PUBLIC WORKSHOP PRESENTATION March 22-24, 2011 Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee Bay.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
Advertisements

Airport planning.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Concurrent Plan Updates?. Plan Update Requirements Cost-Affordable Transportation Plan Horizon Year Due December 2014 Hillsborough County Comprehensive.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
European Commission Slot allocation at Community airports Infrastructures and Airports Unit Klaas Pel.
1 ERC Anya Boyd Energy Research Centre University of Cape Town 4th March 2011 ERC Response to the NCCRGP.
PROJECT INFORMATION PUBLIC OUTREACH WHO IS INVOLVED?
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Fifth Public Meeting Review of the Draft Noise Compatibility Program September 18, 2002 Reid-Hillview Airport FAR Part 150 Noise and Land Use Compatibility.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Aviation Fuels Forecast Methodology Joint Lead Commissioner Workshop on Inputs and Assumptions for Transportation Energy Demand Forecasts March 19, 2015.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Route Planning and Evaluation
URBAN SERVICE INNOVATIONS Public Transit : The One Bay Area Project May 15 th, 2013 PA 800 Robin Havens.
THE SUSTAINABILITY OF AIRPORTS
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Presentation to the Central Lane MPO Policy Committee March 08, 2012 Oregon Sustainable Transportation Initiative Statewide Transportation Strategy Statewide.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n ANALYSIS OF BARRIERS TO THE UTILITY OF GENERAL AVIATION TROY D. DOWNENR.
EU Climate Action EU – Central Asia Working Group on
Starting the Planning Process & Assessing Needs HSC 489.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Title 36pt Georgia Subtitle 24pt Georgia Italics Presentation Information Arial Narrow 24pt Survey of Aviation Emissions Management Measures Ted Milczarek.
Draft Transportation 2035 Plan for the San Francisco Bay Area ACT February 24, 2009.
November 20, 2009 ALTERNATIVE STRATEGIES FOR ACCOMMODATING FUTURE AVIATION DEMAND Prepared for: Regional Airport Planning Committee Prepared for: Regional.
TEAM 1 – Airbus AXX Future of Air Transportation and Possible Air Response.
CORNERSTONES TO MANAGING INFORMATION TECHNOLOGY. WHY SERVICE LEVEL AGREEMENTS? Customer Perceptions---Fantasy? Customer Expectations---Reality Customer.
Holly Kunz Rebecca Vredenburgh Methodist University The Impact of Aviation on the U. S. Economy.
Holly Kunz Rebecca Vredenburgh Methodist University The Impact of Aviation on the U. S. Economy.
Transportation Planning Process Freight Transportation Planning Workshop July 11, 2001.
VALUES WORKSHOP Anne Arundel County | April 26, 2010.
Review of the 2000 Regional Airport System Plan — Part2 October 27, 2006.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
September 25, 2009 BASELINE CAPACITY AND DELAY ANALYSIS Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee.
1 Regional Parking Strategies for Focused Growth and Climate Protection Jeffrey Tumlin, Principal.
June 26, 2009 REGIONAL AIRPORT SYSTEM PLAN ANALYSIS Study Update Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning.
Who Does What Susan Handy TTP282 October Players Government Industry Citizens/ Consumers.
Federal Aviation Administration NextGen Environmental Management System (EMS)
NextGen Next Generation Air Transportation System
Airport Noise Compatibility Study Group Navigation Committee AIRPORT NOISE COMPATIBILITY PROGRAM Louisville and Jefferson County FINDINGS AND RECOMMENDATIONS.
1 REAL-TIME INTER-MODAL SUBSTITUTION (RTIMS) AS AN AIRPORT CONGESTION MANAGEMENT STRATEGY Mark Hansen Yu Zhang University of California Berkeley.
JUNE 27, 2013 ARB INFORMATIONAL UPDATE: ASSOCIATION OF BAY AREA GOVERNMENTS’/ METROPOLITAN TRANSPORTATION COMMISSION’S DRAFT SUSTAINABLE COMMUNITIES STRATEGY.
Presented to: Emerald Coast Transportation Symposium By: Terry Washington, P.E. Regional Capacity Manager – FAA Southern Region Airports Division Date:
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
1 A Combined Quantitative and Qualitative Approach to Planning for Improved Intermodal Connectivity at California Airports (TO ) (Quarterly Meeting)
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Governance and Institutional Arrangements What they have to do with Regional Water Planning (RWP)
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
1 SOLVING THE PROBLEM AVIATION FOR THE FUTURE. 2 SCRAA BOARD OF DIRECTORS County of Los Angeles - Supervisor Don Knabe County of Riverside - Supervisor.
Collaborative Decision Making Module 5 “The Collaborative Environment”
GREENHOUSE GAS EMISSIONS INVENTORY
2017 SCORT Conference Washington, DC
Pierre Regional Airport Master Plan Update
Presentation transcript:

