HUGS 4 Africa Nov, 2014 Bedroom built in 4 days Gatuto Kenya.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Dehradun DEHRADOON PHASE – I *All inclusive cost *Including Car parking *Club Membership Extra Registration amount i.e. Rs 100,000/- +10% of cost price.
MARKETED BY. STRUCTURE: RCC framed structure, with brick work in cement motar INTERNAL/EXTERNAL PLASTER: Mixture of fine river sand.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
By: Stephanie Marquette Kishwaukee College To begin designing my own house, I started researching some floor plans online. After looking at some.
Hospital of the Future Construction Update as of Dec. 3, 2010.
WELCOME. Eco Pine Homes-I (Dharampur Project)
St. Joseph’s Building Project. Introduction This power point will let you know what is happening with the building project. It goes from the beginning.
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
SEN BUILT versus UNBUILT SEN BUILT versus UNBUILT Source: Environment and energy sustainability: An approach for India, McKinsey & Company.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.
A project of Skywood Developers Pvt. Ltd. WELCOME TO.
Structural Analysis and Design Active Members 1. Structural Analysis & Design by V.N.Murthy Brajesh Vyas 2.Structural working drawing & 3D views by Neeraj.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Open House 3 Bedroom 4 bathroom Large rooms Lots of windows 2 Balconies Open Monday – Friday Hours: 12pm-4pm.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
ASSIGNMENT Begin on page 197 “The Foundation”.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
DER – Before, During and After: A Homeowner’s Perspective.
Project: Location Map Laa Capitol is the new residential project offering from Laa Builders & Developers. Located in the fast developing residential.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Drawing & Drafting Tools. T-Square Why is the letter “T” in its name? Why is the word “square” in its name?
Rooms of the house By: Shahaf Hauyt Class: fifth grade/1 Date:2/12/14 Teacher: Mrs. Arbel Sokolover.
Green Concepts LEED Everything from the Motel was recycled.
IET 120 – CONSTRUCTION DESIGN
THE CRANBEL COURT CITIVIEW AREPO. We are pleased to announce the launch of our new and elegant product, the Cranbel Courts Apartment, Citiview, Arepo.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Chapter 38 Alternative Layout Techniques. Introduction Basic methods for drawing a section with a concrete slab and truss roof –Will not meet needs of.
Enjoying my home. Say words with these sounds [а:] [υ:] [ǽ]
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
The school building We have been raising school funds for the new building through things like the 100 club and the Jewellery Party.
Call us : / AMAATRA HOMES NOIDA EXTENSION.
Shree Chand Homes Presents GOLF VIEW HOMES Situated at Greater Noida, Dadri Road next to Ansal’s Golf Link II a very close location From proposed Metro.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Dream Bedroom Individual Design Plan Lauren Wooten.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
DREAM BUILDERS, INC. SKETCH PLAN OF MLD DREAM BUILDERS, INC.
Embassy Boulevard Yelahanka, Bangalore For Enquiry Call
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
A HOUSE.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Major Steps In Building a SFR
EDENSVILLE ESTATE SIMAWA.
Gantt Chart Presentation Name Course Name
* 07/16/96 Site Development Plan * ##.
DAMP-PROOFING AND WATER-PROOFING COURSE
Objective 6.02 part 1: Recognize components of construction
Embodied Energy Analysis of a Pre-cast Building System
Mrs. RESHMA RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Planning and Scheduling a SIMPLIFIED Construction Project
Building Construction I Sofia Sebastian 1
Gantt Chart.
Wates CBE Learning Operation defects: Snag sheet slide presentation
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
ZUMTOBEL TUBILUX PC 75W LED EVG Description
Presentation transcript:

HUGS 4 Africa Nov, 2014 Bedroom built in 4 days Gatuto Kenya

Site Survey hugs4africa Bedrm In 4 days Nov 14 d1211/20/2014

Hauling Ballast (gravel) and Sand 10 km very off road to the site hugs4africa Bedrm In 4 days Nov 14 d1311/20/2014

Day 1Termite Protective Paint Green Shirt HUGS almost Blind Student hugs4africa Bedrm In 4 days Nov 14 d1411/20/2014

Day 1 Cement mixer 11/20/2014hugs4africa Bedrm In 4 days Nov 14 d15

Day 1 Slab and Curb done hugs4africa Bedrm In 4 days Nov 14 d1611/20/2014

Day 2 Framed, Metal roof & walls hugs4africa Bedrm In 4 days Nov 14 d1711/20/2014

Day 3 Windows & Ceiling hugs4africa Bedrm In 4 days Nov 14 d1811/20/2014

Day 4 Finished floor hugs4africa Bedrm In 4 days Nov 14 d1911/20/2014

New bed and bedding 11/20/2014hugs4africa Bedrm In 4 days Nov 14 d110

Moving In hugs4africa Bedrm In 4 days Nov 14 d11111/20/2014

Terry Improvising Toilet 11/20/2014hugs4africa Bedrm In 4 days Nov 14 d112

Moving in HIV TB Hospice Patient hugs4africa Bedrm In 4 days Nov 14 d11311/20/2014

Crew and tools 11/20/2014hugs4africa Bedrm In 4 days Nov 14 d114

HUGS for Africa Thank you Helping Underprivileged Groups through Sponsorship 15hugs4africa Bedrm In 4 days Nov 14 d111/20/2014