Bridge Church Solar Team August 4 th, 2015 Bridge Church Solar PV Opportunity Analysis.

Slides:



Advertisements
Similar presentations
Medford Aquatic Center Plan for Energy Efficiency and Solar resources.
Advertisements

Prince of Peace Solar Panel Proposal B. Johnson 1 New Solar Panel Proposal for Prince of Peace Nov 8 Congregational meeting is set to hear plans to buy.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Town of Hopkinton Solar Energy Project Proposal March 2013 Presented by Hopkinton Sustainable Green Committee.
VVC Facilities Report June 2012 Strategic Planning For Student Success.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
Renewable and Energy Efficiency Projects RFP to Implementation.
April 25–27, 2005 Phoenix Civic Plaza/Hyatt Regency Phoenix Phoenix, AZ NCMA World Congress 2005 “Prime Time: Contract Management at the Core of the Enterprise”
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Evidence on Tackling Hard to Treat Properties Prof. Sue Roaf, Heriot-Watt University Dr. Keith Baker, SISTech Ltd Andrew Peacock, Heriot-Watt University.
1 State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Welcome and Introductions CoServ Presentation & Member Input.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
A PRESENTATION TO THE LODI UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION Prepared by Facilities and Planning August 7, 2012.
CSI Phase II: R Solar for Affordable Housing CPUC Intent: Set aside a “minimum” of 10% of budget $216.8M Solar Economics Less Compelling to CARE-Households.
Madison Elementary School District Solar Purchase Power Agreement 12/04/12 Extraordinary Learning for All.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Total LED Lighting Solutions Contact Us | | Cammera Security | | Unit 2 | Norwood.
Solar System Life Maintenance Call in number: Meeting number: * * August 3, 2009.
© 2013 Venture Lighting International 1 ANNOUNCING Project Financing To Close More Deals.
SOLAR PV PROJECT REDDING AIRPORT Rod Dinger, A.A.E Support Services Director/Airport Manager Barry DeWalt Assistant City Attorney City of Redding.
Because the SUN never increases its rates. Tier 4 $0.39 per kWh Tier 3 About 330 kWh’s At $0.35 each Tier 2 About 100 kWh’s At $0.18 each Tier 1 About.
Solar panel Mathieu and thomas. What is a solar panel Solar panel refers either to a photovoltaic module, a solar hot water panel, or to a set of solar.
Team Mulberry Andrew Smith, Joseph Entler, Bill Miller.
Benefits Of A Green Home Main Menu. Navigation/Menu Quit.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Parking Lots 10 & 11. Child Care Parking Lot #12.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
PURDUE’S SOLAR ENDOWMENT UTILITY SCALE SOLAR VALUE.
Net Metering Implications for Community Shared Solar and Security Exchange Commission Considerations.
PV Panel Investment. Overview  Solar Global Trends and Growth  Solar Process and Net Metering  Sample System Breakdown  Personal System Details.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
Solar Evaluation Committee Report to the Master Planning Committee 9 December 2015.
LOW INCOME WEATHERIZATION PROGRAM LOW INCOME WEATHERIZATION PROGRAM (LIWP) Updated April 19, 2016.
WSSC Solar PV PPA Phase 2 Rob Taylor Energy Manager May18, 2016.
Lee Lenox● 13.9 MW ● Lee & Lenox, MA. GREEN POWER.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
Presentation to the UUCF Coordinating Team October 5, 2016
Union Church Path to Net Zero Energy (10 Years of Progress)
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Next Phase Solar Project Update
Solar information Session
In 2015 our congregation signed the Interfaith Power and Light Paris Pledge to reduce our carbon footprint by 50% by 2030, and aim to reduce by 100% —to.
How to get paid by having Energy Storage
PV SOLAR PROJECT OPPORTUNITIES
Phase 3 Solar Feasibility Study Findings and Recommendations
Photovoltaic Systems Engineering Session 27
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Photovoltaic Systems Engineering Session 26
We create value for our clients and communities by providing innovative energy efficient solutions. By reducing energy use and utilizing renewable energy,
Bridging State Policy to Local Implementation
MAKING CENTS OF ENERGY Aggregation Model and Cost Segregation Bobby Clark, Co-founder Midwest Clean Energy Enterprise, LLC July 26, 2017.
Island Energy Advisory Committee Board
Rose Drive Friends Church Solar Project Proposal
Solarize Your School School Name:.
Park Encinitas HOA Solar Project Proposal
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Island Energy Advisory Committee Board
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Photovoltaic Systems Engineering Session 22
Photovoltaic Systems Engineering Session 23
Energy Management PPKSE 06/07 SAA.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Context and Information for Zero Carbon Church Discussion
Presentation transcript:

Bridge Church Solar Team August 4 th, 2015 Bridge Church Solar PV Opportunity Analysis

Project Overview Annual PG&E electric costs +/-$95,000 and going up Objective is to materially lower electric bill Use savings for ministry and other purposes Three PG&E meters Sanctuary building All other buildings on campus Parking lot lights Net Energy Metering Aggregation (NEM-A) One array, one interconnection, three meters offset Project sizing between 115kW-DC and 185kW-DC Dependent on energy efficiency upgrades

Things to Consider PG&E rate structures A6  Good w/o solar; great with solar May soon be limited Energy efficiency improvements HVAC upgrades Lighting upgrades System sizing risks Too Large – Give PG&E free energy Too Small – Less protection against PG&E’s rising costs

Reasons to Look at Solar PV Now PG&E net energy metering (NEM) rules are set to change by Q or mid-2017 at the latest. New NEM rules will be less favorable for exported power. Projects completed before NEM rules change can “grandfather” on existing NEM rules for 20 years. Changes to Investment Tax Credit (ITC) at end of 2016 Reduces from 30% ITC to 10% Bridge Church should aim to complete solar project by Q2 2016

Next Steps Determine PV system size based on risk sensibilities Smaller system – lower cost, lower risk, less reward Larger system - greatest reward if usage remains constant Complete energy audit of selected components Review interactive model/cash flow documents Complete PV system RFP bid package Gather proposals from reputable solar vendors for project Secure financing Vendor selection Contract negotiation and execution Project implementation

PV System Location Considerations Roof location Insufficient space for anticipated system size Additional costs (structural and roof replacement) No secondary benefit Courtyard location Insufficient space for anticipated system size Substantive additional costs for architectural blending Parking lot location (recommended) Least expensive option South lot location minimizes aesthetic concerns Encourage parking at south end over north entrance