‘06Advice to Minister1. January ‘06Advice to Minister2 Understanding Climate Change Climate Change Action Plan Elements Climate Change Action.
Climate change and what it means for South Africa Climate change is not only an environmental challenge but it is the greatest political, social and economic.
A paper presented for the TEM Conference, Sydney, Australia 27 th -30 th August 2006 Presentation by Anne Walker, Risk Manager Massey University New Zealand.
Assessment of Ecosystem Services in Galveston Bay Area Using InVEST Models Greg Guannel, Jorge Brenner, Joe Faries, Anne Guerry, Jennifer Proft, Jess Silver,
UK Foresight Programme - Overview ASSOCHAM Conference: “Calamities: Nature or Human Action? Challenges and Responsibilities”. 5 March 2014, New Delhi.
Philip Wright Head of Climate Change and Air, ERAD Changing our Ways Executive action on climate change.
Purpose of the report Respond to a major gap in awareness and knowledge Overview of a range of best practices Highlight the interrelationships Not a policy.
Building Resilience Well-being of Future Generations Act and the Environment (Wales) Bill Emily Finney – Resilience Policy, Welsh Government.
ENVIRONMENT AND CLIMATE CHANGE PresentationBy Dr. James Kamara United Nations Environment Programme Rotary Meeting Nairobi, Kenya, 18 November 2009.
Eureca – European Ecosystem Assessment Proposal 3 March 2008.
Enhancing Climate Resilience for Coastal Communities Through Education and Mangroves Planting Presented by : Ebrima Dem, National Coordinator Global Unification.
Environmental Impact Challenges to Food Systems A Biodiversity Focus Vicki-Jo Russell AM Conservation Council of SA From Plains to Plates Workshop Presentation.
Benefits of Biodiversity Section 3. Does Biodiversity Matter?  Scientists have offered a number of concrete, tangible reasons for preserving biodiversity.
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
The Natural Capital City – a blueprint for the future? Ecobuild 2014 The Natural Capital City Tool (NCCT) Oliver Hölzinger Consultancy for Environmental.
NZ Forest Policy Project Introductory Comments: ‘Futures’ Analysis Wayne Cartwright.
Title Presenter, Position, Organisation. The Deep South National Science Challenge Te Kōmata o Te Tonga.
Adaptation to Climate Change and the European standardization Madrid, 18 January 2016 Andrea NAM Programme Manager, CEN-CENELEC © CEN-CENELEC
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Agriculture and Food security related challenges Jerome Mounsey Policy Officer Land Use and Finance for Innovation DG Climate Action European Commission.
Evaluating the benefits of SuDS Using CIRIA’s BeST July 2015 Elvetham Heath, Hampshire 1.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
ARIMNet2 Young Researchers Seminar
5. Impact assessment world café: Ecosystem services
AN OVERVIEW ON THE IMPACT OF SCIENCE AND TECHNOLOGY ON ENVIRONMENTAL SUSTAINABILITY Dr. Eko, Maria.O.(MSTAN)
Climate Change & Health
SMART Rivers Conference
The Vision for Sport in Wales
Marine conservation and ecotourism
1 PIANC and the Environment Working WITH Nature
Connecting the South East
Wetlands, Biodiversity and Climate Change
DG Environment, Nature Protection Unit (D3)
River Basin Management Plans
Strategic Appropriate Assessment of Spatial Plans
Communication on Green Infrastructure
Overview of Article 6 procedures under the Habitats Directive
Responding to Changing Climate Washington State Department of Ecology
The EU Strategy for Adaptation to climate change
River Basin Management Plans
Presentation transcript:

Working with Nature: why it matters Presentation on behalf of Jan Brooke Environmental Consultant and UK representative PIANC EnviCom

Background Working with Nature: a new way of thinking 2008 position paper developed by PIANC EnviCom 2008 position paper developed by PIANC EnviCom Latest revision January 2011 Latest revision January 2011 A practical philosophy for developing sustainable navigation infrastructure A practical philosophy for developing sustainable navigation infrastructure

