WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines.

Slides:



Advertisements
Similar presentations
Specific hardware and software products identified in this report were used in order to perform the evaluations described. In no case does such identification.
Advertisements

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
1 The Five Parts of an Information System
Recap of IS214. Placing this course in context Creating information technology that helps people accomplish their goals, make the experience effective,
The SMS project WP 5: Integration ICCS. Integration’s Role Planning: –Plan for integration of software and hardware components –Define testing needed.
Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month.
GIS in K-12: why, how, and when to use GIS in Education Presented by Jung Lee, Ph. D Richard Stockton College of NJ April 16, 2001.
Lecture 9 – Database Design
1 SOFTWARE LIFE-CYCLES Elements and Definitions. 2 Requirements System Design Detailed Design Implementation Installation & Testing Maintenance The WATERFALL.
Conceptual Overview 7 step design Chapter 4 Database Design for Mere Mortals.
Computer Software By: Richard Tyler Walker. The Two Kinds of Software Are: Systems Software, which includes operating systems, utilities, and device drivers.
Unified Modeling Language
Final Design and Implementation
Succeeding as a Systems Analyst, Roles Class 2. First, some definitions Systems Development Specifying in detail how the many components of the information.
What is Business Analysis Planning & Monitoring?
Software Project Management
Ekrem Kocaguneli 11/29/2010. Introduction CLISSPE and its background Application to be Modeled Steps of the Model Assessment of Performance Interpretation.
Formal Definition of Collaborative Spaces Sergio Arzola-Herrera Josefina Guerrero-García Juan Manuel González-Calleros Claudia Zepeda-Cortés Facultad de.
By, David Anderson.  Determine team members to collaborate on assessment.  Create a written AT assessment plan:  Determine assessment questions  Expected.
Presentation Outline Motivation Basic concept Bakground Futur work Conclusion Nesrine MEZHOUDI User Interface Adaptation.
Introduction to SDLC: System Development Life Cycle Dr. Dania Bilal IS 582 Spring 2009.
Changing Perspective From Structured to Object-oriented.
+ Defining “Quality” Software Catherine Dwyer Spring 2012.
1 MultiCom, a platform for the design and the evaluation of interactive systems. MultiCom, a platform for the design and the evaluation of interactive.
SDLC: System Development Life Cycle Dr. Dania Bilal IS 582 Spring 2007.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
PISTE – Progress Report Thanos M. Demiris, PhD INTRACOM S.A.
Scalable Semantic Product Data Stream Management for Collaboration and Decision Making in Engineering Project WP17: Demonstration and evaluation.
Lecture 7: Requirements Engineering
Example Template for Project Presentation
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Test Management Provides a rich and configurable global web platform for implementing a software development life cycle process with collaboration.
Software Production Chapter 2: Identifying Software Development Activities.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Riga Technical University Department of System Theory and Design Usage of Multi-Agent Paradigm in Multi-Robot Systems Integration Assistant professor Egons.
PRJ566 Project Planning & Management Software Architecture.
Computer Software Types Three layers of software Operation.
Computer Components: Software Computer Technology.
Task 2.1: Software Specifications Markus Kissler-Patig.
Smart Home Technologies
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Work done: Polito_DAUIN Analysis of the AR technologies: sw & hw Analysis of the state-of-the-art of AR-based applications Definition of a questionnaire.
BD FACS CAP™ Profile the expression of surface proteins specific to a cell type –Currently 189 antibodies –Produces data similar to a “protein chip” –Expect.
고려대학교 산업경영공학과 IMEN 315 인간공학 3. DESIGN AND EVALUATION METHODS.
TASK 3.3 Task 3.1: Development of AR-based maintenance platform (M7-M27) Task leader: POLITO Partners involved: WIRES and TEKS Objective of this task is.
CCT 333: Imagining the Audience in a Wired World Class 9: Scenarios and Requirements.
1 SYS366 Week 1 - Lecture 1 Introduction to Systems.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
POLITECNICO DI TORINO Authors: A. Sanna, S. Spriano, L. Zichella Date: January 2014 M6 meeting 15 th -16 th January 2014 FoF.NMP
Disaster Recovery Planning (DRP) DRP: The definition of business processes, their infrastructure supports and tolerances to interruptions, and formulation.
CHIMER - Children Heritage: Interactive Models for Evolving Repositories 1.
Crew-centered Design and Operations of ships and ship systems CyClaDes Workshop ( )
WP5 – Infrastructure Operations Test and Production Infrastructures StratusLab kick-off meeting June 2010, Orsay, France GRNET.
HCC 831 User Interface Design and Evaluation. What is Usability?
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
WP4 Models and Contents Quality Assessment
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
Information and documentation media systems.
25/27 François BORDES CEO
CLINICAL INFORMATION SYSTEM
Systems Development Life Cycle
How and where does the diamond industry operate ?
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
User Interface Design and Evaluation
LOSD Publication Deirdre Lee
How and where does the diamond industry operate ?
1. INTRODUCTION.
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
Presentation transcript:

WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.5 Guidelines for R&M design practices, including DfE (Design for Environment) T1.1:  Analysis of the state-of-the-art (hardware and software AR technologies)  Identification of users requirements and use cases (in collaboration with WIRES) T1.5:  Definition of guidelines for the implementation of the AR-based platform

WP1: DISAT involvement Polito_DISAT is involved in WP1 for 8 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.2 Life data collection and analysis  T1.4 Life-cycle costing prediction and assessment  T1.5 Guidelines for R&M design practices, including DfE T1.1:  Identification of users requirements (in collaboration with WIRES) T1.2:  The use of diamond wires in stone cutting machines T1.4:  Life-cycle costing prediction and assessment focusing on materials T1.5:  Design for Environment (DfE) procedures focusing on materials

WP1: DIATI involvement Polito_DIATI is involved in WP1 for 7 MMs Tasks:  T1.1 Review of end-user requirements and application scenarios  T1.2 Life data collection and analysis  T1.4 Life-cycle costing prediction and assessment  T1.5 Guidelines for R&M design practices, including DfE T1.1:  Analyzing stone materials in their interaction with the cutting system T1.2:  Collecting the data during the stone cutting T1.4:  Assessing operating conditions T1.5:  Guidelines for the best use of the cutting system