Page 1 Envisat Validation Workshop – 9 Decembre Esrin ENVISAT PDS Status & Performance.

Slides:



Advertisements
Similar presentations
GEOSS Workshop 20 September 2013 ESRIN P. Bargellini, Ground Segment and Mission Operations Department, Earth Observation Programmes Directorate, European.
Advertisements

Joint EEA-PROMOTE user workshop – 13 June 2008 ESA Earth Observation User Services Earth Observation Programmes Directorate, ESA.
RA-2 & MWR QWG meeting – ESA/ESRIN – 24 March, 2003 Envisat RA-2 and MWR Events since October 2002 Pierre Féménias ESA/ESRIN.
RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation Presentation Overview Rehearsal summary RA-2/MWR data circulation during commissioning phase.
05/Dec/20018th Envisat Plenary Meeting1 RA-2/MWR CCVT readiness status RA-2/MWR CCVT Rehearsal requirements: –It is recommended that the rehearsal focus.
Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 BOUSSOLE David ANTOINE CNRS-LOV, France now at: Curtin University,
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
Information Technology Update Aaron Smallwood Manager, IT Business & Customer Services.
Marine Core Service MY OCEAN WP 13 Thematic Assemby Center for SST.
DOSTAG Meeting #51, 3 rd May 2007 Access to ESA Earth Observation data (past and current missions)
International Polar Year Announcement of Opportunity IPY AO The IPY AO ( was opened on June 15 th 2006 and closed September 25.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Operational Dataset Update Functionality Included in the NCAR Research Data Archive Management System 1 Zaihua Ji Doug Schuster Steven Worley Computational.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
ESA Report to DAI/IPR WG Gian Maria Pinna ESA/ESRIN DAI/IPR meeting Colorado Springs January 2007.
RADARSAT-1/RADARSAT-2/ENVISAT Mission Status Adrian Bohane IICWG St. Petersburg April 2003.
A. Minchella (RSAC c/o ESA-ESRIN) on behalf of ESA EOPI Team ESA Advanced Training Course in Land Remote Sensing, 2 July 2013, Athens, Greece Access to.
Experiences Deploying Xrootd at RAL Chris Brew (RAL)
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
15 Copyright © 2005, Oracle. All rights reserved. Performing Database Backups.
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
Henri Laur, IPY Space Task Group SAR meeting, 5-6 March 2008 Since 20+ years, ESA is increasingly supporting the Cryosphere communities with the provision.
Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
15 Copyright © 2007, Oracle. All rights reserved. Performing Database Backups.
1 24x7 support status and plans at PIC Gonzalo Merino WLCG MB
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
ASI-Eumetsat Meeting Matera, 4-5 Feb CNM Context Matera, February 4-5, 20092ASI-Eumetsat Meeting.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Earth Observation (EO) Archives in Virtual Digital Libraries and GRID Infrastructures: an European View Senior Advisor for EO Applications,
Page 1 ENVISAT Validation Workshop, 9 – 13 Dec 02, ESRIN AATSR Cal/Val Data Distribution Hannah Tait AATSR System Analysis Engineer (EOP-PPP) ESA ESTEC.
Offline shifter training tutorial L. Betev February 19, 2009.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
ERS & ENVISAT for the Ice Community Andrea Celentano IICWG Meeting 2001 – Norway.
Page 1 ENVISAT Validation Review – Frascati – 9-13 December st Envisat Validation Workshop MERIS, December 2002 Conclusions and Recommendations.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Page 1 Envisat Validation Workshop, Campaign Database, 12/12/2002 Envisat Validation Workshop Atmospheric Chemistry Validation Team Ground-Based Measurements.
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
Page 1 Validation Workshop, 9-13 th December 2002, ESRIN ENVISAT Validation Workshop AATSR Report Marianne Edwards Space Research Centre Department of.
ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004.
Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
2. WP9 – Earth Observation Applications ESA DataGrid Review Frascati, 10 June Welcome and introduction (15m) 2.WP9 – Earth Observation Applications.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
19 Copyright © 2004, Oracle. All rights reserved. Database Backups.
GHRSST Science Team Meeting st – 5 th June, 2009, Santa Rosa ESA L2P Operational Service Nigel Houghton ESA / ESRIN NRT and Archive L2P Processing.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Page 1 Jordi Farres Grid and Cloud activities 15/3/2011.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
NASA, CGMS-43, May 2015 Coordination Group for Meteorological Satellites - CGMS Update of the NASA GPM and Precipitation Products and their Availability.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
ENVISAT Validation Workshop Dec, ESRIN 130 ESA Staff (7%) 250 Industry Staff Dec, 2002.
Data Access Operational Interfaces for GMES Contributing Missions
ENVISAT Burcu Bölükbaşı envisat.
GSICS Data Management and Availability to Users
Presentation transcript:

Page 1 Envisat Validation Workshop – 9 Decembre Esrin ENVISAT PDS Status & Performance

Page 2 Envisat Validation Workshop – 9 Decembre Esrin PDS Overall Status and Plans: Points to be addressed Ø Operation strategy (the Kiruna-only and Kiruna-Svalbard scenario) Ø Encountered difficulties and progress Ø Objectives for the validation u Stabilisation of the PDS towards a sustained throughput u Consolidation of the data dissemination u ENVISAT Mission to be operational by end 2002 for a subset of products and services Ø Objective for the Operations phase u Initial Operations phase u Evolution of the operation scenario (Kiruna-Artemis) u Progressive opening of the User services and phase in of the Users

Page 3 Envisat Validation Workshop – 9 Decembre Esrin PDS system (Kiruna Only) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS

Page 4 Envisat Validation Workshop – 9 Decembre Esrin PDS Data Flow 1-LR Level 0 Unconsolidated (Doris, Scia) 2- HR Level 0 Unconsolidated 3- Browses 4- RA2/MWT L 1b Uncosolidated 5- LR Level 2 FD Products PDHS PACs LRAC 1-Consolidated level 0 (Doris, Sciamachy) 2- Consolidated LR level 1b 1-LR Unconsolidated level 0 2- ASAR Wave and MR 3- MERIS RR Level 2 PDCC 1-Auxiliary Data 2- HR Calibration and Configuration 3- Monitoring and Control

Page 5 Envisat Validation Workshop – 9 Decembre Esrin Kiruna Only Scenario data acquisition Ø From Launch to 6 th of November 2002 Ø Kiruna Station Data Reception u Receives the complete global mission data dump ¯ 8 orbits are received nominally ( dump of the previous orbit within the Kiruna visibility) ¯ 4 to 5 orbits out of visibility are recorded and dumped in the first two orbits of the morning, together with the nominal preceding orbit u Receives all recorded ASAR HR and MERIS FR u Receives ASAR HR and MERIS FR in direct visibility Ø Matera Station Operation u Receives ASAR HR and MERIS FR in direct visibility (2 orbits in the morning, 2 orbits in the evening) u Copies the data on D1 tapes, sent to ESRIN u Processing at ESRIN PDHS-E

Page 6 Envisat Validation Workshop – 9 Decembre Esrin Kiruna Blind Orbits Ø 5 consecutive blind orbits (marked 1 to 5) recorded on SSR 1 and 2 Ø Dump of the recorded data over Kiruna on the first two orbits of Kiruna (first orbit marked 6 )

Page 7 Envisat Validation Workshop – 9 Decembre Esrin Kiruna Only Scenario data processing Ø Global Mission archiving and processing strategy u Generation of all level 0 (recovery of any missing level 0 offline over night) u Processing of all level 1B and 2 for the nominal 9 to 10 orbits per day u Dissemination of level 0, level 1B and level 2 products to Cal/Val users from PDHS (DDS, FTP server, media) u All level 0 copied on NTP tapes for the LRAC, where they are consolidated, processed to level 1b, and circulated to PACs, where they are further processed to level 2. Ø Regional Mission archiving and processing Strategy u All ASAR HR and MERIS FR (Kiruna and Matera) processed to level 0 and sent, on NTP tapes, to the relevant PACs (recovery of any missing level 0 offline over night) u Processing of all level 1B at PACs and dissemination to Cal/Val users (media)

Page 8 Envisat Validation Workshop – 9 Decembre Esrin Mission Planning Ø Global Mission defined using the RGT ( Reference Ops Mission generation Tool) Ø Regional Mission u ASAR operation and on request processing defined by the Cal/Val coordinator via a USF script u MERIS operation and on request processing defined by the Cal/Val coordinator via a script u Background mission defined by the Mission Manager and entered via the USF u Additional PR images requested by ESRIN via the USF Ø All above nominally defined one week ahead of its execution schedule

Page 9 Envisat Validation Workshop – 9 Decembre Esrin Problems Encountered Ø Lack of robustness of the PDS facilities; Ø Missing/incomplete functionalities (e.g. concatenation of product slices to make complete instrument operation segments, incomplete follow up and reporting of orders, recovery of failed orders, etc…); Ø Misfit between the installed Kiruna configuration and the Kiruna only scenario Ø Very poor reporting capabilities Ø Irregular production throughput at PDHS and LRAC Ø Weakness of the data dissemination scenario mainly linked to the Archiving Facility architecture and the dissemination scenario To be noted: Ø The Kiruna Only scenario is much more demanding for this station than any future nominal scenario Ø Testing of the operation, pre-launch, was very much constrained by the limited set of satellite simulated data available ( 2 orbits)

Page 10 Envisat Validation Workshop – 9 Decembre Esrin Corrective Actions Implemented Ø PDCC ( mission planning): problems circumvented and planning loop stabilised Ø PDHS configuration substantially upgraded ( processing facility, archiving facility) Ø Dissemination scenario (electronic and media) optimised in view of the new configuration, in particular to minimise tape access Ø Procedures and scripts put in place to recover failures and missing products Ø Instrument Processors corrected to reflect current Cal/Val status and Ø Kiruna – Svalbard scenario implemented and active on 6 th of November 2002

Page 11 Envisat Validation Workshop – 9 Decembre Esrin PDS system (Kiruna-Svalbard) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS Svalbard X-band data ISPs

Page 12 Envisat Validation Workshop – 9 Decembre Esrin Kiruna-Svalbard Scenario data processing Ø Global Mission archiving and processing strategy u Generation of all level 0, 1B and 2 for the orbits recovered in Kiruna (9/10) within 3 hours from sensing (recovery plan during the night) u Generation ay PDHS-E of all level 0, 1B and 2 for the orbits recovered in Svalbard (4/5), after transmission to ESRIN via DDS, i.e. within 12 hours from sensing u Dissemination of level 0, level 1B and level 2 products to Cal/Val users from PDHS-K (DDS, FTP server, media) and PDHS-E (FTP server, media) u All level 0 copied on NTP tapes for the LRAC, where they are consolidated, processed to level 1b, and circulated to PACs, where they are processed to level 2 (1 week delay wrt Kiruna only scenario). Ø Regional Mission archiving and processing Strategy u All ASAR HR and MERIS FR processed to level 0 and sent, on NTP tapes, to the relevant PACs (recovery of any missing level 0 offline over night). Kiruna within 3 hours, Matera within 5 days, Svalbard within 2 weeks (sent to ESRIN via DLT) u Processing of all level 1B at PACs and dissemination to Cal/Val users (media)

Page 13 Envisat Validation Workshop – 9 Decembre Esrin Data Distribution Current Status Ø Global Mission Data Products u Meteo products on FTP server u Media copying at PDHS-K of level 1B and 2 products for distribution to Cal/Val PIs u Product dissemination via DDS and FTP server u Electronic dissemination enhanced through upgrade of disk space, change in subscription strategy and data-driven implementation for systematic dissemination Ø Regional Mission Data Products u ASAR and MERIS FR images produced at PACs u NRT production at PDHS-K has started

Page 14 Envisat Validation Workshop – 9 Decembre Esrin Acquisition Planning Ø Operational Status at 1st Dec. u Operated in manual mode  no planning on week-ends & holidays u ASAR/MERIS HR planned as per user requests (Cal/Val, PIs, DEs), 20% rejections of Cat1 requests due to higher priority Cal/Val requests u Background Regional Mission progressively implemented as per HLOP requirements u All confirmed requests are scheduled – no deletion after confirmation of planning Ø Performances u Nominal planning accepted up to 10 working days before acquisition u Late planning accepted up to 4 working days before acquisition u Emergency planning only exceptionally up to 2 working days u No On-call service during the weekends u Acquisition reporting required to confirm successful acquisition Operations Responsible: S. Jutz