Working with Nature: why do we need a new way of thinking? Requirement to carry out an Environmental Impact Assessment (EIA) of a project is well-established Requirement to carry out an Environmental Impact Assessment (EIA) of a project is well-established However, if ‘the project’ has already been decided, EIA becomes an exercise in damage limitation However, if ‘the project’ has already been decided, EIA becomes an exercise in damage limitation EIA is useful, but as often applied is not therefore sustainable EIA is useful, but as often applied is not therefore sustainable EIA process as often applied also misses many opportunities EIA process as often applied also misses many opportunities

Working with Nature: what is different? Working with Nature requires a subtle shift in our approach to infrastructure projects, to: focus on achieving project objectives in an ecosystem context, rather than assessing consequences of a pre- defined design focus on achieving project objectives in an ecosystem context, rather than assessing consequences of a pre- defined design focus on identifying win- win solutions, rather than simply minimising ecological harm focus on identifying win- win solutions, rather than simply minimising ecological harm

Working with Nature: why does it matter? Population is growing; trade will increase Population is growing; trade will increase Need improved efficiency; need new infrastructure Need improved efficiency; need new infrastructure Natural environment under increasing pressure Natural environment under increasing pressure Aquatic ecosystem goods, services vital to human economic well-being Aquatic ecosystem goods, services vital to human economic well-being Net ongoing loss of biodiversity Net ongoing loss of biodiversity Need to adapt to climate change Need to adapt to climate change Again, current approach is not sustainable Again, current approach is not sustainable

Working with Nature: doing things in a different order 1. Establish (only) the project need and objectives 2. Understand the environment 3. Make meaningful use of stakeholder engagement; identify win-win options 4. Then: prepare project proposals and design to benefit navigation and nature

Working with Nature Do’s and don’t’s Don’t: decide what is required and how it will be delivered Don’t: decide what is required and how it will be delivered Do: acknowledge economic objective; understand ‘need’ Do: acknowledge economic objective; understand ‘need’ Don’t: carry out an EIA on a pre-determined design Don’t: carry out an EIA on a pre-determined design Do: develop understanding of the environment; including physical processes, (eco) systems and climate relevance Do: develop understanding of the environment; including physical processes, (eco) systems and climate relevance Don’t: wait until decisions have been made to consult stakeholders Don’t: wait until decisions have been made to consult stakeholders Do: engage stakeholders early, whilst they can still influence the outcome Do: engage stakeholders early, whilst they can still influence the outcome Do: listen Do: listen Then prepare project proposals and begin design Then prepare project proposals and begin design Be aware: developing/delivering win-win solutions needs more imagination and innovation Be aware: developing/delivering win-win solutions needs more imagination and innovation Transition will take time: perseverance and patience vital Transition will take time: perseverance and patience vital

Meeting biodiversity and ecosystem service objectives Important role for Working with Nature in Supporting achievement of biodiversity targets through enhancement, restoration, and creation Supporting achievement of biodiversity targets through enhancement, restoration, and creation Similar opportunities to support important ecosystem services by acknowledging and enhancing or restoring: Similar opportunities to support important ecosystem services by acknowledging and enhancing or restoring: provisioning services (e.g. food, fuel, water, etc.) provisioning services (e.g. food, fuel, water, etc.) regulatory services (e.g. control of flooding, climate, carbon, disease) regulatory services (e.g. control of flooding, climate, carbon, disease) cultural (e.g. recreation, spiritual services) cultural (e.g. recreation, spiritual services) supporting services (e.g. nutrient cycling; pollination) supporting services (e.g. nutrient cycling; pollination)

Climate change adaptation Certain amount of change is now inevitable Certain amount of change is now inevitable Projected changes in air and water temperatures, seasonal precipitation, sea level rise, wind, fog, extreme events, etc. Projected changes in air and water temperatures, seasonal precipitation, sea level rise, wind, fog, extreme events, etc. Measures are needed to reduce vulnerability and improve resilience of both infrastructure and nature Measures are needed to reduce vulnerability and improve resilience of both infrastructure and nature Potentially important role for Working with Nature in delivering climate change adaptation Potentially important role for Working with Nature in delivering climate change adaptation

