Kenneth J. Andrews EMP-5179-12-1 Final Exam  Closed book – no ‘cheat sheets’ or other reference material  Translation devices are OK  Duration will.

Slides:



Advertisements
Similar presentations
Lean Six Sigma 1 What is Lean Six Sigma (LSS)? Lean –Process speed –How quickly things move through a process –Primarily focused on.
Advertisements

Lean Manufacturing.
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
Guide to Business Improvement Tools
ISO 9001:2000 Certified Next Steps? Where do we go from here?
LeanSigma ® Facilitator Training Module 9 – Just in Time.
O How to Understand & Apply Lean in the Workplace Professional Development Lean Series Charles M. Saunders Lean Libra Consult, LLC November 3, 2010 Oregon.
Supplier Development Kaizen Implementation Kit
© 2009 Factory Strategies Group LLC. All rights reserved. Lean Sales Lean Enterprise Series.
Kenneth J. Andrews EMP Gen-X: Manufacturing Analysis What is the process?Build & test of AXIS machine for a specific Customer Who is the customer?MegaPower-
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Value Stream Mapping.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Overview of Lean Six Sigma
Lean Office Overview (Sample Slides) Superfactory Excellence Program™
Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Dr. Ken Andrews High Impact Facilitation Fall 2010.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
LEAN Overview Eliminating Waste. Overview LEAN & Six Sigma LEAN Principles Customer Needs Employees Gemba Walks / Ohno Circles Kaizen 8 Wastes Tools Value.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
© OpStat Group Inc. All rights reserved. 1 A Lean Analysis Methodology Using.
Group Exercise Instructions
Standard Business Roadmap Step by Step Guide. Standard Business Roadmap The acid test for ANY system is; “Does it work ?” This system is no different.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
The Breakthrough Strategy Process Check
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
Applying Lean Manufacturing Philosophies and Visual Factory Philosophies in the Pneumatic Valves Assembly Cell at Hamilton Sundstrand A Senior Project.
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
G-1 Rapid Process Improvement Event Overview Dewey Warden.
Are You People Ready for Lean? Presented by Doug Howardell.
Advancing Productivity, Innovation, and Competitive Success APICS Lean Enterprise Workshop Series An Introduction June 2008.
Agenda Week 1 Define Day 1 Introductions & Agenda LSS Overview
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Module #5: Value-Stream Mapping & Quick Set-Up Dr. Ken Andrews High Impact Facilitation.
Lean Six Sigma An Introduction to Process Improvement.
2 Purpose, Content and Value The Purpose of the MLC Library is to provide members with lean training material and recommended knowledge resources for.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
The Value Driven Approach
Process Characteristics
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Contact Deb Wallace at TMAC (817) or go to for more information Automation & Robotics Research Institute  The University of Texas.
AAA Arizona GB training Curriculum Modification Reviewed other Client’s 3/3/4 curriculum Considered AAA Arizona project needs –Sequence of modules –Need.
Implementation of Lean at Rheem Manufacturing
LEAN What? How? What helps ? Conclusion. LEAN – What? RETHINKING & REDESIGN OF BUSINESS PROCESS SHORTENED LEAD TIMES REDUCED PROCESS WASTES IMPROVED CUSTOMER.
1 Lean Manufacturing Overview Lean Manufacturing Overview
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
1 Lean Manufacturing: An overview Presented By: Laura S. Brown Industrial and Systems Engineering Senior Capstone Mercer University School of Engineering.
Value Stream Management for Lean Healthcare: The Value Stream Management (VSM) Process IDM 404 Dr. Joan Burtner Spring 2015 Industrial Management Case.
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
Lean Six Sigma Road Map Improvement Process Road Map
Introduction to Value Stream Mapping & Management
Lean Manufacturing Series
BUS 430 Help Bcome Exceptional / snaptutorial.com
Pull Manufacturing and Just In Time
ISCOM 472 Help Bcome Exceptional / iscom472.com
ISCOM 472 Course Experience Tradition / iscom472.com
iscom 472 mart Your world/iscom472martdotcom
Welcome to my presentation
Introduction to Materials Management
MGS 4020 Business Intelligence LSS Jul 19, 2018
ISE 468 ETM 568 Spring 2017 Dr. Joan Burtner
IDM 404 Dr. Joan Burtner Spring 2015
Implementation of Lean at Rheem Manufacturing
Dan Protzman - Biography
Presentation transcript:

Kenneth J. Andrews EMP Final Exam  Closed book – no ‘cheat sheets’ or other reference material  Translation devices are OK  Duration will be 90 minutes, followed by a 15 minute break  Please read the questions carefully  Please answer the questions thoughtfully and briefly  Clearly written thoughts are the most important assessment criterion  Marks will be posted on the website soon ~ 2-3 weeks  Papers will not be returned

Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Dr. Ken Andrews High Impact Facilitation Fall 2010

Kenneth J. Andrews EMP Workshop Priorities  Introduce only very practical tools & techniques.  Focus on near-term implementation.  Apply real-world examples & experience.  Make it relevant to your work.  Create a positive learning environment.

Kenneth J. Andrews EMP Program Overview (Modules & Weeks) 7. Quality at Source 8. Customer Ints. 9. QFD & DFM 10. Teams & Change 11. Term Papers 1. Intro. To Manuf. Systems 2. Lean & JIT 3. Push vs. Pull Process Impr. 4. TQ Tools & Techs. 5. Value Stream Maps 6. Manuf. Metrics 12. Final Exam (Dec 6) There IS Class on Nov 8 No Class on October 11          

Kenneth J. Andrews EMP The Lean Factory Increased Productivity Reduced WIP Customer Focus Reduced Lead-Time Kanban / Demand Pull Cellular / Flow / TAKT Time Visual Systems/5S Quick Changeover Quality at the source Batch Reduction TeamWork Low Variability Contin. Improvement Value Stream Mapping Customer Driven Waste Reduction JIT Total Quality Right Metrics #2 #3 #7 #5 #3#4 #10 #8#5 #6#7 QFD #9 Critical Elements of the Lean Enterprise

Kenneth J. Andrews EMP Company Actions: What Can We Do? Fact-based management (Performance Measurement, KPIs) Do you know your competitive position? Do you know your industry best practice? Do you have a balanced scorecard? Do you have a means of monitoring critical inputs and processes?

Kenneth J. Andrews EMP Company Actions: What Can We Do? Mobilise your people Process focus Visual management Lean manufacturing Six Sigma Teamwork Delegation / Respect / Trust Change manifesto

Kenneth J. Andrews EMP Your World (Macro View) Customers SuppliersCompetitors Resources Systems & Processes

Kenneth J. Andrews EMP Manufacturing is More Than Making Things

Kenneth J. Andrews EMP Remember Your Responsibilities to the Environment