Longitudinal HOM power estimations for pulsed beams.rev W. Weingarten 31 May 20101SPL Cavity WG Meeting.

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
March 30, 2000SPIE conference, Munich1 LGS AO photon return simulations and laser requirements for the Gemini LGS AO program Céline d’Orgeville, François.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
DESIGN OF A 7-CELLS, HOM DAMPED, SUPERCONDUCTING CAVITY FOR THE STRONG RF FOCUSING EXPERIMENT AT DANE David Alesini, Caterina Biscari, Roberto Boni, Alessandro.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Freq [GHz]Q0Q0 R/Q [Ω]±Voltage [kV]
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
Update on Crab Cavity: Impedance (at fundamental), RF noise, operational scenario P. Baudrenghien, R. Calaga, T. Mastoridis March 21 st, th HiLumi.
Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs A.Farricker 1, R.M.Jones 1, R.Ainsworth 2 and S.Molloy 3 1 The University.
Jean-Luc Biarrotte, SPL HOM Workshop, CERN, June 25-26, A few longitudinal BBU simulations (in the SPL case) J-Luc Biarrotte CNRS, IPN Orsay.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
HOM Studies: Beam Dynamics, Cavity-to-cavity coupling, multipacting, and field emission.
Longitudinal HOM damping estimations for SPL cavity. status W. Weingarten 26 July 20101SPL Cavity WG Meeting.
POWER REQUIREMENTS FOR THE LHC HARMONIC CAVITIES WITH THE FULL-DETUNING SCHEME P. Baudrenghien, T. Mastoridis, CERN BE-RF 2nd LHC Harmonic Cavity meeting,
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Tze-Wei Liu Y-C Hsu & Wang-Yau Cheng
GDE 4/Mar/20081 Lorentz Detuning Calculation for the transient response of the resonant cavity Introduction “Two modes” model Method of the.
HOM Experiences at the SNS SCL SPL HOM Workshop CERN June 26, 2009 Sang-ho Kim SNS SCL Area Manager SNS/ORNL.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Beam tube damping estimations for SPL cavity cont’d W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
V f λ.
Multi-bunch acceleration in NS-FFAG Takeichiro Yokoi (Oxford University)
Marcel Schuh CERN-BE-RF-LR CH-1211 Genève 23, Switzerland 3rd SPL Collaboration Meeting at CERN on November 11-13, 2009 Higher.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Project X Collaboration Meeting, April 12-14, 2011 Spallation Neutron Source facility at Oak Ridge National Laboratory HOM Couplers for Project X: Are.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
MEW Meeting 05/06/14 Aaron Farricker 1. Effect Of HOMs Near Machine lines HOMs on or near machine lines get resonantly excited. Modes in real cavities.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
HOMs in high-energy part of the Project-X linac. V. Yakovlev, N. Solyak, J.-F. Ostiguy Friday 26 June 2009.
CEPC APDR Study Zhenchao LIU
Longitudinal impedance of the SPS
Higher Order Modes and Beam Dynamics at ESS
A frequency choice for the SPL machine: Impact on hardware
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
704 MHz BNL3 cavity as an option for CEPC/FCC
HOM power in FCC-ee cavities
800 MHz 2-Cavity module simulations
Work summary in 2016 Hongjuan Zheng CEPC SRF WG Meeting
V f λ.
Superbeams with SPL at CERN
Overview Multi Bunch Beam Dynamics at XFEL
Implications of HOMs on Beam Dynamics at ESS
Analysis of Multi-Turn ERLs for X-ray Sources
Analysis of Multi-Turn ERLs for X-ray Sources
Status of HOMS Spectra Measurements in 1.3 GHz Cavities for LCLS-II
SPS-DQW HOM Measurements
CEPC Ring RF System Jiyuan Zhai (IHEP) Workshop on the Circular Electron Positron Collider Rome, May 25, 2018.
Accelerator Physics Particle Acceleration
The SPL-based Proton Driver at CERN
CEBAF Pulsed Operation for JLEIC Electron Injection
Review of the Modal Analysis of the MiniBooNE Horn MH1
ESRF Experimental Contribution Towards Working Group Introduction
Presentation transcript:

Longitudinal HOM power estimations for pulsed beams.rev W. Weingarten 31 May 20101SPL Cavity WG Meeting

On longitudinal HOM excitation for pulsed beams (as in high intensity proton drivers) 1/4 31 May 2010SPL Cavity WG Meeting2 CW beam: N 12m M n N... m t TiTi T ib TgTg TbTb V m-1,N V MN V m,N V mn

On longitudinal HOM excitation for pulsed beams (as in high intensity proton drivers) 2/4 31 May 2010SPL Cavity WG Meeting3

On longitudinal HOM excitation for pulsed beams (as in high intensity proton drivers) 3/4 31 May 2010SPL Cavity WG Meeting4

31 May 2010 SPL Cavity WG Meeting5 I = 40 mA; pulse length 1 ms, R/Q = 100  ; Rep. rate 50 Hz; f HOM = 2.1 GHz; Q 0 = On longitudinal HOM excitation for pulsed beams (as in high intensity proton drivers) 4/4 Power built-up/decay during pulse of 1 ms Maximum power vs. frequency showing principal Fourier components of beam

Power dumped by beam into a HOM 1/4 f (HOM) precisely on beam spectral line 31 May 2010SPL Cavity WG Meeting6 I = 40 mA; pulse length 1 ms, R/Q = 100  ; Rep. rate 50 Hz; f HOM = 2.1 GHz; Q 0 = 10 10

Power dumped by beam into a HOM 2/4 comparison between CW and pulsed beam 7SPL Cavity WG Meeting31 May 2010 CW pulsed 5% Beam tube damping estimations for SPL cavity from presentation “Beam tube damping estimations for SPL cavity “ of 8 March 2010

Power dumped by beam into a HOM 3/4 beam spectral line  f away from resonant frequency of HOM 8SPL Cavity WG Meeting31 May 2010  f= 0.1 MHz  f= 0.01 MHz I = 40 mA; pulse length 1 ms, R/Q = 100  ; Rep. rate 50 Hz; f HOM = 2.1 GHz; Q 0 = 10 10

Power dumped by beam into a HOM 4/4 Courtesy M. Schuh 31 May 2010SPL Cavity WG Meeting9

Preliminary conclusion concerning HOM power dumped into the pulsed cavity  The main beam Fourier components (n·352 MHz) contribute significantly to the HOM power, the 50 Hz Fourier component, however, only marginally; to reduce the HOM power below 100 W, the Q-value of the HOM must be < 10 4  Avoiding the main beam Fourier components by the HOM frequencies within 10 kHz reduces the HOM power significantly, with a tendency to become even smaller for larger Q-values (P 10 7 ) → The HOM power could possibly be reduced by inelastic detuning or an appropriate design of the cavity (though without changing the fundamental mode frequency) with the aim to keep sufficiently off ALL HOM frequencies from the main Fourier components 31 May 2010SPL Cavity WG Meeting10 I = 40 mA; pulse length 1 ms, R/Q = 100  ; Rep. rate 50 Hz; f HOM = 2.1 GHz; Q 0 = 10 10