Enhanced Flight Following. Major Concepts  “Second Opinion”  Positive Flight Following  Resource for Captain.

Slides:



Advertisements
Similar presentations
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
Advertisements

01/14/01 S2K+1 Field Training Spring /14/01 FAR 121 Air Safety PAD Operational Responsibility shared by: –P ilots –A TC –D ispatchers Enhancing.
Work load and responsibilit y npor. Ing. Miroslava Šimonová.
Daily problems in the job Responsibilities and duties of ATCOs Jan Janků.
#4407. When may ATC request a detailed report of an emergency even though a rule has not been violated? A- When priority has been given. B- Anytime an.
Scottsdale Airport Operations Plan Photo by Justin Lawrence.
Instrument Ground Training Module 4 & 5
Lead Time Aviation Verification Onset and Cessation of Ceiling and Visibility Flight Category Conditions (IFR, MVFR, VFR) at FAA Core Airports NWS Aviation.
“Established on RNP” Jeff Williams – IATA
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Wings of Freedom TWO – WAY RADIO FAILURE. Wings of Freedom REFERENCES FAR Flight Information Handbook, Section A AIM, Section Individual.
Air Law 1.05 Airspace References: FTGU pages TC AIM.
References: FAR Part 61, Part 91, AIM
IFR Emergencies.
Normal and Emergency Communication Procedures
Federal Aviation Regulations
Sep 2012 Lesson 3.4 Air Law Air Traffic Rules. Reference From the Ground Up Chapter 5.1: Air Traffic Rules and Procedures Pages
A- Class B airspace to 10,000 feet MSL.
Working hours, Responsibilities, Everyday problems Author: Cpt. Lenka Klete č ková.
AIRSPACE What’s old –What’s new!.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Office of Aviation Safety Controlled Flight Into Terrain Learjet 35A San Diego, California October 24, 2004.
Parts Part 1 – Definitions/Abbreviations Part 21 – Certification Procedures for Products/Parts Part 43 – Maintenance, Preventative Maintenance, Rebuilding,
VFR FLIGHT IVAO Tunisia Division.
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Use Case Diagram. # 1 Provide Pre-flight Services Actors: Pilot, External Data Providers, FBO, FAA Goal Level: User Level Main Success Scenario 1.Client.
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Lecture 3: Air Traffic Control Tower
Straight-and-Level Aviation, LLC Instrument Proficiency Check FAR requirements IPC components Q&A.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
The Aircraft Dispatcher “One stop shopping” source of information for the pilot.
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
IFR Lost Communications I Can’t Hear You Procedures.
Office of Aviation Safety ENG Safety Equipment and Visual Markings Airworthiness Presentation.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Navigation.
Radar.
National Airspace System
UPS ADS-B/TCAS B-757/767 Installation ASAS Thematic Network Third Workshop April 19,2004 Captain Jim Walton United Parcel Service Advanced Flight Department.
1 Air Tour Operating Authority (ATOA) Reporting System What It Is:  A web based system that enables its users to report, track, and manage air tour operating.
VHF Frequency Data Transmitter. Aircraft On-board Receiving System.
FAA Aviation Weather Research Program (AWRP) Aviation Weather Forum: Opportunities for Implementation Panel 1 – Product Development July 25, 2000 Gloria.
Safer Skies Personal Equipment Chart Computer & plotter Flight logs Flight plan form FAR/AIM AFD.
Captain Chris Iddins. Pilots may not need an instrument rating if I. They fly in familiar uncongested areas II. stay continually alert to weather developments.
Mr. Lagomarsino Money Power with Technology Applications.
Presented to: By: Date: Federal Aviation Administration Rotorcraft VFR Part 91 Operations Pilot Certification & Operating Rules Aircraft Electronics Association.
Workshop on preparations for ANConf/12 − ASBU methodology
Dr. Dennis Vincenzi Human Factors Issues Dr. Dennis Vincenzi
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
SWIM in NSS CONOPs 2023 Wellington 29 September 2016.
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
AIR TRAFFIC ONTROL.
MGMT 203 Airports, Airspace, and Air Traffic Control Management
Workshop on preparations for ANConf/12 − ASBU methodology
Airports, Airspace, & Radio Communication
FAA Flight Standards AFS-430 Summer FPAW 2016
1.05 Airspace References: FTGU pages TC AIM
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Flight Standards AFS-430 Fall FPAW 2016
Controlled Flight Into Terrain Learjet 35A
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Bringing Large Commercial Airport Capabilities to Your Local Community
“Established on RNP” Jeff Williams – IATA
Air Traffic Control System
ATC Clearances Chapter 3 Section C.
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

Enhanced Flight Following

Major Concepts  “Second Opinion”  Positive Flight Following  Resource for Captain

Go/No Go Decision Making  Weather  Airports  Aircraft  IFR Navigation Capability  Pilot  Load  Trip Arrival Confirmation

Go/No Go Decision Making  Decision is consensus between Captain and “Releaser”  Decision reflects company management’s philosophy  Not intended to diminish Captain’s FAR 91 authority

Flight Following Tools  FAA Flight Plans  IFR flights when feasible  VFR Radar Traffic Advisories  Internet Computer Flight Tracking  Contact via ATC in urgent situations

Beyond Operational Control  Top Management Philosophy  Customer Pressure on Pilots  Path to Upper Management Advice

Senior Management Tools  24–Hour Availability  Access to Necessary Data

Flights During Non-Business Hours  Responsible Management Rep –Assigned –Equipped –Available

Summary