Working with Nature: wider benefits 1. Recognise project objectives, establish need not design 2. Understand the environment: biodiversity characteristics; existing ecosystem goods and services; current status and recent trends biodiversity characteristics; existing ecosystem goods and services; current status and recent trends existing pressures (on biodiversity, ecosystem services) existing pressures (on biodiversity, ecosystem services) key climate drivers; projected rates of change; implications for navigation and nature; likely adaptation requirements key climate drivers; projected rates of change; implications for navigation and nature; likely adaptation requirements 3. Use stakeholder engagement to identify opportunities for project to deliver enhancement or restoration of biodiversity and ecosystem goods and services; and to incorporate climate change adaptation 4. Prepare ‘climate-proof’ project to benefit navigation and nature, including biodiversity and ecosystem services

Working with Nature: UK flood defence / navigation dredging case study (1) Establish project need and objectives The toe of an estuarine flood defence (earth embankment) is exposed and eroding, increasing the flood risk locally: need to do something, but what? The toe of an estuarine flood defence (earth embankment) is exposed and eroding, increasing the flood risk locally: need to do something, but what? (2) Understand the environment Until years ago, a wide mudflat and saltmarsh area fronted the defence Until years ago, a wide mudflat and saltmarsh area fronted the defence Now ‘coastal squeeze’: the intertidal area is ‘squeezed’ between the fixed line of the defence and high water as a result of relative sea level rise linked to climate change Now ‘coastal squeeze’: the intertidal area is ‘squeezed’ between the fixed line of the defence and high water as a result of relative sea level rise linked to climate change

Flood defence / navigation dredging (2) (2) Understand the environment (continued) Dredged arisings from the nearby navigation channel are disposed offshore: out of the system Dredged arisings from the nearby navigation channel are disposed offshore: out of the system Numbers of overwintering bird using the foreshore for feeding are now much reduced Numbers of overwintering bird using the foreshore for feeding are now much reduced Local catches of sea bass declined as the saltmarsh was lost; sea anglers no longer visit the area Local catches of sea bass declined as the saltmarsh was lost; sea anglers no longer visit the area Saline intrusion threatens the viability of agriculture behind seawall Saline intrusion threatens the viability of agriculture behind seawall

Flood defence / navigation dredging (3) (3) Stakeholder engagement Confirms loss or reduction of regulatory (wave attenuation); provisioning (fish nursery in saltmarsh); supporting (food resource for wading birds); and cultural (recreational fishing) ecosystem services Confirms loss or reduction of regulatory (wave attenuation); provisioning (fish nursery in saltmarsh); supporting (food resource for wading birds); and cultural (recreational fishing) ecosystem services Identifies win-win option of managed realignment supported by beneficial use of dredged sediment - an alternative to the conventional engineering solution of concrete revetment or steel sheet piling Identifies win-win option of managed realignment supported by beneficial use of dredged sediment - an alternative to the conventional engineering solution of concrete revetment or steel sheet piling (4) Prepare project proposals to benefit navigation, nature and local economy and benefit navigation, nature and local economy and support and enhance lost ecosystem services and support and enhance lost ecosystem services and ensure sustainability in the face of climate change ensure sustainability in the face of climate change

Key conclusions Working with Nature, particularly doing things in a different order ………establish need, understand environment, engage stakeholders, then prepare project ……… enables a move from ‘damage limitation’ to environmental gain; from reactive to proactive, adaptive management Working with Nature, particularly doing things in a different order ………establish need, understand environment, engage stakeholders, then prepare project ……… enables a move from ‘damage limitation’ to environmental gain; from reactive to proactive, adaptive management EIA still has a role, but Working with Nature should set the scene for an EIA by identifying win-win alternatives which meet the project objectives but also benefit the wider environment EIA still has a role, but Working with Nature should set the scene for an EIA by identifying win-win alternatives which meet the project objectives but also benefit the wider environment Benefits of adopting the Working with Nature philosophy; of changing our way of thinking; extend also to ecosystem services and climate change adaptation Benefits of adopting the Working with Nature philosophy; of changing our way of thinking; extend also to ecosystem services and climate change adaptation

Thanks for listening! PIANC Working with Nature website: Contact Jan: