ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.

Slides:



Advertisements
Similar presentations
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
Advertisements

WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
3GPP Rel-13 Interworking discussions
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
App-ID Discussion Group Name: ARC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 31 July 2014 Agenda Item: TBD.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
Supporting long polling Group Name: ARC WG Source: SeungMyeong, LG Electronics, Meeting Date: x-xx Agenda Item: TBD.
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Matching Resources with CSFs Group Name: WG2 (ARC) Source: Hongbeom Ahn, LG Electronics, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
3GPP Rel-13 Interworking discussions
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
TIA – ETSI workshop Conclusions March 22nd Objectives Harmonize the documents into a single set of documents (requirements, definition, architecture.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Authorization Architecture Discussion Group Name: SEC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 28 MAY, 2014 Agenda.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Reasons for CSF Clean-up (Issues & Next Steps) Group Name: WG2 Source: Syed Husain – NTT DOCOMO Meeting Date: (ARC_9.3) Agenda Item: 6 DOC#:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
TS-0004 guideline for new resource type definition Group Name: PRO WG Source: SeungMyeong JEONG, LG Electronics Meeting Date: Agenda Item: TS.
3GPP Rel-13 Interworking discussions Group Name: TP #18 Source: Rejesh Bhalla, ZTE Corporation, Meeting Date: Agenda Item:
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
3GPP interworking in R3 Group Name: ARC
WG1 status report to TP#15 Group Name: oneM2M TP15
3GPP Rel-13 Interworking discussions
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
3GPP Interworking Abstraction
Considering issues regarding handling token
API SC6 Valves and Wellhead Equipment
Presentation transcript:

ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES

Opening and Logistics 1Opening of meeting Meeting started at 15:45 local time. 1.2Schedule 1.3Attendees 2Review and Approval of Agenda – oneM2M-ARC R04 3Review and Approval of previous Minutes – Minutes (-0271R01 agreed) – Stage 2 and Stage 3 Message Flows need to be clarified 2

Achievements of the Meeting 1.Architecture Part 1 agreed and frozen The last piece of input from TTA was incorporated (-0291R01) after TTA officially confirmed the status of (-0248R06). The TR was agreed and frozen and would be circulated for a 14-day approval. 2.Architecture Part 2 agreed and frozen The TR (-0286R02) was agreed and frozen. The TR will be circulated for a 14-day approval. 3.Progress Architecture Technical Specification Proposed 13 Common Service Functions (CSFs) for Common Service Entity (CSE) ( R04). Agreed the definition of X, Y, Z reference points (-0280R03). Developed Stage 2 and Stage 3 worksplit (jointly with WG3) (-0295R01) Agreed initial draft guidelines for high level API ( -0287R03) Initial set of oneM2M identifiers defined (-0281R02) Functional architecture revised (-0275R03) 3

Status and Planning Review work Programme Status – During the joint meeting with WG1, it was assessed that the target date, Q4 2013, for completing the first release still looks promising. – The Rapporteur assessed a 20% completion of the TS work. Naming of “Device/Gateway” v.s. “Nodes” was not discussed – Will be handled in an electronic meeting. CSE instances in a device/gateway could not be resolved – Will be handled in an electronic meeting. Planning for next Meeting(s) – Three Conference call meetings on July 8, 18, and 22 at 13:00GMT – TP#6: Toronto, Canada, August 5-9,