Page 15 Envisat Validation Workshop – 9 Decembre Esrin Production Planning Ø Operational Status at 1st Dec. u Operated in semi-manual mode  no delta-plans on week-ends & bank holidays u Generating plans for ESA Stations (PDHS-K/E, PDAS-S/F, LRAC), PACs (all), Foreign Stations (Tromsø, Gatineau, Prince Albert) u Station reporting disabled due to excessive load on the GSP Ø Performances u Fragile database design causes inconsistency with in avg. 1 crash event / month u Production plans generation too long: 4.5 hours in average (PDHS-K: avg. 1.5 hours)

Page 16 Envisat Validation Workshop – 9 Decembre Esrin Catalogues Ø Status at 1st December u Online catalogues opened for browse of HR data. Other instrument catalogues and online ordering not activated until data quality and data handling chain sufficiently robust to serve demand. u EOLI-Envisat (MUIS) online catalogue opened to all users since Oct for browse of HR data, performance good, does not yet have ordering interface u DESCW offline catalogue made available to all users in Oct

Page 17 Envisat Validation Workshop – 9 Decembre Esrin Envisat on-line catalogue (open since mid-October)

Page 18 Envisat Validation Workshop – 9 Decembre Esrin Envisat on-line catalogue (browse images) Japan – 5 Dec ASAR WS Mekong River – 26 Oct ASAR IM MERIS AATSR

Page 19 Envisat Validation Workshop – 9 Decembre Esrin Acquisition performance Ø PDHS-K (Kiruna, X-band) Ø PDAS-F (Matera, X-band) Ø PDAS-S (Svalbard, X-band) TransmittedAcquiredSuccess rate HR % LR % TransmittedAcquiredSuccess rate HR % LR (MERIS FR) % TransmittedAcquiredSuccess rate HR % LR %

Page 20 Envisat Validation Workshop – 9 Decembre Esrin Production performance ( (*) does not take into account satellite unavailability (*)

Page 21 Envisat Validation Workshop – 9 Decembre Esrin Circulation and dissemination performance Ø In the last six month, 1600 tapes (NTP) circulated between the various centers, corresponding to products Ø In the last six month, products disseminated to users by media Ø In the last two weeks, products distributed to users via electronic link, (12000 via DDS, via ftp)

Page 22 Envisat Validation Workshop – 9 Decembre Esrin Maintenance performance Ø On 1st of January 2002, 400 open SPRs Ø On 1st of December 2002, 300 open SPRs Ø During that period, 700 new SPRs opened. Ø Reception and installation of 59 system deliveries corresponding to 106 facilities, and 2000 installations since launch

Page 23 Envisat Validation Workshop – 9 Decembre Esrin Future Plans Ø Upgrade of the PDCC and PDHS-E HW u PDCC WS (racked) u PDHS-E WS (racked) u PDHS-E processing nodes (to cope with Artemis scenario) u All FEPS (obsolete HW, no further maintenance) Ø Upgrade of the PDS to cope with reprocessing, in particular the dissemination to users Ø Kiruna-Artemis scenario to be tested mid February 2002, operational in March 2003

Page 24 Envisat Validation Workshop – 9 Decembre Esrin PDS system (Kiruna-Artemis) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS Svalbard X-band data ISPs Ka-band dataDRS TM/TC DRS DRS Mission Control center Ka-band data

Page 25 Envisat Validation Workshop – 9 Decembre Esrin Services to non-Cal/Val users Ø Beyond Commissiong Phase services to Cal/Val teams, progressive access to Envisat products and services to non-Cal/Val users: u started at mid-September, u by staggered groups of users (essentially AO projects), u supported by order desk and help desk, u with reduced set of products and services: ¯ ASAR Image Mode and Wide Swath Mode level 1b products, ¯ MERIS Full Resolution level 1b products, ¯ limited amount of products by projects. Ø Progressive access also granted to Distributing Entities in order to smooth the transition to a fully operational commercial distribution.

Page 26 Envisat Validation Workshop – 9 Decembre Esrin Conclusion Ø Some of the PDS facilities still require consolidation Ø Substantial progress on consolidating the planning, production and dissemination of products since the Svalbard scenario Ø PDS platform needs to be upgraded to support reprocessing Ø Transition to Initial Operations phase following ORR1 (gradual phase-in of non cal/val projects and commercial users) Ø ORR 2 and full operations expected mid-2003