PUBLIC WORKSHOP PRESENTATION March 22-24, 2011 Prepared for: Regional Airport Planning Committee Prepared for: Regional Airport Planning Committee Bay Conservation Development Commission Association of Bay Area Governments

Study Objectives and Critical Questions Evaluate Strategies for Accommodating the Region’s Long-Term Aviation Demand Without Building Additional Runways at the Primary Airports –What are the capacity limits of the primary Bay Area airports? –When are these limits likely to be reached? –Which Scenarios (including alternative modes) offer the greatest potential to allow the region to efficiently accommodate future aviation demand? Involve Stakeholders and the Public to Aid in Building a Regional Consensus Develop a Vision and Implementation Plan for the Region’s Aviation System –Includes study Recommendations –Addresses institutional issues

Topics Introduction Study Vision and Goals Major Airport System Planning Issues Results of Scenarios Analysis Recommendations

Vision Bay Area passengers will have a choice of more flights (or trains) at more airports There will be fewer weather-related flight delays Airport noise impacts on the regional population will be minimized Adverse air quality and climate change impacts will be minimized Surface travel to airports will take less time The airport system will support regional economic expansion

Each Scenario is Measured Against 7 Goals Reliable RunwaysCan we reduce flight delays and passenger inconvenience? Healthy EconomyCan the region serve future aviation demand and support a healthy economy? Good Passenger ServiceCan we provide better service to the region’s major air travel markets? Convenient AirportsCan we maintain or improve airport ground access times and distance? Climate ProtectionCan we decrease Greenhouse Gas (GHGs) emissions from aircraft and air passengers traveling to airports? Clean AirCan we decrease air pollution from aircraft and air passengers traveling to airports? Livable CommunitiesCan we avoid increasing the regional population exposed to aircraft noise?

Baseline Forecast of Bay Area Aviation Demand Forecast Percent Change and Annual Activity Activity MP101 MP 610K807K 1.4M2.7M 45K63K 75K117K

Key Planning Issues Delay Problems at SFO –Due to increased flights and poor weather Increased Airport Noise Impacts –Due to increased flights and population growth SFO and SJC Growth in air emissions (GHGs/criteria pollutants) –Due to increased flights and air passenger trips to airports

Six Scenarios were Initially Analyzed to Serve Long-Range Demand Airport Traffic Redistribution –In response to delays at SFO, domestic traffic shifts from SFO to OAK and SJC through natural market forces Internal Alternative Airports –Some Bay Area passengers are served at secondary airports in the Bay Area region (Sonoma County, Travis AFB, and Buchanan) reducing demand at the primary airports External Alternative Airports –Service development at Sacramento, Stockton, and Monterey reduces passenger demand originating from outside the Bay Area region High-Speed Rail –Proposed rail service to Southern CA diverts air passengers from planes to trains New ATC Technology –FAA’s NextGen technologies create more capacity during bad weather, reducing delays Demand Management –Demand Management strategies at SFO reduce small aircraft operations during the most delay prone times of the day

Potential Solutions for Serving 101 MAP in 2035 – Combined Scenarios A and B  Modest ATC Technology Improvements  Demand Management  Potential High-Speed Rail  Greater Use of Sonoma County Airport Scenario A/B Features: Forecast Passengers by Airport and Scenario 2035

Scenario Effectiveness versus Goals

Potential Solutions for Serving 129 MAP in 2035 (High Forecast) – Combined Scenario C  Full ATC Technology Improvements  Aggressive Demand Management  High-Speed Rail  Greater Use of Sonoma County Airport  Greater Use of External Airports Scenario C Features:

Reliable Runways Goal – SFO Average Aircraft Delays for Major Scenarios Average Aircraft Delays at SFO (Minutes) Acceptable Delay

Livable Communities Goal – Scenario B Community Noise Exposure versus ,837 SFO 9,360 SJC Population Inside 65 CNEL Noise Contour 2007 vs Scenario B Population Inside 65 CNEL Noise Contour 2007 vs Scenario B Notes: Population projections are based on ABAG’s 2009 Focus Growth projections and Scenario B includes projected increase in flights. No population exposure at OAK. Some residences in the 65 CNEL contours for SFO and SJC have already been soundproofed Noise Contour with 2035 Projected Population Scenario B Noise Contour with 2035 Projected Population

SFO Noise Exposure Contours – 2007 Existing, 2035 Baseline, and 2035 Scenario B

SJC Noise Exposure Contours – 2007 Existing and 2035 Scenario B

OAK Noise Exposure Contours – 2007 Existing and 2035 Scenario B

Overview of Issues and Recommendations Recommendations reflect major issues that have been discussed during the study Recommendations are consistent with RAPC’s advisory role Recommendations also address institutional issues

Issues and Recommendations, 1-3 #1: Changing conditions that alter long-range planning assumptions –Track changes in forecasts, runway congestion –Use regional forecasts for airport planning #2: Lack of regional mechanisms to influence airline decisions about airport service –Regional Plans support Scenario B –RAPC should explore ways to engage airlines –Regional marketing program for OAK/SJC #3: Difficulty implementing airport-originated demand management programs –Future SFO airline agreements should not preclude congestion pricing –Bay Area may need to advocate for FAA controls if SFO’s are not enough

Issues and Recommendations, 4-5 #4: Uncertainty regarding the timing and effectiveness of new ATC technologies –FAA should provide regular updates to RAPC –RAPC should engage in advocacy for NextGen funding and Bay Area applications –Form coalitions with other regions experiencing major runway congestion problems #5: Uncertainty regarding future HSR Plans and effectiveness of HSR –Periodically review information on effectiveness of HSR in diverting air passengers –Encourage discussions between HSR Authority and airlines regarding joint ticketing arrangements

Issues and Recommendations, 6-7 #6: Uncertainty regarding future role of some alternative airports –If demand increases faster than forecasted, RAPC may wish to update feasibility study for Travis AFB –Protect aviation capability of Moffett Federal Airfield (possible reliever general aviation airport or limited air cargo roles) –Continue to involve Sacramento, Stockton, and Monterey airports in our Bay Area planning process #7: Projected increase in community noise exposure ( ) –Airports should confirm long-term noise trends from this study –Re-examine Focus Growth projections to lower regional population noise exposure –Given SFO’s projected noise problem, new approaches may be needed (e.g., look at shifting more departures to Runway 1 for takeoff over the Bay; would require runway lengthening and some Bay fill)

Options for Institutional Arrangements Bay Area airports ownership and operation Coordination will be necessary for many strategies –Demand management –Redistribution –Air Traffic Control –High-speed rail Options to achieve a more coordinated approach –Regional Authority –Joint Powers Authority –Regional Airport Planning Committee

Appendix

San Francisco (SFO): Airfield Layout The preferred configuration is wingtip-to-wingtip arrivals to 28L & 28R with dual departures on 01L & 01R. SOIA approaches provide dual arrival runway capacity on 28L & 28R down to weather minimums of 2100 ft ceiling and 4 nm visibility. –Used < 2% of the time Capacity is substantially diminished during IFR and East flow conditions.

Issues and Recommendations, 8-9 #8: Projected increase in criteria pollutants and GHGs –Have BAAQMD provide RAPC with annual updates of aviation emissions to determine trends –RAPC should monitor legislation that would reduce aviation emissions and take supporting positions as appropriate #9: Effectiveness of RAPC as a regional aviation planning body –Develop MOU with Bay Area airports to define level of financial and staff support for RAPC’s work program –Seek further FAA support for this program –Recommendations from Part 2 of Institutional Analysis (to be added)

Future Work Scope Forecast Tracking System Multi-Region Air Passenger Survey Congestion Tracking System Regional Airspace Study Long-term Noise Mitigation Study (SFO) Focus Growth Review Monitor Demand Management approaches at other airports Institutional Analysis Follow-up High Priority

Forecast Tracking System Track actual traffic against forecast Determine what is driving the difference between actual and forecast Assess when the forecast level of 101M passengers will be achieved 4% Below Base Case 101M Passengers Actual vs. Forecast Bay Area Passenger Demand (Illustrative Example)

Future Work Scope (cont’d) Medium Priority Regional Airport Marketing Program Airport Pricing Analysis Travis AFB-Updated Feasibility Study (low/medium) Low Priority New Airline Route Study (OAK/SJC) Reliever Airport Strategy Moffett Federal Airfield-General Aviation Study Regional Airport Economic Benefits Study